Development of the municipal waste recovery and disposal facility in the city of Racibórz (Q124333): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 198,189.516 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
198,189.52 Euro
| |||||||||||||||
Property / EU contribution: 198,189.52 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 198,189.52 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 198,189.52 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 12:02, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the municipal waste recovery and disposal facility in the city of Racibórz |
Project in Poland financed by DG Regio |
Statements
825,789.65 zloty
0 references
971,517.27 zloty
0 references
85.0 percent
0 references
28 December 2016
0 references
31 October 2019
0 references
MIASTO RACIBÓRZ
0 references
Inwestycja obejmuje rozbudowę istniejącej kompostowni odpadów zielonych z obecnej przepustowości 3 700 Mg/rok do przepustowości 4 000 Mg/rok. W ramach inwestycji planowana jest zmiana lokalizacji istniejących obiektów infrastruktury technicznej, tj. kontenera socjalno – biurowego, wiaty magazynowej na sprzęt oraz boksów gotowego kompostu celem zwiększenia powierzchni dyspozycyjnej placu, na którym odbywa się kompostowanie odpadów. W związku z przeniesieniem ww. obiektów pomocniczych powierzchnia technologiczna placu zwiększy się o 465m2 tj. o 8% w stosunku do stanu istniejącego. Zmiana pozwoli na zwiększenie przepustowości kompostowni z 3 700 Mg/rok do 4 000 Mg/rok. W ramach przedsięwzięcia nie planuje się dobudowy powierzchni utwardzonej placu kompostowni. W ramach inwestycji planuje się również dobudowę boksu na gotowy kompost o powierzchni 60m2. Kompostownia odpadów stanowi element Zintegrowanego Centrum Przetwarzania Odpadów Komunalnych. (Polish)
0 references
The investment includes the extension of the existing green waste composting plant from the current capacity of 3 700 Mg/year to a capacity of 4 000 Mg/year. As part of the investment, it is planned to change the location of the existing infrastructure of the technical infrastructure, i.e. the office of social and office buildings, the storage of equipment and boxing of finished compost, in order to increase the available area of the site on which the composting of the waste takes place. With regard to the transfer of the above-mentioned subsidiary facilities, the technological area of the square will be increased by 465 m², i.e. by 8 % compared to the existing situation. The change will increase the capacity of the composting plant from 3 700 tonnes/year to 4 000 tonnes/year. The project does not plan a fixed surface area of a paved composting area. As part of the investment, the planned 60 m² compost will also be planned. Waste composting plants are part of the Integrated Municipal Waste Processing Centre. (English)
0 references
Identifiers
RPSL.05.02.02-24-089D/17
0 references