Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 154,540.0224 Euro / rank | |||||||||||||||
Property / EU contribution: 154,540.0224 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 154,540.0224 Euro / qualifier | |||||||||||||||
|
Revision as of 14:37, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The deep energy renovation of the Cultural Centre’s building located at ulica Wojska Polskiego 54 in Połczyn Zdroju. |
Project in Poland financed by DG Regio |
Statements
643,916.76 zloty
0 references
757,549.15 zloty
0 references
85.0 percent
0 references
14 December 2016
0 references
30 June 2020
0 references
GMINA POŁCZYN-ZDRÓJ
0 references
Przedmiotem projektu jest głęboka termomodernizacja budynku Centrum Kultury, znajdującego się przy ul. Wojska Polskiego 54 w Połczynie-Zdroju. W zakres prac termomodernizacyjnych będzie wchodziło: 1. Ocieplenie ścian piwnic i ścian fundamentowych wraz z pracami towarzyszącymi 2. Ocieplenie ścian zewnętrznych wraz z pracami towarzyszącymi 3. Wymiana stolarki okiennej wraz z parapetami wew. i zew. oraz stolarki drzwiowej. 4. Docieplenie stropu piwnicy, odbudowa tarasu i schodów 5. Docieplenie stropu poddasza, dachu, docieplenie skosów. 6. Wymiana pokrycia dachowego wraz z pracami towarzyszącymi. 7. Docieplenie podłogi na gruncie w pomieszczeniu gospodarczym nr 123. 8. Docieplenie podłogi na gruncie wraz z pracami towarzyszącymi. 9. Rozebranie posadzki ceramicznej w korytarzu z wyrównaniem poziomów w budynku, rozebranie wiatrołapu i motaż kurtyny powietrznej, docieplenie podłogi, wykonani izolacji przeciwwilgociowej. 10. Rozebranie okładzin ściennych wewnętrznych w związku z remontem instalacji co i elektrycznej. 11. Wymiana instalacji c.o. wraz z pracami towarzyszącymi. 12. Wymiana oświetlenia wewnętrznego na punkty świetlne energooszczędne. . Szczegółowy opis poszczególnych prac znajduje się w punkcie 4.1.3.2 studium wykonalności „Opis wybranych rozwiązań technologicznych.” Projekt ma charakter stacjonarny. Najważniejsze etapy realizacji projektu: 1. Opracowanie oraz przeprowadzenie postępowań o udzielenie zamówień publicznych. 2. Wykonanie prac budowlanych zgodnie z dokumentacją projektową, 3. Opracowanie i montaż materiałów demonstracyjnych, 4. Nadzór nad realizacją projektu, 5. Koordynowanie prac związanych z realizacją projektu, Prowadzenie dokumentacji projektowej, Prowadzenie rozliczeń finansowych, Prowadzenie promocji projektu. (Polish)
0 references
The project is a deep renovation of the culture centre building at ul. The military of the Polish Army (Polish Army) 54 in Połosni-Zdrój. The scope of the thermomodernisation work will be as follows: 1. The insulation of the walls of the basement and of the foundation walls, together with the associated works 2. The insulation of external walls, together with the associated works 3. Replacement of window frames with parappers and door frames. 4. Insulation of the basement of the basement, reconstruction of terrace and stage5. Insulation of the ceiling, roof, insulation of the rock. 6. Replacement of roof covering and associated works. 7. Thermal insulation of the floor on the ground in the economic room No 123. 8. The insulation of the floor on the ground, together with the accompanying works. 9. Meeting the ceramic floor in the corridor from the equalisation of the levels in the building, the gathering of a windmill and the flight curtain assembly, the insulation of the floor, the insulation of the floor, and the insulation of the anti-humidity isolation. 10. The collection of indoor wall coverings in connection with the renovation of the installation of electrical and electrical installations. 11. Replacement of service and accompanying equipment. 12. Replacement of internal lighting on energy-saving light points. THIS IS THE CASE. A detailed description of the different works can be found in point 4.1.3.2 of the feasibility study “Description of the selected technological solutions.” The project is stationary. The main steps in the implementation of the project are as follows: 1. The development and conduct of public procurement procedures. 2. Construction work performed according to project documentation, 3. Development and assembly of demonstration materials, 4. Supervising the implementation of the project, 5. Coordinating the work related to the implementation of the project, the carrying out of the project documentation, the carrying out of the financial accounts, the carrying out of the project promotion. (English)
0 references
Identifiers
RPZP.02.05.00-32-A027/16