Improvement of air quality in the OSI area — Kudowa-Zdrój — Comprehensive thermal renovation of public buildings — stage III (Q95549): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of a comprehensive thermal renovation of the 4 buildings in Kudwi-Zdrój on the basis of energy audits for each building. This III is already a step in the improvement of air quality in a spa by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII — [LO] ul. Zrojowa 22a, op. no 190. 7 Zakra AM5. 1 475.7 m² Scope: energy efficiency; thermal modernisation; b...) |
(Created claim: summary (P836): The project consists of a comprehensive thermal modernisation of 4 buildings in Kudow-Zdrój carried out on the basis of energy audits developed for each building. This is the third stage of improving air quality in the spa, implemented by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII Public Schools Team – [LO]ul. Zdrojowa 22a, No. 190 7 Kneater AM5, pow. 1475,7 m² Scope:...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of a comprehensive thermal modernisation of 4 buildings in Kudow-Zdrój carried out on the basis of energy audits developed for each building. This is the third stage of improving air quality in the spa, implemented by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII Public Schools Team – [LO]ul. Zdrojowa 22a, No. 190 7 Kneater AM5, pow. 1475,7 m² Scope: energy audit; thermo-modernisation; construction works [RB] – installations: modernisation of central heating and hot water installations; [RB] – warming: outer walls and ceilings; [RB] – carpentry: replacement of leaky window joinery John Paul II Public Schools Team – [SP1] ul. Mariana Buczka 9, Dz. nr 168/1 8 Elephant AM9, pow. 1041,0 m² Scope: energy audit; thermomodernisation;[RB] – warming: outside walls, ceilings and roofs Public Primary School No. 3 – [SP3] ul. T. Kościuszki 58, Dz. nr 280 ob. 4 June AM9, pow. 1041,8 m² Scope: energy audit; thermal upgrade;[RB] – installations: modernisation of the heating system; [RB] – warming: exterior walls, ceilings and roofs; [RB] – carpentry: replacement of external doors and windows Building of the City Hall – [UM]ul. Zdrojowa 24, Dz. nr. 189/10 7 Kneater AM5, pow. 1223,5 m². Scope: energy audit, thermo-modernisation; [RB] – installations: modernisation of the central heating system with the exchange of condensation gas boiler; [RB] – warming: strophode/attic floor; [RB] – carpentry: replacement of window carpentry The total area covered by the project is 4782.0 m² The project provides for the execution of documentation necessary for its implementation (feasibility study) and activities related to promotion. The investment will reduce the energy demand of these buildings, reduce CO2 emissions and reduce low PM10 and PM25 emissions. The applicant, investor and implementing entity is the Municipality of Kudowa-Zdrój, which has an experienced team of employees. (English) | |||||||||||||||
Property / summary: The project consists of a comprehensive thermal modernisation of 4 buildings in Kudow-Zdrój carried out on the basis of energy audits developed for each building. This is the third stage of improving air quality in the spa, implemented by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII Public Schools Team – [LO]ul. Zdrojowa 22a, No. 190 7 Kneater AM5, pow. 1475,7 m² Scope: energy audit; thermo-modernisation; construction works [RB] – installations: modernisation of central heating and hot water installations; [RB] – warming: outer walls and ceilings; [RB] – carpentry: replacement of leaky window joinery John Paul II Public Schools Team – [SP1] ul. Mariana Buczka 9, Dz. nr 168/1 8 Elephant AM9, pow. 1041,0 m² Scope: energy audit; thermomodernisation;[RB] – warming: outside walls, ceilings and roofs Public Primary