The protection of sea banks in the Heral Peninsula (Q85106): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wood...) |
(Created claim: summary (P836): The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on w...) |
||||||||||||||
Property / summary | |||||||||||||||
The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English) | |||||||||||||||
Property / summary: The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 15:02, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The protection of sea banks in the Heral Peninsula |
Project in Poland financed by DG Regio |
Statements
63,750,000.0 zloty
0 references
75,000,000.0 zloty
0 references
85.0 percent
0 references
1 April 2017
0 references
30 April 2022
0 references
URZĄD MORSKI W GDYNI
0 references
Zakres przedmiotowy projektu: Głównym elementem przedsięwzięcia jest odbudowa ostróg na odcinku od 0,3 km we Władysławowie do 12,3 km w Kuźnicy. Istniejące ostrogi (ok. 110 szt.) zostaną zlikwidowane. Pozostawione zostaną 4 ostrogi, które zostały wykonane w 2012 roku oraz 5 ostróg przy falochronie Portu Władysławowo.Planowane jest odtworzenie 135 ostróg. Przewidziany do odbudowy system ostróg zostanie wykonany z pali drewnianych.Sumarycznie odnowiony system będzie się składał z około 144 ostróg. Długość odcinka na którym realizowane będzie zadanie w stosunku do długości odcinka przeznaczonego do ochrony zgodnie z POBM wynosi 59%. Wskaźniki produktu: Liczba wybudowanych urządzeń dla celów ochrony przeciwpowodziowej - szt. 1 Wskaźniki rezultatu: Długość linii brzegowej, na której prowadzone są działania z zakresu ochrony brzegów morskich – 12 km. (Polish)
0 references
The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km. (English)
14 October 2020
0 references
Identifiers
POIS.02.01.00-00-0026/17
0 references