Implementation of a method for the integration of heating and floating heating in order to improve the energy efficiency of buildings (Q82500): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): “As part of the project, the Company plans to implement a new technology which will enable the construction and market of building divisions that have been significantly improved compared to the solutions currently available.As a result of the implementation of the Project, prefabricate building structures fitted with a heating system will be further integrated with the partitioning compounds (PCM) in order to improve the energy efficiency of...)
(‎Created claim: summary (P836): “As part of the project, the Company plans to implement a new technology that will enable the start of production and launch of the construction division significantly improved compared to the currently available solutions. As a result of the project, prefabricated reinforced concrete partitions equipped with surface heating will be additionally integrated with floating-phase compounds (PCM), which will improve the energy efficiency of buildings...)
Property / summary
 
“As part of the project, the Company plans to implement a new technology that will enable the start of production and launch of the construction division significantly improved compared to the currently available solutions. As a result of the project, prefabricated reinforced concrete partitions equipped with surface heating will be additionally integrated with floating-phase compounds (PCM), which will improve the energy efficiency of buildings built using them. The implementation of innovative technology will allow the Company to introduce a significantly improved product to its offer. Support for surface heating with PCM will improve the efficiency of the solution, resulting in a reduction in the amount of energy consumed in the operation of buildings. In the long term, this solution will be applied in almost zero-energy buildings to meet the obligations arising from the provisions of the EPBD. What is important, thanks to the integration into one product of two elements, which are currently offered on the market as separate solutions, partitions of the Company introduced as a result of the implementation of the Project will be significantly improved in relation to already available solutions. The main objective of the Project is to increase the innovativeness of Budizol through the implementation of a unique technology resulting from R & D works carried out by the Company. As a result of the implementation of the Project in the Company, the level of innovation and competitiveness will be increased, and the result of the Project as a novelty on the market will have a positive impact on both the development of the housing market and aspects related to the energy efficiency of the sector.” (English)
Property / summary: “As part of the project, the Company plans to implement a new technology that will enable the start of production and launch of the construction division significantly improved compared to the currently available solutions. As a result of the project, prefabricated reinforced concrete partitions equipped with surface heating will be additionally integrated with floating-phase compounds (PCM), which will improve the energy efficiency of buildings built using them. The implementation of innovative technology will allow the Company to introduce a significantly improved product to its offer. Support for surface heating with PCM will improve the efficiency of the solution, resulting in a reduction in the amount of energy consumed in the operation of buildings. In the long term, this solution will be applied in almost zero-energy buildings to meet the obligations arising from the provisions of the EPBD. What is important, thanks to the integration into one product of two elements, which are currently offered on the market as separate solutions, partitions of the Company introduced as a result of the implementation of the Project will be significantly improved in relation to already available solutions. The main objective of the Project is to increase the innovativeness of Budizol through the implementation of a unique technology resulting from R & D works carried out by the Company. As a result of the implementation of the Project in the Company, the level of innovation and competitiveness will be increased, and the result of the Project as a novelty on the market will have a positive impact on both the development of the housing market and aspects related to the energy efficiency of the sector.” (English) / rank
 
Normal rank
Property / summary: “As part of the project, the Company plans to implement a new technology that will enable the start of production and launch of the construction division significantly improved compared to the currently available solutions. As a result of the project, prefabricated reinforced concrete partitions equipped with surface heating will be additionally integrated with floating-phase compounds (PCM), which will improve the energy efficiency of buildings built using them. The implementation of innovative technology will allow the Company to introduce a significantly improved product to its offer. Support for surface heating with PCM will improve the efficiency of the solution, resulting in a reduction in the amount of energy consumed in the operation of buildings. In the long term, this solution will be applied in almost zero-energy buildings to meet the obligations arising from the provisions of the EPBD. What is important, thanks to the integration into one product of two elements, which are currently offered on the market as separate solutions, partitions of the Company introduced as a result of the implementation of the Project will be significantly improved in relation to already available solutions. The main objective of the Project is to increase the innovativeness of Budizol through the implementation of a unique technology resulting from R & D works carried out by the Company. As a result of the implementation of the Project in the Company, the level of innovation and competitiveness will be increased, and the result of the Project as a novelty on the market will have a positive impact on both the development of the housing market and aspects related to the energy efficiency of the sector.” (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:41, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Implementation of a method for the integration of heating and floating heating in order to improve the energy efficiency of buildings
Project in Poland financed by DG Regio

