(Removed claim: summary (P836): The project was located in the south-eastern part of Krosno City Council in the area of the cadastral parcel No 2746/1.The parcel is owned by the municipality of Krosno and MPGK Krosno Sp. z o.o. is a perpetual usufructuary.In this area it is operated by Elektrociepłownia Łęańska, which is owned by the Thermal Energy Division of the Municipal Thermal Management Company in Krosno Sp. z o.o., and the project covers the construction of a biomass-...) |
(Created claim: summary (P836): The project was located in the south-eastern part of the Municipality of Krosno in the area of the registration plot number 2746/1. The plot is owned by the Municipality of Krosno, while MPGK Krosno Sp. z o.o. is its perpetual user. In this area the Elektrociepłownia Łężańska, which belongs to the Department of Heat Energy of the Municipal Enterprise for Municipal Economy in Krosno Sp. z o.o., is being operated. The project includes the construc...) |
||||||||||||||
Property / summary | |||||||||||||||
The project was located in the south-eastern part of the Municipality of Krosno in the area of the registration plot number 2746/1. The plot is owned by the Municipality of Krosno, while MPGK Krosno Sp. z o.o. is its perpetual user. In this area the Elektrociepłownia Łężańska, which belongs to the Department of Heat Energy of the Municipal Enterprise for Municipal Economy in Krosno Sp. z o.o., is being operated. The project includes the construction of a biomass-fired water boiler in the form of wood chips (as the most available fuel) with a capacity of 7 MW. The new biomass boiler planned to be implemented within the project will be installed in the existing boiler room in the coal boiler hall. In view of the fact that no increase in total heat production in the CHP plant “Łężańska'” is expected, there is also no expansion of the installation of main water preparation, degasifiers, pumping plants, etc. The new boiler will be plugged into the existing system parallel to the existing coal boilers, which will allow both its own operation and with any boiler. The biomass boiler will have a separate cleaning and exhaust system. The connection of the installation of renewable energy sources to the grid will be carried out in accordance with the provisions of the Act of 10 April 1997 – Energy Law (Dz. U. of 2012, pos. 1059, with late.). The efficiency of heat production in the biomass boiler will be above 85 %. The project shall include the implementation of: a biomass water boiler with a heat capacity of 7 MWth; exhaust after-treatment systems: cyclone battery (optional), electrostatic filter, alternatively fabric filter and chimney height of 30 m; boiler supply conveyors; the necessary accompanying construction work for the adaptation of the existing hall to the construction of the new boiler, with the adaptation of the existing foundations for the new boiler and exhaust after-treatment installation. (English) | |||||||||||||||
Property / summary: The project was located in the south-eastern part of the Municipality of Krosno in the area of the registration plot number 2746/1. The plot is owned by the Municipality of Krosno, while MPGK Krosno Sp. z o.o. is its perpetual user. In this area the Elektrociepłownia Łężańska, which belongs to the Department of Heat Energy of the Municipal Enterprise for Municipal Economy in Krosno Sp. z o.o., is being operated. The project includes the construction of a biomass-fired water boiler in the form of wood chips (as the most available fuel) with a capacity of 7 MW. The new biomass boiler planned to be implemented within the project will be installed in the existing boiler room in the coal boiler hall. In view of the fact that no increase in total heat production in the CHP plant “Łężańska'” is expected, there is also no expansion of the installation of main water preparation, degasifiers, pumping plants, etc. The new boiler will be plugged into the existing system parallel to the existing coal boilers, which will allow both its own operation and with any boiler. The biomass boiler will have a separate cleaning and exhaust system. The connection of the installation of renewable energy sources to the grid will be carried out in accordance with the provisions of the Act of 10 April 1997 – Energy Law (Dz. U. of 2012, pos. 1059, with late.). The efficiency of heat production in the biomass boiler will be above 85 %. The project shall include the implementation of: a biomass water boiler with a heat capacity of 7 MWth; exhaust after-treatment systems: cyclone battery (optional), electrostatic filter, alternatively fabric filter and chimney height of 30 m; boiler supply conveyors; the necessary accompanying construction work for the adaptation of the existing hall to the construction of the new boiler, with the adaptation of the existing foundations for the new boiler and exhaust after-treatment installation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project was located in the south-eastern part of the Municipality of Krosno in the area of the registration plot number 2746/1. The plot is owned by the Municipality of Krosno, while MPGK Krosno Sp. z o.o. is its perpetual user. In this area the Elektrociepłownia Łężańska, which belongs to the Department of Heat Energy of the Municipal Enterprise for Municipal Economy in Krosno Sp. z o.o., is being operated. The project includes the construction of a biomass-fired water boiler in the form of wood chips (as the most available fuel) with a capacity of 7 MW. The new biomass boiler planned to be implemented within the project will be installed in the existing boiler room in the coal boiler hall. In view of the fact that no increase in total