Construction of 2 ice breakers for the winter flood protection in Warsaw (Q85065): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the design and construction of 2 icebreakers:front and top in order to increase the cold flood shield of the Włocławek reservoir situated in the Kujawsko-Pomorskie Province:Włocławek, Włocławek and July, Mazowieckie Province:Płocki, m. Płock (km.Vistula 618-678 to M. Włocławek)., remove_old_english_translation)
(‎Created claim: summary (P836): The project includes the design and construction of 2 icebreakers: frontal and linear to increase the winter flood cover of the Włocławska reservoir located in the Kuyavian-Pomeranian Voivodeship: Włocławski, Włocławek and Lipnowski district, Mazowieckie voivodship: Płock, M. Płock (km. Vistula 618-678 to M. Włocławek)., translated_summary)
Property / summary
 
The project includes the design and construction of 2 icebreakers: frontal and linear to increase the winter flood cover of the Włocławska reservoir located in the Kuyavian-Pomeranian Voivodeship: Włocławski, Włocławek and Lipnowski district, Mazowieckie voivodship: Płock, M. Płock (km. Vistula 618-678 to M. Włocławek). (English)
Property / summary: The project includes the design and construction of 2 icebreakers: frontal and linear to increase the winter flood cover of the Włocławska reservoir located in the Kuyavian-Pomeranian Voivodeship: Włocławski, Włocławek and Lipnowski district, Mazowieckie voivodship: Płock, M. Płock (km. Vistula 618-678 to M. Włocławek). (English) / rank
 
Normal rank
Property / summary: The project includes the design and construction of 2 icebreakers: frontal and linear to increase the winter flood cover of the Włocławska reservoir located in the Kuyavian-Pomeranian Voivodeship: Włocławski, Włocławek and Lipnowski district, Mazowieckie voivodship: Płock, M. Płock (km. Vistula 618-678 to M. Włocławek). (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:53, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of 2 ice breakers for the winter flood protection in Warsaw
Project in Poland financed by DG Regio

    Statements

    0 references
    31,520,103.1 zloty
    0 references
    7,564,824.74 Euro
    13 January 2020
    0 references
    37,082,474.23 zloty
    0 references
    8,899,793.82 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2020
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE - RZGW W WARSZAWIE
    0 references
    0 references
    0 references
    Projekt obejmuje zaprojektowanie i wybudowanie 2 lodołamaczy: czołowego i liniowego w celu zwiększenia zimowej osłony przeciwpowodziowej Zbiornika Włocławskiego położonego na terenie woj kujawsko-pomorskiego: pow. włocławski, m. Włocławek i pow. lipnowski , woj. mazowieckiego: pow. płocki, m. Płock (km. Wisły 618-678 do m. Włocławek). (Polish)
    0 references
    The project includes the design and construction of 2 icebreakers: frontal and linear to increase the winter flood cover of the Włocławska reservoir located in the Kuyavian-Pomeranian Voivodeship: Włocławski, Włocławek and Lipnowski district, Mazowieckie voivodship: Płock, M. Płock (km. Vistula 618-678 to M. Włocławek). (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0012/16
    0 references