The protection of sea banks in the Heral Peninsula (Q85106): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wood...)
(‎Created claim: summary (P836): The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on w...)
Property / summary
 
The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English)
Property / summary: The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English) / rank
 
Normal rank
Property / summary: The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:02, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The protection of sea banks in the Heral Peninsula
Project in Poland financed by DG Regio

    Statements

    0 references
    63,750,000.0 zloty
    0 references
    15,300,000.0 Euro
    13 January 2020
    0 references
    75,000,000.0 zloty
    0 references
    18,000,000.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2017
    0 references
    30 April 2022
    0 references
    URZĄD MORSKI W GDYNI
    0 references
    0 references
    Zakres przedmiotowy projektu: Głównym elementem przedsięwzięcia jest odbudowa ostróg na odcinku od 0,3 km we Władysławowie do 12,3 km w Kuźnicy. Istniejące ostrogi (ok. 110 szt.) zostaną zlikwidowane. Pozostawione zostaną 4 ostrogi, które zostały wykonane w 2012 roku oraz 5 ostróg przy falochronie Portu Władysławowo.Planowane jest odtworzenie 135 ostróg. Przewidziany do odbudowy system ostróg zostanie wykonany z pali drewnianych.Sumarycznie odnowiony system będzie się składał z około 144 ostróg. Długość odcinka na którym realizowane będzie zadanie w stosunku do długości odcinka przeznaczonego do ochrony zgodnie z POBM wynosi 59%. Wskaźniki produktu: Liczba wybudowanych urządzeń dla celów ochrony przeciwpowodziowej - szt. 1 Wskaźniki rezultatu: Długość linii brzegowej, na której prowadzone są działania z zakresu ochrony brzegów morskich – 12 km. (Polish)
    0 references
    The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0026/17
    0 references