Construction of the S7 expressway, odc. Warsaw — Grójec (Q85866): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The main part of the project is the construction of the S7 expressway, along the section beginning in the vicinity of the “Lotnisko” interchange to the Grójec bypass, located on the comprehensive TEN-T network with a total length of 29.16 km., remove_old_english_translation)
Property / summary
The main part of the project is the construction of the S7 expressway, along the section beginning in the vicinity of the “Lotnisko” interchange to the Grójec bypass, located on the comprehensive TEN-T network with a total length of 29.16 km. (English)
 
Property / summary: The main part of the project is the construction of the S7 expressway, along the section beginning in the vicinity of the “Lotnisko” interchange to the Grójec bypass, located on the comprehensive TEN-T network with a total length of 29.16 km. (English) / rank
Normal rank
 

Revision as of 14:50, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S7 expressway, odc. Warsaw — Grójec
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    542,448,242.42 zloty
    0 references
    130,187,578.18 Euro
    13 January 2020
    0 references
    638,174,402.85 zloty
    0 references
    153,161,856.68 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    51°51'55.8"N, 20°52'3.0"E
    0 references

    52°5'20.4"N, 20°56'31.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references

    51°58'48.0"N, 20°50'1.3"E
    0 references

    52°9'29.9"N, 20°55'27.1"E
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Zasadniczą częścią przedsięwzięcia jest budowa drogi ekspresowej S7 na odcinku mającym początek w okolicach węzła „Lotnisko” do obwodnicy Grójca, zlokalizowanej w sieci kompleksowej TEN-T o łącznej długości 29,16 km. (Polish)
    0 references

    Identifiers

    POIS.03.01.00-00-0045/18
    0 references
    4888
    0 references