heat production in the CHP plant “Łężańska'” is expected, there is also no expansion of the installation of main water preparation, degasifiers, pumping plants, etc. The new boiler will be plugged into the existing system parallel to the existing coal boilers, which will allow both its own operation and with any boiler. The biomass boiler will have a separate cleaning and exhaust system. The connection of the installation of renewable energy sources to the grid will be carried out in accordance with the provisions of the Act of 10 April 1997 – Energy Law (Dz. U. of 2012, pos. 1059, with late.). The efficiency of heat production in the biomass boiler will be above 85 %. The project shall include the implementation of: a biomass water boiler with a heat capacity of 7 MWth; exhaust after-treatment systems: cyclone battery (optional), electrostatic filter, alternatively fabric filter and chimney height of 30 m; boiler supply conveyors; the necessary accompanying construction work for the adaptation of the existing hall to the construction of the new boiler, with the adaptation of the existing foundations for the new boiler and exhaust after-treatment installation. (English) / qualifier | |||||||||||||||
point in time: 14 October 2020
|
Revision as of 13:01, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Construction of a biomass boiler in “Łęańska” district heating plant in Krosno. |
Project in Poland financed by DG Regio |
Statements
3,321,600.0 zloty
0 references
5,536,000.0 zloty
0 references
60.0 percent
0 references
2 January 2018
0 references
31 December 2021
0 references
MIEJSKIE PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ - KROŚNIEŃSKI HOLDING KOMUNALNY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedsięwzięcie zostało zlokalizowane w południowo-wschodnim części Gminy Miasta Krosno na obszarze działki ewidencyjnej numerze 2746/1. Działka jest własnością Gminy Krosno, natomiast MPGK Krosno Sp. z o.o. jest jej użytkownikiem wieczystym. Na tym terenie eksploatowana jest Elektrociepłownia Łężańska należąca do Oddziału Energetyki Cieplnej Miejskiego Przedsiębiorstwa Gospodarki Komunalnej w Krośnie Sp. z o.o. Projekt swoim zakres obejmuje budowę kotła wodnego opalanego biomasą w postaci zrębek leśnych (jako paliwa najbardziej dostępnego) o mocy 7 MW. Nowy kocioł biomasowy planowany do realizacji w ramach Przedsięwzięcia zainstalowany będzie na terenie istniejącej kotłowni w hali kotłów węglowych. Zważywszy na fakt, iż nie przewiduje się zwiększenia całkowitej produkcji ciepła w Elektrociepłowni ''Łężańska'', nie przewiduje się również rozbudowy instalacji przygotowania wody sieciowej, odgazowywaczy, przepompowni itp. Nowy kocioł zostanie wpięty do istniejącego systemu równolegle do istniejących kotłów węglowych, co umożliwi zarówno jego samodzielną pracę jak i wspólnie z dowolnym z kotłów. Kocioł na biomasę posiadać będzie odrębną instalację oczyszczania i wyprowadzenia spalin. Przyłącze instalacji odnawialnego źródła energii do sieci zostanie dokonane zgodnie z przepisami ustawy z dnia 10 kwietnia 1997 r. - Prawo energetyczne (Dz. U. z 2012r. poz. 1059, z późn. zm.). Sprawność produkcji ciepła w kotle biomasowym wynosić będzie powyżej 85%. Przedsięwzięcie obejmuje wykonanie: a) kotła wodnego na biomasę o mocy w cieple 7 MWth ; b) układów oczyszczania spalin: bateria cyklonów (opcjonalnie), elektrofiltr, alternatywnie filtr tkaninowy oraz komina o wysokości 30 m.; c) przenośników zasilających kocioł; d) niezbędnych towarzyszących prac budowlanych, związanych z dostosowaniem istniejącej hali do zabudowy nowego kotła wraz z adaptacją istniejących fundamentów pod nowy kocioł i instalację oczyszczania spalin. (Polish)
0 references
The project was located in the south-eastern part of the Municipality of Krosno in the area of the registration plot number 2746/1. The plot is owned by the Municipality of Krosno, while MPGK Krosno Sp. z o.o. is its perpetual user. In this area the Elektrociepłownia Łężańska, which belongs to the Department of Heat Energy of the Municipal Enterprise for Municipal Economy in Krosno Sp. z o.o., is being operated. The project includes the construction of a biomass-fired water boiler in the form of wood chips (as the most available fuel) with a capacity of 7 MW. The new biomass boiler planned to be implemented within the project will be installed in the existing boiler room in the coal boiler hall. In view of the fact that no increase in total heat production in the CHP plant “Łężańska'” is expected, there is also no expansion of the installation of main water preparation, degasifiers, pumping plants, etc. The new boiler will be plugged into the existing system parallel to the existing coal boilers, which will allow both its own operation and with any boiler. The biomass boiler will have a separate cleaning and exhaust system. The connection of the installation of renewable energy sources to the grid will be carried out in accordance with the provisions of the Act of 10 April 1997 – Energy Law (Dz. U. of 2012, pos. 1059, with late.). The efficiency of heat production in the biomass boiler will be above 85 %. The project shall include the implementation of: a biomass water boiler with a heat capacity of 7 MWth; exhaust after-treatment systems: cyclone battery (optional), electrostatic filter, alternatively fabric filter and chimney height of 30 m; boiler supply conveyors; the necessary accompanying construction work for the adaptation of the existing hall to the construction of the new boiler, with the adaptation of the existing foundations for the new boiler and exhaust after-treatment installation. (English)
14 October 2020
0 references
Identifiers
POIS.01.01.01-00-0022/17
0 references