Q85127 (Q85127): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project consists of the construction of a stationary Municipal Waste Collection Point (PSZOK).It will be carried out in the voivodeship of maz.,in m.Radom – south part, within a distance of approx.3 km from the center of the part of the city, at the centre of the part of the city, on the number of register no.:2/6,3/4,3/5,208/8,85/6,84,85/8, located at Wjazdowa Street(the map of the location of the investment-Zal). The scope of the project i...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Construction of the sorted municipal waste collection point (PSZOK) in the municipality of Radom

Revision as of 15:02, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    2,150,340.17 zloty
    0 references
    516,081.64 Euro
    13 January 2020
    0 references
    2,529,811.97 zloty
    0 references
    607,154.87 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    GMINA MIASTA RADOMIA
    0 references
    0 references
    0 references
    Projekt polega na budowie stacjonarnego Punktu Selektywnego Zbierania Odpadów Komunalnych(PSZOK).Realizowany będzie w woj.maz.,w m.Radom – płd. część,w odległości ok.3km od centr. części miasta,na dz. o nr ewid.:2/6,3/4,3/5,208/8,85/6,84,85/8,położonych przy ul.Wjazdowej(mapa lokalizacji inwestycji-zał.nr5 do WoD).Grunty są własnością Gminy Miasta Radomia(GMR). Zakres proj.obejmują zadania: 1.Prace przygot.(50700,00zł netto; 62361,00zł brutto): -studium wykonalności(SW),-wniosek o dof.(WoD), -program funkcjonalno-użytkowy(PFU)z koncepcją, 2.Dokumentacja proj.(95875,00zł netto; 117926,25zł brutto): -Projekty wraz z kompletem uzgodnień i pozwoleniem na budowę -DTR,Instrukcje Technologiczne,Instrukcje stanowiskowe,Dokumentacja i UDT,Instrukcje BPH i p.poż. -Dok. powykonawcza -Dok. do uzyskania pozwolenia na użytk. wraz z pozwoleniem 3.Roboty budowlane(2282730,00zł netto;2807757,90zł brutto): -Powierzchnia utwardzona pod pow. rampy wielofunk. -Przyłącze mediów-energia elektryczna -Przyłącze i rozprowadzenie mediów–wodociąg -Kanalizacja deszczowa -Ogrodzenie terenu -Brama wjazdowa -Sieci teletechniczne -Zagosp. terenu,roboty wykończeniowe i remontowe -Wjazd(zjazd)z drogi publicz. -Budynek biurowo-socjalny(kontener) -Kontenery i pojemniki PSZOK -Dostawa i wyposażenie ścieżki edukac. -Dostawa i montaż wagi samochodowej 18t -Dostawa i montaż wagi platformowej 300kg -Wyposażenie warsztatu 4.Nadzór budowlany(34240,95zł netto;41116,36zł brutto): -nadzór nad realizacją 5.Informacja i promocja(99966,02zł netto;119268,20zł brutto): -działania informac.-promoc. -tablica informac.i pamiątk. (Polish)
    0 references
    The project consists of the construction of a stationary Municipal Waste Collection Point (PSZOK).It will be carried out in the voivodeship of maz.,in m.Radom – south part, within a distance of approx.3 km from the center of the part of the city, at the centre of the part of the city, on the number of register no.:2/6,3/4,3/5,208/8,85/6,84,85/8, located at Wjazdowa Street(the map of the location of the investment-Zal). The scope of the project includes tasks: 1.Works prepared.(50700.00PLN net; 62361.00PLN gross: —feasibility study(SW),-application for DOF.(WoD), -functional-use programme(PFU) with concept, 2.Project documentation (PLN 95875.00 PLN net; 117926.25PLN gross: —Projects with a complete set of arrangements and building permit – DTR,Technological Instructions, Stand Instructions, Documentation and UDT,Instructions BPH and p. fire. —Construction doc. -Doc. to obtain a land permit. together with the permit 3.Construction works (PLN 2282730.00 PLN;2807757.90 PLN gross): —The surface hardened under the multifunk ramps. —Media connection-electricity -Connecting and dismantling of the media-water pipeline – Rainwater channelling – Terrain fence -Entry gate -Telecommunications networks – Land management, finishing and repair work -Entrance(exit)from the public road. — Office and social building (container) – Containers and containers PSZOK -Delivery and equipment of the educational path. —Delivery and assembly of car scale 18 t -Delivery and assembly of platform scale 300 kg – Workshop equipment 4.Construction supervision (PLN 34240.95 PLN net;41116.36 PLN gross): —supervision on implementation of 5.Information and promotion (PLN 99966.02 PLN;PLN 119268.20 gross): —activities informac.-promotion. —a table informac. and souvenirs. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.02.00-00-0012/17
    0 references