Thermal modernisation of public buildings in the area of Dębowa Łębowa Łąka, Dębowa Łąka and Grand Pułkowo. (Q98196): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to increase energy efficiency and reduce CO2 emissions by means of thermo-modernisation of a rural community building in Veliko Pułków and a remiola building in Dępowski. The health work of the remizo building — day-care centre building includes: • Internal sanitary sewers• the internal water supply system• the internal heating system• the internal heating system• the mechanical ventilation• engineering of the heat pu...) |
(Created claim: summary (P836): The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English) | |||||||||||||||
Property / summary: The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 23:17, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the area of Dębowa Łębowa Łąka, Dębowa Łąka and Grand Pułkowo. |
Project in Poland financed by DG Regio |
Statements
1,074,583.52 zloty
0 references
1,343,229.41 zloty
0 references
80.0 percent
0 references
17 December 2015
0 references
31 January 2018
0 references
GMINA DĘBOWA ŁĄKA
0 references
Realizacja projektu ma na celu zwiększenie efektywności energetycznej oraz zmniejszenie emisji CO2 poprzez termomodernizację budynku świetlicy wiejskiej w Wielkim Pułkowie oraz budynku remizo-świetlicy w Dębowej Łące. Prace w branży sanitarnej dla budynku remizo - świetlicy w Dębowej Łące obejmują: •Wewnętrzną kanalizację sanitarną •Wewnętrzną instalację wodociągową •Wewnętrzną instalację centralnego ogrzewania •Wentylacją mechaniczną •Technologię pompy ciepła i kotła olejowego •Demontaż istniejących wewnętrznych instalacji sanitarnych •Zewnętrzną instalacją cieplną. W ramach branża elektrycznej zaplanowano: •Oświetlenie LED zewnętrzne •Oświetlenie LED wnętrzowe •Rozdzielnica główna i wydziałowe •Linie wlz •Instalacja oświetlenia i gniazd wtyczkowych, siłowych •Zasilanie i sterowanie urządzeń wentylacji i ogrzewania •Połączenia wyrównawcze •Instalacja odgromowa •Prace demontażowe Branża budowlana obejmuje natomiast: •Roboty rozbiórkowe •Piwnicę •Roboty wewnątrz budynku •Roboty zewnętrzne Dla budynku świetlicy wiejskiej w Wielkim Pułkowie w zakresie instalacji centralnego ogrzewania przewidziano: •Roboty wyodrębnione •Roboty rozbiórkowe •Instalacje C.O. •Instalacje technologiczne - kotłownia •Roboty pomocnicze i wentylacja W ramach branży budowlanej przewidziano natomiast: •Wykonanie ocieplenia ścian budynku •Ocieplenie cokołu budynku wraz ze ścianami fundamentowymi do głębokości min. 80cm poniżej poziomu terenu •Ocieplenia stropodachu i roboty towarzyszące •Remont kominów •Ocieplenie stropu piwnicy •Wymiana stolarki drzwiowej zewnętrznej •Utwardzenie terenu •Roboty towarzyszące •Schody zewnętrzne prowadzące na scenę •Schody zewnętrzne •Roboty wykończeniowe (malowanie, szpachlowanie, okładziny ścian i sufitów) W ramach branży elektrycznej przewidziano: •wymianę instalacji elektrycznej na nową wraz z montażem i wymianą lamp na energooszczędne (Polish)
0 references
The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English)
15 October 2020
0 references
Identifiers
RPKP.03.03.00-04-0030/16
0 references