(‎Removed claim: summary (P836): Zad.1:Water management in the catchment area of the river.For Olympic, Zad.2:Water management in the catchment area of the river.Slavic, Zad.3:Water management in the catchment area of the river.Passion fruit, Zad.4:Water management in the catchment area of the river.The gravel, the total cost of the project is estimated at PLN 63 353 221,66.The project uses natural or natural based methods.The way in which the rainwater is to be used in the p...)
(‎Created claim: summary (P836): Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the proje...)
Property / summary
 
Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the project is: — draining to the ground in the amount of 27897 m³, – use for economic purposes in the amount of 3415 m³, – intake of water to supply the shanks in the amount of 164.25 m³. As part of the project, rainwater drainage with a total length of 7121 m will be built or modernised. As part of the project, a total of 8 storage tanks will be built/modernised, both open and closed. In the areas covered by the project, the total impermeable surface size is 1025090 m², the change in surface type (sealing) is 1200 m². (English)
Property / summary: Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the project is: — draining to the ground in the amount of 27897 m³, – use for economic purposes in the amount of 3415 m³, – intake of water to supply the shanks in the amount of 164.25 m³. As part of the project, rainwater drainage with a total length of 7121 m will be built or modernised. As part of the project, a total of 8 storage tanks will be built/modernised, both open and closed. In the areas covered by the project, the total impermeable surface size is 1025090 m², the change in surface type (sealing) is 1200 m². (English) / rank
 
Normal rank
Property / summary: Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the project is: — draining to the ground in the amount of 27897 m³, – use for economic purposes in the amount of 3415 m³, – intake of water to supply the shanks in the amount of 164.25 m³. As part of the project, rainwater drainage with a total length of 7121 m will be built or modernised. As part of the project, a total of 8 storage tanks will be built/modernised, both open and closed. In the areas covered by the project, the total impermeable surface size is 1025090 m², the change in surface type (sealing) is 1200 m². (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:53, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Water management in the city of Gorzów Wlkp. — Stage I
Project in Poland financed by DG Regio

    Statements

    0 references
    53,647,411.32 zloty
    0 references
    12,875,378.72 Euro
    13 January 2020
    0 references
    63,114,601.62 zloty
    0 references
    15,147,504.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    MIASTO GORZÓW WIELKOPOLSKI
    0 references
    0 references
    0 references
    Zad.1: Zagospodarowanie wód opadowych w zlewni ul. Olimpijskiej, Zad.2: Zagospodarowanie wód opadowych w zlewni ul. Słowiańskiej, Zad.3: Zagospodarowanie wód opadowych w zlewni ul. Szmaragdowej, Zad.4: Zagospodarowanie wód opadowych w zlewni ul. Żwirowej, Całkowity koszt projektu szacuje się na poziomie 63 353 221,66 zł. W projekcie zastosowane są metody naturalne lub bazujące na naturalnych. Planowany sposób wykorzystania wód opadowych w projekcie to: - rozsączanie do gruntu w ilości 27897 m3, - wykorzystanie na cele gospodarcze w ilości 3415 m3, - pobór wody do zasilania szaletów w ilości 164,25m3 W związku z powyższym planuje się 31 % objętości wód objętości wód zatrzymanych, zretencjonowanych wykorzystać. W ramach projektu wybudowana lub zmodernizowana zostanie kanalizacja deszczowa o łącznej dł 7121 m. Będzie to kanalizacja grawitacyjna. W ramach projektu zostanie wybudowanych/zmodernizowanych łącznie 8 zbiorników retencyjnych, zarówno otwartych, jak i zamkniętych. Na obszarach objętych projektem sumaryczna wielkość powierzchni nieprzepuszczalnych wynosi 1 025 090 m2 zmiana rodzaju powierzchni (rozszczelnienia) wynosi 1 200m2. (Polish)
    0 references
    Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the project is: — draining to the ground in the amount of 27897 m³, – use for economic purposes in the amount of 3415 m³, – intake of water to supply the shanks in the amount of 164.25 m³. As part of the project, rainwater drainage with a total length of 7121 m will be built or modernised. As part of the project, a total of 8 storage tanks will be built/modernised, both open and closed. In the areas covered by the project, the total impermeable surface size is 1025090 m², the change in surface type (sealing) is 1200 m². (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0006/17
    0 references