The internet of new opportunities — the NGA network in the district of oak and Mielec. (Q86843): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project aims at providing broadband access to the network of 12 121 households and connecting 102 educational establishments from the project area to a broadband network.The project covers the design, construction and deployment of a GPON network capable of providing services in accordance with NGA-POPC network requirements of at least 100 Mbps.The infrastructure being built will include passive elements, telecommunications nodes and equip...)
Property / summary
The project aims at providing broadband access to the network of 12 121 households and connecting 102 educational establishments from the project area to a broadband network.The project covers the design, construction and deployment of a GPON network capable of providing services in accordance with NGA-POPC network requirements of at least 100 Mbps.The infrastructure being built will include passive elements, telecommunications nodes and equipment and active devices.The broadband network built will reach the following parameters:— Number of access nodes created — 19, — length of the broadband network — 1 216 km.The new network will provide people, public and economic operators in the project area with access to broadband, internet, TV and multimedia information and services.The implementation of the project will contribute directly to the objective of the specific objective of the 2014-2020 Operational Programme Digital Poland under Priority Axis I, which reads “The territorial disparities in broadband access opportunities for high speed internet access”, which is implemented through action 1.1. (English)
 
Property / summary: The project aims at providing broadband access to the network of 12 121 households and connecting 102 educational establishments from the project area to a broadband network.The project covers the design, construction and deployment of a GPON network capable of providing services in accordance with NGA-POPC network requirements of at least 100 Mbps.The infrastructure being built will include passive elements, telecommunications nodes and equipment and active devices.The broadband network built will reach the following parameters:— Number of access nodes created — 19, — length of the broadband network — 1 216 km.The new network will provide people, public and economic operators in the project area with access to broadband, internet, TV and multimedia information and services.The implementation of the project will contribute directly to the objective of the specific objective of the 2014-2020 Operational Programme Digital Poland under Priority Axis I, which reads “The territorial disparities in broadband access opportunities for high speed internet access”, which is implemented through action 1.1. (English) / rank
Normal rank
 

Revision as of 15:00, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The internet of new opportunities — the NGA network in the district of oak and Mielec.
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    37,566,844.41 zloty
    0 references
    9,016,042.66 Euro
    13 January 2020
    0 references
    44,196,287.54 zloty
    0 references
    10,607,109.01 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 September 2018
    0 references
    31 December 2021
    0 references
    WDM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    49°52'42.6"N, 21°24'42.8"E
    0 references

    50°3'40.0"N, 21°14'49.9"E
    0 references

    50°2'46.0"N, 21°24'46.1"E
    0 references

    49°52'36.8"N, 21°18'19.1"E
    0 references

    49°58'43.0"N, 21°17'26.9"E
    0 references

    50°5'9.2"N, 21°23'41.3"E
    0 references

    50°23'13.2"N, 21°21'24.1"E
    0 references

    50°20'22.9"N, 21°20'0.6"E
    0 references

    50°24'49.7"N, 21°22'54.1"E
    0 references

    50°16'48.7"N, 21°27'47.2"E
    0 references

    50°26'10.7"N, 21°29'48.5"E
    0 references

    50°11'38.0"N, 21°28'47.6"E
    0 references

    50°11'47.0"N, 21°16'34.3"E
    0 references

    50°22'14.2"N, 21°27'50.8"E
    0 references

    50°15'43.6"N, 21°17'54.6"E
    0 references
    Celem projektu jest objęcie szerokopasmowym dostępem do sieci 12 121 gospodarstw domowych oraz podłączenie do sieci szerokopasmowej 102 placówek edukacyjnych z obszaru objętego projektem. Zakres projektu obejmuje zaprojektowanie, wybudowanie i uruchomienie sieci szerokopasmowej dostępowej w technologii światłowodowej (GPON) o przepustowości min. 100 Mb/s, zapewniającej świadczenie usług zgodnie z wymaganiami dla sieci NGA-POPC. Budowana infrastruktura obejmie elementy pasywne, węzły telekomunikacyjne wraz z wyposażeniem oraz urządzenia aktywne. Wybudowana sieć szerokopasmowa osiągnie następujące parametry: - Liczba utworzonych węzłów dostępowych – 19, - Długość sieci szerokopasmowej – 1216 km. Nowopowstała sieć zapewni mieszkańcom, podmiotom publicznym oraz gospodarczym z terenu objętego projektem możliwość korzystania z usług szerokopasmowych, Internetu, telewizyjnych oraz z multimedialnych zasobów informacji i usług świadczonych elektronicznie. Realizacja projektu przyczyni się w bezpośredni sposób do realizacji celu szczegółowego Programu Operacyjnego Polska Cyfrowa na lata 2014-2020, sformułowanego w ramach osi priorytetowej I, który brzmi „Wyeliminowanie terytorialnych różnic w możliwości dostępu do szerokopasmowego Internetu o wysokich przepustowościach”, realizowanego poprzez działanie 1.1. (Polish)
    0 references

    Identifiers

    POPC.01.01.00-18-0022/18
    0 references