School No. 3 – [SP3] ul. T. Kościuszki 58, Dz. nr 280 ob. 4 June AM9, pow. 1041,8 m² Scope: energy audit; thermal upgrade;[RB] – installations: modernisation of the heating system; [RB] – warming: exterior walls, ceilings and roofs; [RB] – carpentry: replacement of external doors and windows Building of the City Hall – [UM]ul. Zdrojowa 24, Dz. nr. 189/10 7 Kneater AM5, pow. 1223,5 m². Scope: energy audit, thermo-modernisation; [RB] – installations: modernisation of the central heating system with the exchange of condensation gas boiler; [RB] – warming: strophode/attic floor; [RB] – carpentry: replacement of window carpentry The total area covered by the project is 4782.0 m² The project provides for the execution of documentation necessary for its implementation (feasibility study) and activities related to promotion. The investment will reduce the energy demand of these buildings, reduce CO2 emissions and reduce low PM10 and PM25 emissions. The applicant, investor and implementing entity is the Municipality of Kudowa-Zdrój, which has an experienced team of employees. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of a comprehensive thermal modernisation of 4 buildings in Kudow-Zdrój carried out on the basis of energy audits developed for each building. This is the third stage of improving air quality in the spa, implemented by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII Public Schools Team – [LO]ul. Zdrojowa 22a, No. 190 7 Kneater AM5, pow. 1475,7 m² Scope: energy audit; thermo-modernisation; construction works [RB] – installations: modernisation of central heating and hot water installations; [RB] – warming: outer walls and ceilings; [RB] – carpentry: replacement of leaky window joinery John Paul II Public Schools Team – [SP1] ul. Mariana Buczka 9, Dz. nr 168/1 8 Elephant AM9, pow. 1041,0 m² Scope: energy audit; thermomodernisation;[RB] – warming: outside walls, ceilings and roofs Public Primary School No. 3 – [SP3] ul. T. Kościuszki 58, Dz. nr 280 ob. 4 June AM9, pow. 1041,8 m² Scope: energy audit; thermal upgrade;[RB] – installations: modernisation of the heating system; [RB] – warming: exterior walls, ceilings and roofs; [RB] – carpentry: replacement of external doors and windows Building of the City Hall – [UM]ul. Zdrojowa 24, Dz. nr. 189/10 7 Kneater AM5, pow. 1223,5 m². Scope: energy audit, thermo-modernisation; [RB] – installations: modernisation of the central heating system with the exchange of condensation gas boiler; [RB] – warming: strophode/attic floor; [RB] – carpentry: replacement of window carpentry The total area covered by the project is 4782.0 m² The project provides for the execution of documentation necessary for its implementation (feasibility study) and activities related to promotion. The investment will reduce the energy demand of these buildings, reduce CO2 emissions and reduce low PM10 and PM25 emissions. The applicant, investor and implementing entity is the Municipality of Kudowa-Zdrój, which has an experienced team of employees. (English) / qualifier | |||||||||||||||
point in time: 15 October 2020
|
Revision as of 22:15, 15 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of air quality in the OSI area — Kudowa-Zdrój — Comprehensive thermal renovation of public buildings — stage III |
Project in Poland financed by DG Regio |
Statements
2,048,048.53 zloty
0 references
2,409,468.86 zloty
0 references
85.0 percent
0 references
7 July 2016
0 references
26 July 2019
0 references
GMINA KUDOWA-ZDRÓJ
0 references
