Increase in the energy efficiency of the Public Schools Group building in Chełmsk Śląskie (Q95677): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is a thermal renovation of a building of the Public Schools Group in Chełmsk Śląskie, Chełmsk Śląskie (ul. Colony 14). Until now, an energy audit, technical documentation and a feasibility study have been developed. The works have not started. The project does not require a building permit. The applicant submitted the notification of the works. The project shall be an independent unit of analysis and shall include all the investmen...)
(‎Created claim: summary (P836): The subject of the project is the thermal modernisation of the building of the Silesian Weaver School Complex in Chełmsko Śląski (ul. Cologne 14. So far, energy audits, technical documentation and feasibility studies have been developed. Construction work has not been started. The project does not require a construction permit. The applicant has submitted construction works. The project is a stand-alone unit of analysis and covers all the invest...)
Property / summary
 
The subject of the project is the thermal modernisation of the building of the Silesian Weaver School Complex in Chełmsko Śląski (ul. Cologne 14. So far, energy audits, technical documentation and feasibility studies have been developed. Construction work has not been started. The project does not require a construction permit. The applicant has submitted construction works. The project is a stand-alone unit of analysis and covers all the investment tasks necessary to ensure the functionality and interoperability of the infrastructure immediately after completion of the material scope.The project includes: Task 1: Increase the energy efficiency of the building of the Public Schools Complex in Chełmsko Śląski, i.e. 1.1 Measure 1 – Project and cost documentation; IT’S 1.2. Action No 2 – Feasibility study; IT’S 1.3. Action No. 3 – General construction works (modernisation of partitions – ventilated stropods, wall on ground, outer wall, stropodach gymnasium, OZ LUK “Gravitational ventilation”, OZ 2 “Gravitational ventilation”, DZ 2 “Gravitational ventilation”, modernisation of hot water installations, modernisation of central heating system, modernisation of heat source – installation of two boilers; IT’S 1.4. Action No 4 – investor supervision, 1.5. Action No. 5 – Author supervision and Task No. 2 Promotional measures, Action No. 1. Promotion of the project – information board; Action 2. Project promotion – commemorative plaque as well as cost-free forms of promotion. The applicant, Investor, Beneficiary and Investment Operator will be Lubawka Municipality. The project will not be implemented in partnership, there will be no other actors on behalf of the Applicant. The project is not a large project, it generates no income and is not covered by public aid. (English)
Property / summary: The subject of the project is the thermal modernisation of the building of the Silesian Weaver School Complex in Chełmsko Śląski (ul. Cologne 14. So far, energy audits, technical documentation and feasibility studies have been developed. Construction work has not been started. The project does not require a construction permit. The applicant has submitted construction works. The project is a stand-alone unit of analysis and covers all the investment tasks necessary to ensure the functionality and interoperability of the infrastructure immediately after completion of the material scope.The project includes: Task 1: Increase the energy efficiency of the building of the Public Schools Complex in Chełmsko Śląski, i.e. 1.1 Measure 1 – Project and cost documentation; IT’S 1.2. Action No 2 – Feasibility study; IT’S 1.3. Action No. 3 – General construction works (modernisation of partitions – ventilated stropods, wall on ground, outer wall, stropodach gymnasium, OZ LUK “Gravitational ventilation”, OZ 2 “Gravitational ventilation”, DZ 2 “Gravitational ventilation”, modernisation of hot water installations, modernisation of central heating system, modernisation of heat source – installation of two boilers; IT’S 1.4. Action No 4 – investor supervision, 1.5. Action No. 5 – Author supervision and Task No. 2 Promotional measures, Action No. 1. Promotion of the project – information board; Action 2. Project promotion – commemorative plaque as well as cost-free forms of promotion. The applicant, Investor, Beneficiary and Investment Operator will be Lubawka Municipality. The project will not be implemented in partnership, there will be no other actors on behalf of the Applicant. The project is not a large project, it generates no income and is not covered by public aid. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the thermal modernisation of the building of the Silesian Weaver School Complex in Chełmsko Śląski (ul. Cologne 14. So far, energy audits, technical documentation and feasibility studies have been developed. Construction work has not been started. The project does not require a construction permit. The applicant has submitted construction works. The project is a stand-alone unit of analysis and covers all the investment tasks necessary to ensure the functionality and interoperability of the infrastructure immediately after completion of the material scope.The project includes: Task 1: Increase the energy efficiency of the building of the Public Schools Complex in Chełmsko Śląski, i.e. 1.1 Measure 1 – Project and cost documentation; IT’S 1.2. Action No 2 – Feasibility study; IT’S 1.3. Action No. 3 – General construction works (modernisation of partitions – ventilated stropods, wall on ground, outer wall, stropodach gymnasium, OZ LUK “Gravitational ventilation”, OZ 2 “Gravitational ventilation”, DZ 2 “Gravitational ventilation”, modernisation of hot water installations, modernisation of central heating system, modernisation of heat source – installation of two boilers; IT’S 1.4. Action No 4 – investor supervision, 1.5. Action No. 5 – Author supervision and Task No. 2 Promotional measures, Action No. 1. Promotion of the project – information board; Action 2. Project promotion – commemorative plaque as well as cost-free forms of promotion. The applicant, Investor, Beneficiary and Investment Operator will be Lubawka Municipality. The project will not be implemented in partnership, there will be no other actors on behalf of the Applicant. The project is not a large project, it generates no income and is not covered by public aid. (English) / qualifier
 
