Improving the efficiency of the transmission and distribution of heat and the development of a residential district heating network in Kędzierzyn-Koźle (Q84817): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main objective of the project is to improve air quality by reducing the so-called ‘air quality’.“low emission” and reducing energy losses generated by the distribution of energy and heat.Achieving the target will be achieved through the extension of the network and the connection of new customers, as well as the modernisation of the old heat grid.The project consists of modernising and extending the network to the three sites of Kędzierzyn...) |
(Created claim: summary (P836): The main objective of the project is to improve air quality by reducing the so-called. “low emissions” and reduction of energy losses arising from energy and heat distribution. The goal will be achieved by expanding the network and connecting new customers, as well as by modernising the old heating network. The project aims to modernise and expand the network on three districts of Kędzierzyna-Koźla, in terms of modernisation through a thorough r...) |
||||||||||||||
Property / summary | |||||||||||||||
The main objective of the project is to improve air quality by reducing the so-called. “low emissions” and reduction of energy losses arising from energy and heat distribution. The goal will be achieved by expanding the network and connecting new customers, as well as by modernising the old heating network. The project aims to modernise and expand the network on three districts of Kędzierzyna-Koźla, in terms of modernisation through a thorough replacement of the existing heat network made in traditional technology with a new pre-insulated one. As part of the construction and assembly works, 5 tasks were distinguished, which constitute 3 stages of the modernisation of the thermal grid and 2 stages of the expansion of the thermal grid. (English) | |||||||||||||||
Property / summary: The main objective of the project is to improve air quality by reducing the so-called. “low emissions” and reduction of energy losses arising from energy and heat distribution. The goal will be achieved by expanding the network and connecting new customers, as well as by modernising the old heating network. The project aims to modernise and expand the network on three districts of Kędzierzyna-Koźla, in terms of modernisation through a thorough replacement of the existing heat network made in traditional technology with a new pre-insulated one. As part of the construction and assembly works, 5 tasks were distinguished, which constitute 3 stages of the modernisation of the thermal grid and 2 stages of the expansion of the thermal grid. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main objective of the project is to improve air quality by reducing the so-called. “low emissions” and reduction of energy losses arising from energy and heat distribution. The goal will be achieved by expanding the network and connecting new customers, as well as by modernising the old heating network. The project aims to modernise and expand the network on three districts of Kędzierzyna-Koźla, in terms of modernisation through a thorough replacement of the existing heat network made in traditional technology with a new pre-insulated one. As part of the construction and assembly works, 5 tasks were distinguished, which constitute 3 stages of the modernisation of the thermal grid and 2 stages of the expansion of the thermal grid. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 14:39, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the efficiency of the transmission and distribution of heat and the development of a residential district heating network in Kędzierzyn-Koźle |
Project in Poland financed by DG Regio |
Statements
7,242,610.04 zloty
0 references
13,459,939.0 zloty
0 references
53.81 percent
0 references
28 April 2017
0 references
31 December 2020
0 references
MIEJSKI ZAKŁAD ENERGETYKI CIEPLNEJ SP. Z O.O.
0 references
Celem głównym projektu jest poprawa jakości powietrza poprzez zmniejszenie tzw. „niskiej emisji” oraz ograniczenie strat energii powstających w procesie dystrybucji energii i ciepła. Realizacja celu nastąpi poprzez rozbudowę sieci oraz przyłączenie nowych odbiorców, a także modernizację starej sieci cieplnej. Projekt zakłada zmodernizowanie i rozbudowę sieci na trzech osiedlach Kędzierzyna-Koźla, w zakresie modernizacji poprzez gruntowną wymianę istniejącej sieci cieplnej wykonanej w technologii tradycyjnej na nową preizolowaną. W ramach robót budowlano montażowych wyodrębniono 5 zadań, które stanowią 3 etapy modernizacji sieci cieplnej oraz 2 etapy rozbudowy sieci cieplnej. (Polish)
0 references
The main objective of the project is to improve air quality by reducing the so-called. “low emissions” and reduction of energy losses arising from energy and heat distribution. The goal will be achieved by expanding the network and connecting new customers, as well as by modernising the old heating network. The project aims to modernise and expand the network on three districts of Kędzierzyna-Koźla, in terms of modernisation through a thorough replacement of the existing heat network made in traditional technology with a new pre-insulated one. As part of the construction and assembly works, 5 tasks were distinguished, which constitute 3 stages of the modernisation of the thermal grid and 2 stages of the expansion of the thermal grid. (English)
14 October 2020
0 references
Identifiers
POIS.01.05.00-00-0017/17
0 references