(Removed claim: summary (P836): The project provides for the construction of a sewerage network in Krzyzeszkowo, Roughy, Napachan, os.Calm in the Rokietnica and a change in the pumping system from the part of the agglomeration to the treatment plant in Bytkowie, i.e. the construction of the derailed pumping station located in the Mobrowno with the compressor pipeline.The wastewater built as part of the project will go to the wastewater treatment plant in Bytkov.The reconstru...) |
(Created claim: summary (P836): The project provides for the construction of sanitary sewage system in the towns of Krzyszkowo, Rostworowo, Napachanie, wasps. Quiet in Rokietnica and a change of the system pumped sewage from part of the agglomeration to the treatment plant in Bytków, i.e. construction of a transport pumping plant located in Mrowina with a press pipeline. The sewage system built as part of the project will be sent to the sewage treatment plant in Bytkowo. A rec...) |
||||||||||||||
Property / summary | |||||||||||||||
The project provides for the construction of sanitary sewage system in the towns of Krzyszkowo, Rostworowo, Napachanie, wasps. Quiet in Rokietnica and a change of the system pumped sewage from part of the agglomeration to the treatment plant in Bytków, i.e. construction of a transport pumping plant located in Mrowina with a press pipeline. The sewage system built as part of the project will be sent to the sewage treatment plant in Bytkowo. A reconstruction of the water pumping station was planned on the street. The school in Rokietnica to a water treatment station, which will allow to increase the production of water by approx. 35 m³/h and its storage by 300 m³. The project will also include a section of the water supply network with a length of 320.25 mb per wasp. Quiet in Rokietnica. Construction of a sewer system – the scope of the project provides for construction of approx. 21.29 km of sewage network (gravity, press and vacuum), approx. 2,7 km of connections, 5 pumping stations will consist of the following tasks: 1) Network of sanitary sewerage along with pointing out in the town of Krzyszkowo, gm. Rokietnica. 2) Sewerage network, along with pointing out in the town of Napachanie, building Rokietnica – delivery of equipment for pressure cleaning of sanitary sewage system on the road chassis – durable medium necessary for the proper functioning of the vacuum network (cleaning, penetration of wells and pipelines). 3) Modernisation of the sewage transport system – construction of the sewage manifold Zmysłowo – Bytkowo, gm. Rokietnica – the task is to build a new collector for the transfer of sewage from the Mrowino basin to the treatment plant Bytkowo. The task provides for the delivery of a transportable power generator 4) Sewerage network to a person. Quiet in the village of Rokietnica. 1095 Mk will be connected to the newly built sanitary system, to the built water supply network – 10 Mk will be connected. (English) | |||||||||||||||
Property / summary: The project provides for the construction of sanitary sewage system in the towns of Krzyszkowo, Rostworowo, Napachanie, wasps. Quiet in Rokietnica and a change of the system pumped sewage from part of the agglomeration to the treatment plant in Bytków, i.e. construction of a transport pumping plant located in Mrowina with a press pipeline. The sewage system built as part of the project will be sent to the sewage treatment plant in Bytkowo. A reconstruction of the water pumping station was planned on the street. The school in Rokietnica to a water treatment station, which will allow to increase the production of water by approx. 35 m³/h and its storage by 300 m³. The project will also include a section of the water supply network with a length of 320.25 mb per wasp. Quiet in Rokietnica. Construction of a sewer system – the scope of the project provides for construction of approx. 21.29 km of sewage network (gravity, press and vacuum), approx. 2,7 km of connections, 5 pumping stations will consist of the following tasks: 1) Network of sanitary sewerage along with pointing out in the town of Krzyszkowo, gm. Rokietnica. 2) Sewerage network, along with pointing out in the town of Napachanie, building Rokietnica – delivery of equipment for pressure cleaning of sanitary sewage system on the road chassis – durable medium necessary for the proper functioning of the vacuum network (cleaning, penetration of wells and pipelines). 3) Modernisation of the sewage transport system – construction of the sewage manifold Zmysłowo – Bytkowo, gm. Rokietnica – the task is to build a new collector for the transfer of sewage from the Mrowino basin to the treatment plant Bytkowo. The task provides for the delivery of a transportable power generator 4) Sewerage network to a person. Quiet in the village of Rokietnica. 1095 Mk will be connected to the newly built sanitary system, to the built water supply network – 10 Mk will be connected. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project provides for the construction of sanitary sewage system in the towns of Krzyszkowo, Rostworowo, Napachanie, wasps. Quiet in Rokietnica and a change of the system pumped sewage from part of the agglomeration to the treatment plant in Bytków, i.e. construction of a transport pumping plant located in Mrowina with a press pipeline. The sewage system built as part of the project will be sent to the sewage treatment plant in Bytkowo. A reconstruction of the water pumping station was planned on the street. The school in Rokietnica to a water treatment station, which will allow to increase the production of water by approx. 35 m³/h and its storage by 300 m³. The project will also include a section of the water supply network with a length of 320.25 mb per wasp. Quiet in Rokietnica. Construction of a sewer system – the scope of the project provides for construction of approx. 21.29 km of sewage network (gravity, press and vacuum), approx. 2,7 km of connections, 5 pumping stations will consist of the following tasks: 1) Network of sanitary sewerage along with pointing out in the town of Krzyszkowo, gm. Rokietnica. 2) Sewerage network, along with pointing out in the town of Napachanie, building Rokietnica – delivery of equipment for pressure cleaning of sanitary sewage system on the road chassis – durable medium necessary for the proper functioning of the vacuum network (cleaning, penetration of wells and pipelines). 3) Modernisation of the sewage transport system – construction of the sewage manifold Zmysłowo – Bytkowo, gm. Rokietnica – the task is to build a new collector for the transfer of sewage from the Mrowino basin to the treatment plant Bytkowo. The task provides for the delivery of a transportable power generator 4) Sewerage network to a person. Quiet in the village of Rokietnica. 1095 Mk will be connected to the newly built sanitary system, to the built water supply network – 10 Mk will be connected. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 15:35, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Water and wastewater management in the agglomeration of Rokietnica |
Project in Poland financed by DG Regio |
Statements
7,058,843.13 zloty
0 references
8,304,521.34 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
30 June 2019
0 references
PRZEDSIĘBIORSTWO USŁUG KOMUNALNYCH SP. Z O.O.