point in time: 15 October 2020
Timestamp+2020-10-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:33, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase in the energy efficiency of the Public Schools Group building in Chełmsk Śląskie
Project in Poland financed by DG Regio

    Statements

    0 references
    2,329,078.38 zloty
    0 references
    558,978.81 Euro
    13 January 2020
    0 references
    2,740,092.2 zloty
    0 references
    657,622.13 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 September 2015
    0 references
    3 October 2017
    0 references
    GMINA LUBAWKA
    0 references
    0 references
    Przedmiotem projektu jest termomodernizacja budynku Zespołu Szkół Publicznych im. Tkaczy Śląskich w Chełmsku Śląskim (ul. Kolonia 14). Dotychczas opracowano audyt energetyczny, dokumentację techniczną oraz studium wykonalności. Roboty budowlane nie zostały rozpoczęte. Projekt nie wymaga uzyskania pozwolenia na budowę. Wnioskodawca dokonał zgłoszenia robót budowlanych. Projekt stanowi samodzielną jednostkę analizy i obejmuje wszystkie zadania inwestycyjne niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po zakończeniu realizacji zakresu rzeczowego.Projekt obejmuje: Zadanie nr 1: Zwiększenie efektywności energetycznej budynku Zespołu Szkół Publicznych w Chełmsku Śląskim, tj. 1.1 Działanie nr 1 - Dokumentacja projektowo-kosztorysowa; 1.2. Działanie nr 2 - Studium wykonalności; 1.3. Działanie nr 3 - Roboty ogólnobudowlane (modernizacja przegrody - stropodach wentylowany, ściana na gruncie, ściana zewnętrzna, stropodach sali gimnastycznej, OZ LUK „Wentylacja grawitacyjna”, OZ 2 „Wentylacja grawitacyjna”, DZ 2 „Wentylacja grawitacyjna”, modernizacja instalacji ciepłej wody użytkowej, modernizacja instalacji c.o., modernizacja źródła ciepła – montaż dwóch kotłów na biomasę); 1.4. Działanie nr 4 – nadzór inwestorski, 1.5. Działanie nr 5 – nadzór autorski oraz Zadanie nr 2 Działania promocyjne, Działanie nr 1. Promocja projektu – tablica informacyjna; Działanie nr 2. Promocja projektu – tablica pamiątkowa, jak również bezkosztowe formy promocji. Wnioskodawcą, Inwestorem, Beneficjentem i Operatorem inwestycji będzie Gmina Lubawka. Projekt nie będzie realizowany w partnerstwie, w imieniu Wnioskodawcy nie będą występować inne podmioty. Projekt nie jest projektem dużym, nie generuje dochodu i nie jest objęty pomocą publiczną. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the building of the Silesian Weaver School Complex in Chełmsko Śląski (ul. Cologne 14. So far, energy audits, technical documentation and feasibility studies have been developed. Construction work has not been started. The project does not require a construction permit. The applicant has submitted construction works. The project is a stand-alone unit of analysis and covers all the investment tasks necessary to ensure the functionality and interoperability of the infrastructure immediately after completion of the material scope.The project includes: Task 1: Increase the energy efficiency of the building of the Public Schools Complex in Chełmsko Śląski, i.e. 1.1 Measure 1 – Project and cost documentation; IT’S 1.2. Action No 2 – Feasibility study; IT’S 1.3. Action No. 3 – General construction works (modernisation of partitions – ventilated stropods, wall on ground, outer wall, stropodach gymnasium, OZ LUK “Gravitational ventilation”, OZ 2 “Gravitational ventilation”, DZ 2 “Gravitational ventilation”, modernisation of hot water installations, modernisation of central heating system, modernisation of heat source – installation of two boilers; IT’S 1.4. Action No 4 – investor supervision, 1.5. Action No. 5 – Author supervision and Task No. 2 Promotional measures, Action No. 1. Promotion of the project – information board; Action 2. Project promotion – commemorative plaque as well as cost-free forms of promotion. The applicant, Investor, Beneficiary and Investment Operator will be Lubawka Municipality. The project will not be implemented in partnership, there will be no other actors on behalf of the Applicant. The project is not a large project, it generates no income and is not covered by public aid. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.03.04-02-0003/16
    0 references