Thermal modernisation of buildings, district heating and local boiler rooms (Q95643): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), the modernisation of the heating and cooling networks and the modernisation of the local boiler room (11) of the DPS JUNIOR DPS in Milków with the use of RES (biomass and solar energy). Scope of work: Building No 1 on the installation of new biomass boilers for heating. — Construction of a biomass-fired boiler (as a substitute for wood coamings/pellets) w...) |
(Created claim: summary (P836): The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of th...) |
||||||||||||||
Property / summary | |||||||||||||||
The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of the ceiling of the last floor warming of the outer walls of the building B in warming of the ceiling door warming up the outer walls of the building A and the connector Building No. 3 installation of the power-saving armature in the installation of the interior of the building. — Refurbishment of the oil boiler room with biomass (interchangeable chips/pellets) with a power of 400 kW. Repair and renovation works of the boiler room for biomass technology. Conversion of oil boiler room technology into solid fuel. Installation of fuel feed and fuel feed control systems. Chimney cables with the required diameter. Boiler room automation and electrical installation. — Photovoltaic installation with a power min. 10.2 kWp, with an energy storage system of 4.5 kWh, mounted on a boiler room building or next to a boiler room, automation, electrical installation, mounting structure, lightning installation. — Installation of solar collectors with an active area of 52.56 m², supporting the production of hot water for buildings, buffer tanks of central and central heating, fittings, automation, freestanding construction. Educational actions of target users (English) | |||||||||||||||
Property / summary: The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of the ceiling of the last floor warming of the outer walls of the building B in warming of the ceiling door warming up the outer walls of the building A and the connector Building No. 3 installation of the power-saving armature in the installation of the interior of the building. — Refurbishment of the oil boiler room with biomass (interchangeable chips/pellets) with a power of 400 kW. Repair and renovation works of the boiler room for biomass technology. Conversion of oil boiler room technology into solid fuel. Installation of fuel feed and fuel feed control systems. Chimney cables with the required diameter. Boiler room automation and electrical installation. — Photovoltaic installation with a power min. 10.2 kWp, with an energy storage system of 4.5 kWh, mounted on a boiler room building or next to a boiler room, automation, electrical installation, mounting structure, lightning installation. — Installation of solar collectors with an active area of 52.56 m², supporting the production of hot water for buildings, buffer tanks of central and central heating, fittings, automation, freestanding construction. Educational actions of target users (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of the ceiling of the last floor warming of the outer walls of the building B in warming of the ceiling door warming up the outer walls of the building A and the connector Building No. 3 installation of the power-saving armature in the installation of the interior of the building. — Refurbishment of the oil boiler room with biomass (interchangeable chips/pellets) with a power of 400 kW. Repair and renovation works of the boiler room for biomass technology. Conversion of oil boiler room technology into solid fuel. Installation of fuel feed and fuel feed control systems. Chimney cables with the required diameter. Boiler room automation and electrical installation. — Photovoltaic installation with a power min. 10.2 kWp, with an energy storage system of 4.5 kWh, mounted on a boiler room building or next to a boiler room, automation, electrical installation, mounting structure, lightning installation. — Installation of solar collectors with an active area of 52.56 m², supporting the production of hot water for buildings, buffer tanks of central and central heating, fittings, automation, freestanding construction. Educational actions of target users (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:32, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of buildings, district heating and local boiler rooms |
Project in Poland financed by DG Regio |
Statements
2,854,759.36 zloty
0 references
3,358,540.43 zloty
0 references
85.0 percent
0 references
18 December 2015
0 references
30 September 2019
0 references
POWIAT JELENIOGÓRSKI
0 references
Projekt obejmuje kompleksową termomodernizację 3 budynków (nr 1, 3, 6/7), modernizację sieci cieplnej c.o. i c.w.u. oraz modernizację lokalnej kotłowni (budynek nr 11) DPS JUNIOR w Miłkowie z zastosowaniem OZE (biomasa i energia słoneczna). Zakres prac: Budynek nr 1 montaż nowych kotłów na biomasę na c.o. i c.w.u. montaż armatury energooszczędnej na potrzeby c.w.u. ocieplenie stropu ostatniej kondygnacji ocieplenie ścian zewnętrznych budynku B ocieplenie stropodachu docieplenie ścian zewnętrznych budynku A i łącznika Budynek nr 3 montaż armatury energooszczędnej w instalacji c.w.u. ocieplenie dachu budynku ocieplenie ścian zewnętrznych murowanych i drewnianych ocieplenie tarasów wymiana starej drewnianej stolarki okiennej i drzwiowej Budynek nr 6/7 montaż armatury energooszczędnej w instalacji c.w.u. ocieplenie dachu budynku ocieplenie ścian zewnętrznych wymiana stolarki okiennej i drzwiowej Sieć cieplna c.o. i c.w.u. Kompleksowa modernizacja sieci c.o. oraz c.w.u., wraz z wymianą armatury Odłączenie budynku nr 17 od sieci ciepłej wody użytkowej Lokalna kotłownia: - Przebudowa kotłowni olejowej na opalaną biomasą (zamiennie zrębki/pellet) o mocy 400 kW. Roboty remontowe i renowacyjne pomieszczeń kotłowni pod zabudowę technologii na biomasę. Przebudowa technologii kotłowni olejowej na paliwo stałe. Montaż systemów podawania paliwa i sterowania podawaniem paliwa. Przewody kominowe o wymaganej średnicy. Automatyka kotłowni i instalacja elektryczna. - Instalacja fotowoltaiczna o mocy min. 10,2 kWp, z układem magazynowania energii o mocy 4,5 kWh, zamontowane na budynku kotłowni lub obok kotłowni, automatyka, instalacja elektryczna, konstrukcja mocująca, instalacja odgromowa. - Instalacja kolektorów słonecznych o powierzchni czynnej 52,56 m2, wspomagających wytwarzanie ciepłej wody użytkowej dla budynków, zbiorniki buforowe c.o. i c.w.u., armatura, automatyka, konstrukcja wolnostojąca. Działania edukacyjne użytkowników docelowych (Polish)
0 references
The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of the ceiling of the last floor warming of the outer walls of the building B in warming of the ceiling door warming up the outer walls of the building A and the connector Building No. 3 installation of the power-saving armature in the installation of the interior of the building. — Refurbishment of the oil boiler room with biomass (interchangeable chips/pellets) with a power of 400 kW. Repair and renovation works of the boiler room for biomass technology. Conversion of oil boiler room technology into solid fuel. Installation of fuel feed and fuel feed control systems. Chimney cables with the required diameter. Boiler room automation and electrical installation. — Photovoltaic installation with a power min. 10.2 kWp, with an energy storage system of 4.5 kWh, mounted on a boiler room building or next to a boiler room, automation, electrical installation, mounting structure, lightning installation. — Installation of solar collectors with an active area of 52.56 m², supporting the production of hot water for buildings, buffer tanks of central and central heating, fittings, automation, freestanding construction. Educational actions of target users (English)
15 October 2020
0 references
Identifiers
RPDS.03.03.03-02-0004/16
0 references