Thermal modernisation of the Hospital of Krosno Hospital (Q100298): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: budget (P474): 507,798.8688 euro)
Property / budget
507,798.8688 Euro
Amount507,798.8688 Euro
UnitEuro
 
Property / budget: 507,798.8688 Euro / rank
Preferred rank
 
Property / budget: 507,798.8688 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / budget: 507,798.8688 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 01:57, 25 September 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the Hospital of Krosno Hospital
Project in Poland financed by DG Regio

    Statements

    0 references
    1,798,454.28 zloty
    0 references
    431,629.03 Euro
    13 January 2020
    0 references
    2,115,828.62 zloty
    0 references
    85.0 percent
    0 references
    15 March 2017
    0 references
    31 December 2019
    0 references
    POWIAT KROŚNIEŃSKI
    0 references
    0 references

    52°3'13.0"N, 15°5'52.8"E
    0 references
    Przedmiotem projektu jest głęboka termomodernizacja Szpitala w Krośnie Odrz: o. pediatryczny, o. położnictwa i ginekologii, izba przyjęć. Zakres: docieplenie ścian zewn., stropodachu, podłogi na gruncie; wym. stolarki drzwiowej i okiennej, źr. ciepła c.w.u. i c.o. na gruntową pompę ciepła, grzejników na ogrzewanie podł., montaż izolacji przewodów instalacji c.o. i c.w.u., automatyki do sterowania systemem c.o z wykorzystaniem TIK, wentylacji nawiewno-wywiewnej z odzyskiem ciepła, wymianę źr. światła na energooszczędne światła LED wraz z automat. syst. sterowania oraz montaż inst. fotowoltaicznej. Gr. docelowe: mieszkańcy G. Krosno Odrz. i Pow. Krośn., użytkownicy bud. Szpitala w Krośnie Odrz., władze Pow. Krośn., instytucje systemu ochrony środ. Gł. cel projektu: Poprawa efektywności energet. w sektorze bud. użyt. publ.na obszarze G. Krosno Odrz. i Pow. Krośn., w tym m.in. poprzez optym. gosp. energet. w bud. Szpitala w Krośnie Odrz. C. szczeg.: Zmn.zapotrzebowania na e. pierwotną; Red. emisji CO2; Optym. zużycia e. elektrycznej; Zwiększenie wykorzystania OZE w zakresie gospodarki energetycznej. W. produktu: L. zmodern. energetycznie bud: 1 szt. Dod. zdolność wytw. e. cieplnej ze źr. odn: 0,06 MWt Dod. zdolność wytw. e. el. ze źr. odn: 0,15 MWe L. podm. wykorzystujących techn. informacyjno-komunikacyjne: 1 szt. L. wyb. jedn. wytw. e. cieplnej z OZE: 1 szt L. wyb. jedn. wytw. e. el. z OZE: 1 szt. L. zmodern. źr. ciepła: 1 Szt. Pow. uż. bud. poddanych termomodernizacji: 928,60 mkw W. rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 384,12 tony równoważnika CO2/rok Zmn. rocznego zużycia e. pierw. w bud. publ. (CI 32): 2104770 kWh/rok Il. zaoszcz. e. cieplnej: 2843,07 GJ/rok Il. zaoszcz. e. el.: 48,03 MWh/rok Prod. e. cieplnej z nowo wybud. inst. wykorzyst. OZE: 620,07 MWht/rok Prod. e. el. z nowo wybud. inst. wykorzys. OZE: 15 MWhe/rok Zmn. zuż. e. końcowej w wyniku real. proj.: 1528,02 GJ/rok Wzr. zatr.: 1 EPC Wzr. zatr. kob.: (Polish)
    0 references
    The project is a deep thermal renovation of the Krosno Hospital: o. paediatrics, o. obstetrics and gynaecology, Reception Chamber. Scope: insulation of the inner wall, floor, floor on the ground; including doors and window frames, hot and dry heat pump heaters, heating radiators for heating., radiators for heating pipes for heating., installation of insulation of the fittings of the heating system for heating and cooling systems, automation to control the c.o system using ICT, exhaust ventilation with heat recovery, exchange of light on energy efficient LED lights together with automatic systet. control and installation of a photovoltaic system. GR. target: the residents of G. Krosno and Pow. Thickets, users of the bud. Hospital in Krosno Odra, the authorities of Pow. Thickets, institutions of the system of protection of the system. Objective of the project: Improvement of energy efficiency in the construction industry sector in the area of G. Krosno and Pow. Krośn., including through the optimisation of energy in the budget. Hospital in Krosno Odra. Strain: Primary e; Red CO2 emissions; Electrical consumption Increasing the use of RES in the field of energy. The product: L. energy budget: 1 units Heat output of reagent (s): 0,06 MWt DOMTE e.e.z pupil: 0,15 MWe of the following information and communication technology: 1 units B. Heat e from RES: 1 noise from renewable energy sources. 1 units L. of moderation of heat: 1 unit. Renovation: 928.60 m in W. result: Estimated annual reduction in emissions of g. (CI 34): 384,12 tonnes CO2/rok equivalent in annual consumption. (CI 32): 2 104 770 kWh/year 2843,07 GJ/year Quantities saved. e el.: 48.03 MWh/year, e. heat from a new business. RES: 620,07 MWHT/year. RES: 15 MWhe/yr. e. final as a result of the action: 1528,02 GJ/year 1 EPC Standard Cat.: (English)
    0 references

    Identifiers

    RPLB.03.02.01-08-0014/18
    0 references