Improving the accessibility of the Ełk sub-region through the upgrading of roads connecting to the TEN-T network (DK16): the Cologne Street, on the Street of Cologne (Q132703): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 2,600,371.8792 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
2,600,371.88 Euro
| |||||||||||||||
Property / EU contribution: 2,600,371.88 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 2,600,371.88 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 2,600,371.88 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 13:45, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the accessibility of the Ełk sub-region through the upgrading of roads connecting to the TEN-T network (DK16): the Cologne Street, on the Street of Cologne |
Project in Poland financed by DG Regio |
Statements
10,834,882.83 zloty
0 references
17,599,679.84 zloty
0 references
61.56 percent
0 references
1 September 2016
0 references
29 December 2017
0 references
GMINA MIASTO EŁK
0 references
Projekt obejmuje swym zakresem dwie inwestycje: przebud. ul. Suwalskiej na odcinku 0+000-1+647 km oraz przebud. ul. Kolonia na odcinku 0+373-1+430 km. Ul. Suwalska, m.in.: bud. nawierzchni jezdni, przebud. skrzyżowań w tym z ul. Łukasiewicza, przebud. chodników, bud. ścieżki rowerowej po obu stronach ulicy, bud. azylów dla pieszych (wysp środkowych), wykonanie zatok autobus. z peronami, przebud. zjazdów na sąsiadujące z ulicą działki, przebud. i bud. wpustów ulicznych i przykanalików, remont zasad. sieci kan. deszcz. oraz bud. odcinków nowej sieci z podłącz. do budowanych separatorów, bud. kanalizacji teletech., bud. linii oświetleniowej LED, przebud. sieci gaz. Ul. Kolonia, m.in.: bud. skrzyżowań z ul. Okulickiego (skanalizowane), z ul. B. Komorowskiego (rondo), z ul. Dobrzańskiego (skanalizowane), bud. kan. deszczowej wraz z podłącz. wpustów ulicz., wykonanie nawierzchni jezdni, bud. chodników, bud. ścieżki rower., bud. zjazdów, bud. zatoki parking., bud. zatok autobus., montaż wiat przyst., bud. oświetlenia ulicznego typu LED, przebudowa istniejącej sieci, bud. kan. sanit. S1i-S10. Zostanie wzmocniona nawierzchnia obu ulic w klasie nośności 100KN/oś. Obie ulice położone są mieście Ełk, czyli w rdzeniu Miejskiego Obszaru Funkcjonalnego Ełk. Ulica Kolonia zapewnia konieczne połączenie z siecią TEN-T (dk nr 16) przez istniejący węzeł zrealizowany w ramach budowy obwodnicy miasta Ełku. Natomiast ulica Suwalska łączy się z DK16 poprzez wcześniejszy fragment ciągu drogowego, który został już przebudowany w odpowiednim zakresie (ok. 0,509 km), ciąg ten jest ciągiem jednorodnym (ta sama droga lokalna o jednym numerze). Ul. Suwalska łączy się przez element punktowy (rondo) z siecią TEN-T (DK 16). Obie drogi wyprowadzają ruch w kierunku DK 16. Projekt obejmuje drogi lokalne z obszaru funkcjonalnego Ełku, wynikające ze Strategii ZIT. Realizacja projektu przyczynia się do poprawy bezpieczeństwa ruchu drogowego, w tym postulatów zawartych w NPBRD2013-2020. (Polish)
0 references
The project covers two investments: re. ul. On section 0 + 000-1 + 647 km and rebuilt. Cologne, section 0 + 373-1 + 430 km. UL. Suwalska, including: pavement surface, reconstruction, including street. Łukasiewicz, awakening., construction of the bicycle paths on both sides of the street, the construction of a bus to be constructed for pedestrians (mid-islands), the implementation of the bus. on the bus and the streets, on the streets, on the streets, on the streets, on the streets, on the roads, on the streets, on the roads, on the streets and on the roads, the reconstruction of the system and the construction of the sections of the new network connected to the built separators, the sewerage network, the construction of the LED lighting, the reconstruction of the gas network. UL. Cologne, including: construction of intersections at ul. Okuliecki, ul. B. Komorowski (roundabout), ul. Dobrzański (skonexamined), construction of the storm area with connection to the streets, construction of road pavement, construction of pavements, construction, construction, construction, construction, construction, construction, construction, construction of the bus. construction of a bus. construction of a shuttle bus. construction of a type of LED street lighting, reconstruction of the existing network, construction of the canton of savite. S1-S10. The road surfaces of both streets shall be reinforced in the load cell class of 100kN/axle. Both streets are located in the town of Ełk, the core of the Urban Operation Ełk. The Cologne Street provides the necessary connection to the TEN-T network (dk No 16) by the existing node in the bypass of the city of Ełk. On the other hand, the street is merged with DK16 by means of an earlier road passage which has already been upgraded to an appropriate extent (ca. 0.509 km), this sequence is a uniform line (the same local road with one number). UL. The superstructures are connected by the point (roundabout) element to the TEN-T network (DK 16). Both roads move towards DK 16. The project involves local roads from the functional area of Ełk, as a result of the ITI strategy. The project contributes to road safety, including the NPBRD2013-2020. (English)
0 references
Identifiers
RPWM.07.02.03-28-0001/16
0 references