Dewatering of the Kedzyn district in Częstochowa (Q85041): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to structure and manage the water management of the Kedzyn district in Częstochowa.The scope of the investment consists of the construction of a rainwater collector, an open rainwater collector, a ditch, a retention/evaporation basin and a technological path.As part of the project, a closed rainwater collector will be carried out from a length ca tube of ca.1 363 m., open collector in the form of a ditch of length 576...)
(‎Created claim: summary (P836): The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, stor...)
Property / summary
 
The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, storage tank with a capacity of approx. 9000 m³, emergency transfer with a total length of approx. 121.2 m and an open ditch with a length of 110.7 m. To facilitate access to the ditch and the reservoir, it is planned to build technological roads with a total length of 1025.16 m and a width of 3 m. The project plans to clean up wastewater in the form of rain chambers located along the rain canal route, equipped with settlers and a system of five separators. The project also involves rebuilding and securing existing earth cable lines, waterworks and sanitary sewers in order to avoid collisions with the design and planting of deciduous trees and sowing the affected area with a mixture of lawn. (English)
Property / summary: The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, storage tank with a capacity of approx. 9000 m³, emergency transfer with a total length of approx. 121.2 m and an open ditch with a length of 110.7 m. To facilitate access to the ditch and the reservoir, it is planned to build technological roads with a total length of 1025.16 m and a width of 3 m. The project plans to clean up wastewater in the form of rain chambers located along the rain canal route, equipped with settlers and a system of five separators. The project also involves rebuilding and securing existing earth cable lines, waterworks and sanitary sewers in order to avoid collisions with the design and planting of deciduous trees and sowing the affected area with a mixture of lawn. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, storage tank with a capacity of approx. 9000 m³, emergency transfer with a total length of approx. 121.2 m and an open ditch with a length of 110.7 m. To facilitate access to the ditch and the reservoir, it is planned to build technological roads with a total length of 1025.16 m and a width of 3 m. The project plans to clean up wastewater in the form of rain chambers located along the rain canal route, equipped with settlers and a system of five separators. The project also involves rebuilding and securing existing earth cable lines, waterworks and sanitary sewers in order to avoid collisions with the design and planting of deciduous trees and sowing the affected area with a mixture of lawn. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Dewatering of the Kedzyn district in Częstochowa
Project in Poland financed by DG Regio

    Statements

    0 references
    11,314,503.14 zloty
    0 references
    2,715,480.75 Euro
    13 January 2020
    0 references
    13,311,180.17 zloty
    0 references
    3,194,683.24 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 December 2015
    0 references
    31 December 2019
    0 references
    GMINA MIASTO CZĘSTOCHOWA
    0 references
    0 references
    0 references
    Celem projektu jest uporządkowanie gospodarki wód w dzielnicy Kiedrzyn w Częstochowie i jej odpowiednie zagospodarowanie. Zakres przedmiotowy Inwestycja obejmuje budowę rurowego kolektora deszczowego, otwartego kolektora deszczowego – rowu, zbiornika retencyjnego chłonno-odparowującego i drogi technologicznej. W ramach przedsięwzięcia zrealizowany zostanie zamknięty kolektor deszczowy z rur żelbetowych o długości ok. 1363m., otwarty kolektor w formie rowu o długości 576,03 m, zbiornik retencyjny o pojemności ok. 9000m3 , przelew awaryjny o łącznej długości ok. 121,2 m oraz otwarty rów o długości 110,7 m. Dla ułatwienia dostępu do rowu i zbiornika planuje się budowę dróg technologicznych o łącznej długości 1025,16 m i szerokości 3 m. W ramach projektu planuje się urządzenia do podczyszczania ścieków w postaci komór deszczowych rozmieszczonych na trasie kanału deszczowego, wyposażonych w osadniki oraz układu pięciu separatorów. Projekt również zakłada przebudowę i zabezpieczenie istniejących ziemnych linii kablowych, wodociągów i kanalizacji sanitarnej w celu uniknięcia kolizji z projektowaną budową oraz nasadzenie drzew liściastych oraz obsianie naruszonego terenu mieszanką trawnikową. (Polish)
    0 references
    The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, storage tank with a capacity of approx. 9000 m³, emergency transfer with a total length of approx. 121.2 m and an open ditch with a length of 110.7 m. To facilitate access to the ditch and the reservoir, it is planned to build technological roads with a total length of 1025.16 m and a width of 3 m. The project plans to clean up wastewater in the form of rain chambers located along the rain canal route, equipped with settlers and a system of five separators. The project also involves rebuilding and securing existing earth cable lines, waterworks and sanitary sewers in order to avoid collisions with the design and planting of deciduous trees and sowing the affected area with a mixture of lawn. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.01.00-00-0003/17
    0 references