Installation of a photovoltaic microcircuit at the Clinical Specialist Hospital in Rzeszów (Q118586): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 93,189.23999999999 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
93,189.24 Euro
| |||||||||||||||
Property / EU contribution: 93,189.24 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 93,189.24 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / EU contribution: 93,189.24 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 10:45, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a photovoltaic microcircuit at the Clinical Specialist Hospital in Rzeszów |
Project in Poland financed by DG Regio |
Statements
388,288.5 zloty
0 references
456,810.0 zloty
0 references
85.0 percent
0 references
30 June 2017
0 references
30 November 2019
0 references
KLINICZNY SZPITAL SPECJALISTYCZNY NR 1 IM. FRYDERYKA CHOPINA W RZESZOWIE
0 references
Celem projektu jest zwiększenie ilości energii pozyskiwanej ze źródeł odnawialnych, poprawa jakości powietrza i ochrona środowiska. Zamontowane instalacje będą cechować się produkcją „czystej” energii elektrycznej z wykorzystaniem powszechnie dostępnego promieniowania słonecznego. Podczas pracy instalacji nie będą emitowane żadne rodzaje zanieczyszczeń w postaci gazów czy pyłów. Na budynkach Klinicznego Szpitala specjalistycznego Nr 1 im. Fryderyka Chopina w Rzeszowie zlokalizowane zostaną 3 odrębne instalacje PV. Do wewnętrznej sieci energetycznej zostaną przyłączone 3 instalacje typu on-grid. Instalacja nr 1 posadowiona będzie na dachu budynku A+BG, przy ul. Szopena 2 pełniącego funkcję udzielania świadczeń szpitalnych i zdrowotnych. Moc instalacji: 39,6 [kWp], posiadać będzie 132 moduły [300 Wp] i 2 falowniki (po 17,0 kW każdy). Produktywność instalacji wyniesie 36011,84 [kWh/rocznie]. Instalacja nr 2 posadowiona będzie na dachu budynku B, przy ul. Szopena 2, pełniącego funkcję udzielania świadczeń szpitalnych i zdrowotnych. Moc instalacji: 39,6 kWp, posiadać będzie 132 moduły [300 Wp] i 2 falowniki (po 17,0 kW każdy). Produktywność instalacji wyniesie 35559,61 [kWh/rocznie]. Instalacja nr 3 posadowiona będzie na dachu budynku przy ul. Rycerskiej, pełniącego funkcję udzielania świadczeń szpitalnych i zdrowotnych. Moc wynosić będzie 30,0 kWp, posiadać będzie 100 moduły [300 Wp] i 2 falowniki (12,5 i 15,0 kW). Produktywność instalacji wyniesie 27151,80 [kWh/rocznie]. Redukcja emisji CO2 projektu wyniesie 81,41 [ton/rok]. (Polish)
0 references
The project aims to increase the amount of renewable energy, improve air quality and protect the environment. The installed installations will be characterised by the production of “clean” electricity using publicly available solar radiation. During the installation, no pollutants shall be emitted in the form of gases or dusts. 1 separate PV installations will be located in the clinical buildings of the Clinical Hospital in Rzeszów. 3 separate PV installations will be located in Rzeszów. 3 on-the-grid installations will be connected to the internal energy network. Installation No 1 will be installed on the roof of the A + BG building, at ul. Sopena 2, who performs the function of providing hospital and health services. Installation capacity: 39,6 [kWp], will have 132 modules [300 Wp] and 2 inverters each (17.0 kW each). The capacity of the installation will be 36011,84 [kWh/a]. Installation No 2 on the roof of Building B will be located at ul. Sopena 2, serving the purpose of providing hospital and health services. Installation capacity: 39,6 kWp, will have 132 modules [300 Wp] and 2 inverters each (17.0 kW each). The capacity of the installation will be 35559,61 [kWh/a]. Installation No 3 on the roof of the building will be located at ul. A knights, playing the role of providing hospital and health services. The power will be 30,0 kWp, 100 modules [300 Wp] and 2 inverters (12,5 and 15.0 kW). The capacity of the installation will be 27151,80 [kWh/a]. The reduction in CO2 emissions of the project will be 81,41 [tonnes/year]. (English)
0 references
Identifiers
RPPK.03.01.00-18-0473/17
0 references