Projekt polega na kompleksowej termomodernizacji 4 budynków w Kudowie-Zdroju realizowanej na podstawie audytów energetycznych opracowanych dla każdego budynku. Jest to III już etap poprawy jakości powietrza w uzdrowisku realizowany przez gminę Kudowa-Zdrój. Projekt stanowi kontynuację przedsięwzięć z poprzedniej perspektywy finansowej: Zespół Szkół Publicznych im. JPII - [LO]ul. Zdrojowa 22a, dz. nr 190 ob. 7 Zakrze AM5, pow. 1 475,7 m2 Zakres: audyt energ.; termomodernizacja; roboty budowlane [RB] - instalacje: modernizacja instalacji c.o. i c.w.u.; [RB] - docieplenie: ścian zewnętrznych i stropodachu; [RB] - stolarka:; wymiana nieszczelnej stolarki okiennej Zespół Szkół Publicznych im. Jana Pawła II - [SP1] ul. Mariana Buczka 9, dz. nr 168/1 ob. 8 Słone AM9, pow. 1 041,0 m2 Zakres: audyt energ.; termomodernizacja;[RB] - docieplenie: ścian zewnętrznych, stropodachu i dachu Publiczna Szkoła Podstawowa nr 3 - [SP3] ul. T. Kościuszki 58, dz. nr 280 ob. 4 Czermna AM9, pow. 1 041,8 m2 Zakres: audyt energ.; termomodernizacja;[RB] - instalacje: modernizacja instalacji grzewczej; [RB] - docieplenie: ścian zewnętrznych, stropodachu i dachu; [RB] - stolarka: wymiana drzwi zewnętrznych i okien Budynek Urzędu Miasta - [UM]ul. Zdrojowa 24, dz. nr 189/10 ob. 7 Zakrze AM5, pow. 1 223,5 m2. Zakres: audyt energ., termomodernizacja; [RB] - instalacje: modernizacja instalacji c.o. wraz z wymianą kondensacyjnego kotła gazowego; [RB] - docieplenie: stropodachu/podłogi strychu; [RB] - stolarka: wymiana stolarki okiennej Łączna pow. uż. objęta projektem wynosi 4 782,0 m2 Projekt przewiduje wykonanie dokumentacji niezbędnej do jego realizacji (studium wykonalności) i działania związane z promocją. Dzięki inwestycji nastąpi zmniejszenie zapotrzebowania ww. budynków na energię, zmniejszenie emisji CO2 oraz ograniczenie niskiej emisji PM10 i PM25. Wnioskodawcą, inwestorem oraz podmiotem realizującym jest Gmina Kudowa-Zdrój, dysponująca doświadczonym zespołem pracowników. (Polish)
0 references
The project consists of a comprehensive thermal modernisation of 4 buildings in Kudow-Zdrój carried out on the basis of energy audits developed for each building. This is the third stage of improving air quality in the spa, implemented by the municipality of Kudowa-Zdrój. The project is a continuation of projects from the previous financial perspective: JPII Public Schools Team – [LO]ul. Zdrojowa 22a, No. 190 7 Kneater AM5, pow. 1475,7 m² Scope: energy audit; thermo-modernisation; construction works [RB] – installations: modernisation of central heating and hot water installations; [RB] – warming: outer walls and ceilings; [RB] – carpentry: replacement of leaky window joinery John Paul II Public Schools Team – [SP1] ul. Mariana Buczka 9, Dz. nr 168/1 8 Elephant AM9, pow. 1041,0 m² Scope: energy audit; thermomodernisation;[RB] – warming: outside walls, ceilings and roofs Public Primary School No. 3 – [SP3] ul. T. Kościuszki 58, Dz. nr 280 ob. 4 June AM9, pow. 1041,8 m² Scope: energy audit; thermal upgrade;[RB] – installations: modernisation of the heating system; [RB] – warming: exterior walls, ceilings and roofs; [RB] – carpentry: replacement of external doors and windows Building of the City Hall – [UM]ul. Zdrojowa 24, Dz. nr. 189/10 7 Kneater AM5, pow. 1223,5 m². Scope: energy audit, thermo-modernisation; [RB] – installations: modernisation of the central heating system with the exchange of condensation gas boiler; [RB] – warming: strophode/attic floor; [RB] – carpentry: replacement of window carpentry The total area covered by the project is 4782.0 m² The project provides for the execution of documentation necessary for its implementation (feasibility study) and activities related to promotion. The investment will reduce the energy demand of these buildings, reduce CO2 emissions and reduce low PM10 and PM25 emissions. The applicant, investor and implementing entity is the Municipality of Kudowa-Zdrój, which has an experienced team of employees. (English)
15 October 2020
0 references
Identifiers
RPDS.03.03.01-02-0083/16
0 references