Thermal modernisation of the multifunctional sports hall building at Konieczna Ząbkowicki Street at ul. Castle 4a (Q95505): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The project’s project is the comprehensive energy renovation of a public utility, which has a regional relevance because of the sporting competitions involved. The project will be implemented at ul. Ząbkowicka 26, in Kamieu Ząbkowicki. The main problem is the poor energy efficiency of a building resulting from the high thermal permeability of walls, doors and window frames. The material scope of the project is: 1.Energy audit, 2.Design and cos...)
Property / summary
The project’s project is the comprehensive energy renovation of a public utility, which has a regional relevance because of the sporting competitions involved. The project will be implemented at ul. Ząbkowicka 26, in Kamieu Ząbkowicki. The main problem is the poor energy efficiency of a building resulting from the high thermal permeability of walls, doors and window frames. The material scope of the project is: 1.Energy audit, 2.Design and cost estimates, 3.Feasibility study with application for funding, 4.Construction works, 6.Design promotion. The project has not yet started. The planned date for the implementation of the project is 07.2015-12.2018. The applicant is prepared to implement the project, has the necessary technical documentation (energy audit), a financial statement and a building permit. The project recipients of the project will be the residents of the nearby Basic School, the municipality of Kazankowicki and the Dolnoslaskie region. The project deliverables of the project will result in the achievement of the following indicators: 1. Product — Number of modernised buildings — 1 buildings — usable area of buildings undergoing thermal modernisation (1 797.33 m²) -Number of units generating heat generation from OE-1. — Number of modernised sources of float — 1. 2. Result: — The amount of saved heating energy — 909,68 GJ/year -Szazane annual drop in greenhouse gas emissions — 59,07 tonnes of greenhouse gas emissions — tonnes of greenhouse gas emissions — CO2/rok of the proposal and the investor will be invested in the municipality of Kazankowicki, which will implement the project by its administrative apparatus — the local authority. The Office has experienced experts in the field of EU fundraising, infrastructure investments, financial settlement and promotion. (English)
 
Property / summary: The project’s project is the comprehensive energy renovation of a public utility, which has a regional relevance because of the sporting competitions involved. The project will be implemented at ul. Ząbkowicka 26, in Kamieu Ząbkowicki. The main problem is the poor energy efficiency of a building resulting from the high thermal permeability of walls, doors and window frames. The material scope of the project is: 1.Energy audit, 2.Design and cost estimates, 3.Feasibility study with application for funding, 4.Construction works, 6.Design promotion. The project has not yet started. The planned date for the implementation of the project is 07.2015-12.2018. The applicant is prepared to implement the project, has the necessary technical documentation (energy audit), a financial statement and a building permit. The project recipients of the project will be the residents of the nearby Basic School, the municipality of Kazankowicki and the Dolnoslaskie region. The project deliverables of the project will result in the achievement of the following indicators: 1. Product — Number of modernised buildings — 1 buildings — usable area of buildings undergoing thermal modernisation (1 797.33 m²) -Number of units generating heat generation from OE-1. — Number of modernised sources of float — 1. 2. Result: — The amount of saved heating energy — 909,68 GJ/year -Szazane annual drop in greenhouse gas emissions — 59,07 tonnes of greenhouse gas emissions — tonnes of greenhouse gas emissions — CO2/rok of the proposal and the investor will be invested in the municipality of Kazankowicki, which will implement the project by its administrative apparatus — the local authority. The Office has experienced experts in the field of EU fundraising, infrastructure investments, financial settlement and promotion. (English) / rank
Normal rank
 

Revision as of 22:14, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the multifunctional sports hall building at Konieczna Ząbkowicki Street at ul. Castle 4a
Project in Poland financed by DG Regio

    Statements

    0 references
    1,158,245.25 zloty
    0 references
    277,978.86 Euro
    13 January 2020
    0 references
    1,362,641.48 zloty
    0 references
    327,033.96 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 July 2015
    0 references
    31 August 2019
    0 references
    GMINA KAMIENIEC ZĄBKOWICKI
    0 references
    PRZEDMIOT PROJEKTU Przedmiotem projektu jest kompleksowa modernizacja energetyczna budynku użyteczności publicznej – Hali sportowej, która ma znaczenie regionalne z uwagi na rozgrywające się w niej zawody sportowe. Projekt będzie realizowany przy ul. Ząbkowickiej 26, w Kamieńcu Ząbkowickim. Głównym problemem jest niska efektywność energetyczna budynku wynikająca z wysokiej przepuszczalności cieplnej ścian, stolarki drzwiowej i okiennej. ZAKRES RZECZOWY Do zakresu rzeczowego projektu należą: 1.Audyt energetyczny, 2.Dokumentacja projektowa i kosztorysowa, 3.Studium wykonalności wraz z wnioskiem o dofinansowanie, 4.Roboty budowlane, 6.Promocja projektu. Projekt nie został jeszcze rozpoczęty. Planowany termin realizacji projektu to 07.2015-12.2018. Wnioskodawca jest przygotowany do realizacji projektu, posiada niezbędną dokumentację techniczną (audyt energetyczny), kosztorys, oraz pozwolenie na budowę. ODBIORCY PROJEKTU Odbiorcami projektu będą mieszkańcy pobliskiej Szkoły Podstawowej, Gminy Kamieniec Ząbkowicki i województwa dolnośląskiego. EFEKTY PROJEKTU Efektem projektu będzie osiągnięcie następujących wskaźników: 1. Produktu: -Liczba zmodernizowanych energetycznie budynków–1 szt. -Powierzchnia użytkowa budynków poddanych termomodernizacji–1797,33 m2 -Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE–1 szt. -Liczba zmodernizowanych źródeł ciepła–1 szt. 2. Rezultatu: -Ilość zaoszczędzonej energii cieplnej-909,68 GJ/rok -Szacowany roczny spadek emisji gazów cieplarnianych–59,07 tony równoważnika CO2/rok SPOSÓB REALIZACJI PROJEKTU Wnioskodawcą i inwestorem będzie Gmina Kamieniec Ząbkowicki, która będzie realizować projekt przy pomocy swojego aparatu administracyjnego – Urzędu Gminy. Urząd dysponuje doświadczonymi specjalistami w dziedzinie pozyskiwania środków unijnych, realizacji inwestycji infrastrukturalnych, rozliczania finansowego i promocji. (Polish)
    0 references

    Identifiers

    RPDS.03.03.01-02-0026/17
    0 references