    Statements

    0 references
    6,000,000.0 zloty
    0 references
    1,440,000.0 Euro
    13 January 2020
    0 references
    14,391,400.0 zloty
    0 references
    3,453,936.0 Euro
    13 January 2020
    0 references
    41.69 percent
    0 references
    1 October 2016
    0 references
    31 December 2020
    0 references
    BUDIZOL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWO AKCYJNA
    0 references
    0 references
    "W ramach Projektu, Spółka planuje wdrożenie nowej technologii, która umożliwi rozpoczęcie wytwarzania i wprowadzenie na rynek przegrody budowlanej znacząco ulepszonej w porównaniu do dostępnych obecnie rozwiązań. W wyniku realizacji Projektu prefabrykowane, żelbetowe przegrody budowlane wyposażone w ogrzewanie płaszczyznowe zostaną dodatkowo zintegrowane ze związkami zmiennofazowymi (PCM), co pozwoli na poprawę efektywności energetycznej budynków wznoszonych przy ich wykorzystaniu. Wdrożenie innowacyjnej technologii pozwoli Spółce na wprowadzenie do swojej oferty znacząco ulepszonego produktu. Wspomaganie ogrzewania płaszczyznowego za pomocą PCM przyczyni się do poprawy efektywności działania rozwiązania, co w konsekwencji przełoży się na redukcję ilości energii zużywanej przy eksploatacji budynków. W długofalowej perspektywie rozwiązanie to będzie stosowane w budynkach prawie zero-energetycznych w celu wypełnienia zobowiązań wynikających z zapisów dyrektywy EPBD. Co istotne, dzięki integracji w jednym produkcie dwóch elementów, które są obecnie oferowane na rynku jako odrębne rozwiązania, przegrody Spółki wprowadzone w wyniku realizacji Projektu będą produktem znacząco ulepszonym względem dostępnych już rozwiązań. Głównym celem Projektu jest podniesienie innowacyjności spółki Budizol za pomocą wdrożenia unikatowej technologii będącej rezultatem przeprowadzonych przez Spółkę prac B+R. W wyniku realizacji Projektu w Spółce podniesiony zostanie poziom innowacyjności i konkurencyjności, a rezultat Projektu stanowiący nowość na rynku, wpłynie pozytywnie zarówno na rozwój rynku budownictwa mieszkalnego jak i aspekty związane z efektywnością energetyczną tego sektora." (Polish)
    0 references
    “As part of the project, the Company plans to implement a new technology that will enable the start of production and launch of the construction division significantly improved compared to the currently available solutions. As a result of the project, prefabricated reinforced concrete partitions equipped with surface heating will be additionally integrated with floating-phase compounds (PCM), which will improve the energy efficiency of buildings built using them. The implementation of innovative technology will allow the Company to introduce a significantly improved product to its offer. Support for surface heating with PCM will improve the efficiency of the solution, resulting in a reduction in the amount of energy consumed in the operation of buildings. In the long term, this solution will be applied in almost zero-energy buildings to meet the obligations arising from the provisions of the EPBD. What is important, thanks to the integration into one product of two elements, which are currently offered on the market as separate solutions, partitions of the Company introduced as a result of the implementation of the Project will be significantly improved in relation to already available solutions. The main objective of the Project is to increase the innovativeness of Budizol through the implementation of a unique technology resulting from R & D works carried out by the Company. As a result of the implementation of the Project in the Company, the level of innovation and competitiveness will be increased, and the result of the Project as a novelty on the market will have a positive impact on both the development of the housing market and aspects related to the energy efficiency of the sector.” (English)
    14 October 2020
    0 references

    Identifiers

    POIR.03.02.02-00-0370/16
    0 references