Thermal modernisation of public buildings in the area of Dębowa Łębowa Łąka, Dębowa Łąka and Grand Pułkowo. (Q98196): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to increase energy efficiency and reduce CO2 emissions by means of thermo-modernisation of a rural community building in Veliko Pułków and a remiola building in Dępowski. The health work of the remizo building — day-care centre building includes: • Internal sanitary sewers• the internal water supply system• the internal heating system• the internal heating system• the mechanical ventilation• engineering of the heat pu...)
(‎Created claim: summary (P836): The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and...)
Property / summary
 
The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English)
Property / summary: The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English) / rank
 
Normal rank
Property / summary: The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:17, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public buildings in the area of Dębowa Łębowa Łąka, Dębowa Łąka and Grand Pułkowo.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,074,583.52 zloty
    0 references
    257,900.04 Euro
    13 January 2020
    0 references
    1,343,229.41 zloty
    0 references
    322,375.06 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    17 December 2015
    0 references
    31 January 2018
    0 references
    GMINA DĘBOWA ŁĄKA
    0 references
    Realizacja projektu ma na celu zwiększenie efektywności energetycznej oraz zmniejszenie emisji CO2 poprzez termomodernizację budynku świetlicy wiejskiej w Wielkim Pułkowie oraz budynku remizo-świetlicy w Dębowej Łące. Prace w branży sanitarnej dla budynku remizo - świetlicy w Dębowej Łące obejmują: •Wewnętrzną kanalizację sanitarną •Wewnętrzną instalację wodociągową •Wewnętrzną instalację centralnego ogrzewania •Wentylacją mechaniczną •Technologię pompy ciepła i kotła olejowego •Demontaż istniejących wewnętrznych instalacji sanitarnych •Zewnętrzną instalacją cieplną. W ramach branża elektrycznej zaplanowano: •Oświetlenie LED zewnętrzne •Oświetlenie LED wnętrzowe •Rozdzielnica główna i wydziałowe •Linie wlz •Instalacja oświetlenia i gniazd wtyczkowych, siłowych •Zasilanie i sterowanie urządzeń wentylacji i ogrzewania •Połączenia wyrównawcze •Instalacja odgromowa •Prace demontażowe Branża budowlana obejmuje natomiast: •Roboty rozbiórkowe •Piwnicę •Roboty wewnątrz budynku •Roboty zewnętrzne Dla budynku świetlicy wiejskiej w Wielkim Pułkowie w zakresie instalacji centralnego ogrzewania przewidziano: •Roboty wyodrębnione •Roboty rozbiórkowe •Instalacje C.O. •Instalacje technologiczne - kotłownia •Roboty pomocnicze i wentylacja W ramach branży budowlanej przewidziano natomiast: •Wykonanie ocieplenia ścian budynku •Ocieplenie cokołu budynku wraz ze ścianami fundamentowymi do głębokości min. 80cm poniżej poziomu terenu •Ocieplenia stropodachu i roboty towarzyszące •Remont kominów •Ocieplenie stropu piwnicy •Wymiana stolarki drzwiowej zewnętrznej •Utwardzenie terenu •Roboty towarzyszące •Schody zewnętrzne prowadzące na scenę •Schody zewnętrzne •Roboty wykończeniowe (malowanie, szpachlowanie, okładziny ścian i sufitów) W ramach branży elektrycznej przewidziano: •wymianę instalacji elektrycznej na nową wraz z montażem i wymianą lamp na energooszczędne (Polish)
    0 references
    The aim of the project is to increase energy efficiency and reduce CO2 emissions through thermal modernisation of the rural common room building in Wielki Pułków and the building of a firehouse in Oak Łębowa Łące. Work in the sanitary industry for the building of the house – common room in Oak Łębowa include: •Internal sanitary sewerage •Inner water supply system •Inner central heating system •Mechanical ventilation •Technology of heat pump and oil boiler • Dismantling of existing internal sanitary installations •External heat installation. Within the electricity sector, the following are planned: •External LED lighting •Indoor LED lighting •Main and departmental divider •Wlz lines •Installation of lighting and power sockets • Power supply and control of ventilation and heating devices •Compensation connections •Shouting installation • Dismantling work The construction industry includes: Demolition works •Piwnica •Robots inside the building •External works For the rural common room building in Wielki Pułków as regards the central heating system: •Distributed robots •Deliveraging works •Installations of C.O. •Technical installations – boiler room •Auxiliary works and ventilation As part of the construction industry, the following are planned: •Making warming of the walls of the building •Warming of the building’s pedestal with foundation walls to a depth of min. 80 cm below the ground level •The warming of the ceiling and accompanying works •Repair of the chimneys •The insulation of the basement ceiling •External roofing works •External staircase leading to the stage •External staircases •Finishing works (painting, covering, scattering) • replacement of the electrical system with new installation and replacement of lamps for energy-efficient (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.03.03.00-04-0030/16
    0 references