0 references
Projekt przewiduje wybudowanie sieci kanalizacji sanitarnej w miejscowości Krzyszkowo, Rostworowo, Napachanie, os. Spokojne w Rokietnicy oraz zmianę sytemu przepompowani ścieków z części aglomeracji do oczyszczalni w Bytkowie tzn. wybudowanie przerzutowej pompowni zlokalizowanej w Mrowinie wraz z rurociągiem tłocznym. Ścieki wybudowaną w ramach projektu siecią kanalizacji sanitarnej będą trafiać do oczyszczalni ścieków w Bytkowie. Zaplanowano przebudowę przepompowni wodociągowej przy ul. Szkolnej w Rokietnicy na stację uzdatniania wody, co umożliwi zwiększenie produkcji wody o ok. 35 m3/h oraz jej magazynowanie o 300 m3. W ramach projektu zostanie również wykonany odcinek sieci wodociągowej o długości 320,25 mb na os. Spokojnym w Rokietnicy. Budowa systemu kanalizacji - zakres ściekowy przedsięwzięcia przewiduje budowę ok. 21,29 km sieci kanalizacyjnej (grawitacyjnej, tłocznej i podciśnieniowej), ok. 2,7 km przyłączy, 5 przepompowni składać się będzie z następujących zadań: 1) Sieć kanalizacji sanitarnej wraz z wytykami w miejscowości Krzyszkowo, gm. Rokietnica. 2) Sieć kanalizacji sanitarnej wraz z wytykami w miejscowości Napachanie, gm. Rokietnica - przewidziana jest również dostawa urządzenia do ciśnieniowego czyszczenia sieci kanalizacji sanitarnej na podwoziu jezdnym – środek trwały niezbędny dla prawidłowego funkcjonowania sieci podciśnieniowej (czyszczenie, przetykanie studni zaworowych oraz rurociągów). 3) Modernizacja systemu transportu ścieków - budowa kolektora tłocznego ścieków Zmysłowo - Bytkowo, gm. Rokietnica – zadanie ma na celu budowę nowego kolektora przerzutu ścieków ze Zlewni Mrowino na oczyszczalnię Bytkowo. Zadanie przewiduje dostawę przewoźnego agregatu prądotwórczego 4)Sieć kanalizacji sanitarnej na os. Spokojnym w miejscowości Rokietnica. Do nowo wybudowanej sieci kanalizacji sanitarnej zostanie podłączonych 1095 Mk, do wybudowanej sieci wodociągowej - podłączonych zostanie 10 Mk. (Polish)
0 references
The project provides for the construction of sanitary sewage system in the towns of Krzyszkowo, Rostworowo, Napachanie, wasps. Quiet in Rokietnica and a change of the system pumped sewage from part of the agglomeration to the treatment plant in Bytków, i.e. construction of a transport pumping plant located in Mrowina with a press pipeline. The sewage system built as part of the project will be sent to the sewage treatment plant in Bytkowo. A reconstruction of the water pumping station was planned on the street. The school in Rokietnica to a water treatment station, which will allow to increase the production of water by approx. 35 m³/h and its storage by 300 m³. The project will also include a section of the water supply network with a length of 320.25 mb per wasp. Quiet in Rokietnica. Construction of a sewer system – the scope of the project provides for construction of approx. 21.29 km of sewage network (gravity, press and vacuum), approx. 2,7 km of connections, 5 pumping stations will consist of the following tasks: 1) Network of sanitary sewerage along with pointing out in the town of Krzyszkowo, gm. Rokietnica. 2) Sewerage network, along with pointing out in the town of Napachanie, building Rokietnica – delivery of equipment for pressure cleaning of sanitary sewage system on the road chassis – durable medium necessary for the proper functioning of the vacuum network (cleaning, penetration of wells and pipelines). 3) Modernisation of the sewage transport system – construction of the sewage manifold Zmysłowo – Bytkowo, gm. Rokietnica – the task is to build a new collector for the transfer of sewage from the Mrowino basin to the treatment plant Bytkowo. The task provides for the delivery of a transportable power generator 4) Sewerage network to a person. Quiet in the village of Rokietnica. 1095 Mk will be connected to the newly built sanitary system, to the built water supply network – 10 Mk will be connected. (English)
14 October 2020
0 references
Identifiers
POIS.02.03.00-00-0098/16
0 references