Improving the safety at the intersection of railways with road — Stage II — a part of the viaduct (Q86008): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project involves the elimination of road level crossings with the construction of two tier crossings at 4 locations over the railway line No 2 Warszawa Zachodnia — Terespol, i.e.:• A category A level crossingAnd at km 9,587 at the intersection with the street.Mr Chełmżyńska w Warszawie,• A category A level crossingAnd at km 11,621 at the intersection with the street.Mars in Warsaw,• A category A level crossingB at km 16,274 on ul.Mr Władys...) |
||
Property / summary | |||
Property / summary: The project involves the elimination of road level crossings with the construction of two tier crossings at 4 locations over the railway line No 2 Warszawa Zachodnia — Terespol, i.e.:• A category A level crossingAnd at km 9,587 at the intersection with the street.Mr Chełmżyńska w Warszawie,• A category A level crossingAnd at km 11,621 at the intersection with the street.Mars in Warsaw,• A category A level crossingB at km 16,274 on ul.Mr Władysław Raszkiewicz in Warsaw,• A Cat level crossingB at km 19,376 on ul.Piłsudskiego w Sulejowu.In addition, the project includes the development of project documentation for the elimination of the category A level crossing.At km 21,049 on ul.Krasiński in Sulejówko, and the construction of a multi-level intersection.In particular:• A category A level crossingIn km 9,587, a viaduct will be replaced by a viaduct in the new axis, i.e. at km ~ 9,400;• A category A level crossingAnd in km 11,621 will be replaced by a road tunnel in the new axis, i.e. at km ~ 11,700;• A category A level crossingB in km 16,274 shall be replaced by the road tunnel on the existing axle;• A category A level crossingB in km 19,376 shall be replaced by the road tunnel on the existing axle.Design documentation for category A level level crossingAnd at km 21,049 it is intended to replace the road tunnel with the existing axle. (English) / rank | |||
Revision as of 15:13, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the safety at the intersection of railways with road — Stage II — a part of the viaduct |
Project in Poland financed by DG Regio |
Statements
56,662,391.87 zloty
0 references
66,661,637.5 zloty
0 references
85.0 percent
0 references
30 June 2017
0 references
31 October 2022
0 references
PKP POLSKIE LINIE KOLEJOWE S.A.
0 references
Q2515024 (Deleted Item)
0 references
Projekt obejmuje likwidację przejazdów kolejowo-drogowych wraz z budową skrzyżowań dwupoziomowych w 4 lokalizacjach w ciągu linii kolejowej nr 2 Warszawa Zachodnia – Terespol, tj.: • przejazd kolejowo-drogowy kat. A w km 9,587 na skrzyżowaniu z ul. Chełmżyńską w Warszawie, • przejazd kolejowo-drogowy kat. A w km 11,621 na skrzyżowaniu z ul. Marsa w Warszawie, • przejazd kolejowo-drogowy kat. B w km 16,274 w ciągu ul. Władysława Raczkiewicza w Warszawie, • przejazd kolejowo-drogowy kat. B w km 19,376 w ciągu z ul. Piłsudskiego w Sulejówku. Dodatkowo, projekt obejmuje opracowanie dokumentacji projektowej dla likwidacji przejazdu kolejowo-drogowego kat. A w km 21,049 w ciągu z ul. Krasińskiego w Sulejówku, wraz z budową skrzyżowania wielopoziomowego. W szczególności: • przejazd kolejowo-drogowy kat. A w km 9,587 zostanie zastąpiony wiaduktem drogowym w nowej osi tj. w km ~9,400; • przejazd kolejowo-drogowy kat. A w km 11,621 zostanie zastąpiony tunelem drogowym w nowej osi tj. w km ~11,700; • przejazd kolejowo-drogowy kat. B w km 16,274 zostanie zastąpiony tunelem drogowym w istniejącej osi; • przejazd kolejowo-drogowy kat. B w km 19,376 w zostanie zastąpiony tunelem drogowym w istniejącej osi. Dokumentacja projektowa dla przejazdu kolejowo-drogowego kat. A w km 21,049 zakłada jego zastąpienie tunelem drogowym w istniejącej osi. (Polish)
0 references
Identifiers
POIS.05.01.00-00-0037/18
0 references