Project: traineeship (Q92493): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 239,289.8088 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
239,289.81 Euro
Amount239,289.81 Euro
UnitEuro
Property / EU contribution: 239,289.81 Euro / rank
 
Preferred rank
Property / EU contribution: 239,289.81 Euro / qualifier
 
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
Property / EU contribution: 239,289.81 Euro / qualifier
 
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:27, 23 September 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Project: traineeship
Project in Poland financed by DG Regio

    Statements

    0 references
    997,040.87 zloty
    0 references
    239,289.81 Euro
    13 January 2020
    0 references
    1,183,010.06 zloty
    0 references
    283,922.4144 Euro
    13 January 2020
    0 references
    84.28 percent
    0 references
    1 March 2017
    0 references
    28 February 2019
    0 references
    POLITECHNIKA KRAKOWSKA IM. TADEUSZA KOŚCIUSZKI
    0 references
    0 references
    Projekt ma na celu realizację wysokiej jakości programów stażowych w ramach podnoszenia kompetencji, uczestniczek/ów studiów stacjonarnych I i II stopnia na kierunku Inżynieria Materiałowa (IM) realizowanego na WM PK (KRYT. DOST. 1, 2, 3), odpowiadających potrzebom gospodarki, rynku pracy i społeczeństwa. PK posiada ocenę wyrożniającą PKA na kier. architektura (KRYT. PREM.3). Proj. jest dedykowany przede wszystkim dla osób nie posiadających doświadczenia zawod. Zostanie nim objętych min. 30% każdego przewidzianego w proj. rocznika Kier. IM. (KD11). W proj. założono równościowy sposób zarzadznia oraz równie proporcje udziału stud. wg płci (K i M,) a także dostęp do staży dla osób. z niepełnospr. Staże stanową działania dodatkowe w stosunku do toku studiów (KD9). W proj. zostały przewidziane 83 staże kraj. (74 staże) i zagr. (9 staży min. 10 %, KP2) w przedsięb. oraz innych instytucjach, w których mogą znaleźć w przyszłości zatrudnienie stud. IM m.in. instytuty badawcze (KP2), w tym w przedsięb. z którymi uczelnia prowadzi udokumentowaną współpracę od ponad roku (KP5). Staże będą powiązane bezpośrednio z efektami kształcenia przewidzianymi dla kierunku i będą one praktycznie wykorzystywane w toku zadań realizowanych na stażu (KD10) oraz będą zgodne z Zaleceniami Rady z dn. 10.03.2014 w sprawie jakości staży (2014/C88/01, KD12). W ramach proj. został przewidziany udział własny podmiotów w których będą realizowane staże w wys. min. 5% wartości działań dot. bezpośrednio stażu (KP6). Całość projektu została przewidziana na 2 lata (KD2). Wszystkie staże w proj. zostały przewidziane na okres 3 msc. i w wymiarze min. 120 godz. w msc. (KD5; KP1).  KRYT. DOST.: 1. pkt. 3.2, 4.3., 4.4 2.  4.3., 4.4 3. 4.3., 4.4 4. harmonogram 5. 3.4, 4.1. budżet 6. 4.3., 4.4, budżet 7. budżet 8. budżet 9. 3.2, 4.1., budżet 10.  3.4, 4.1 11. 3.2 12. 3.4, 4.1 13. nie dotycz (Polish)
    0 references
    The project aims at achieving a high quality of traineeship programmes within the framework of the upgrading of the competences, participatory courses I and II, to the area of material engineering (IM) carried out at the WM WM PK (lid).ADJ.1, 2, 3), responding to the needs of the economy, the labour market and society.The PK has an assessment of the architectural character of the architecture of the PKA (kryt).PREM.3).In particular, it is dedicated to people who do not have the experience of a star.It will be subject to a minimum of 30 % of anyone named in the carrier’s vintage year.IM (KD11).In the form of an entity, equality is assumed to be equal to, and equal to, the proportion of student participation by sex (K and M), as well as access to traineeships for persons with a disability.Traineeships additional to the course of studies (KD9).83 traineeships for the country have been allocated.(74 traineeships) and runs(9 traineeships at least 10 %, KP2) in the business community and other institutions likely to find jobs in the future.These include research institutes (KP2), including the undertaking with which the University has documented cooperation since more than a year (KP5).The traineeships will be linked directly to the learning outcomes foreseen for the course and will be practically used in the course of the traineeship assignments (KD10) and will be in line with the Council’s recommendations of10.03.2014 on the quality of traineeships (2014/C88/01, KD12).In the framework of the project, the own contribution of the entities in which the traineeship will be carried out will be set at 5 % of the value of the directly awarded activities (KP6).The whole project was planned for 2 years (KD2).All the job placements have been foreseen for 3 msc. and at a minimum of 120 h in msc.(KD5;KP1).CRYSTAL.DOST:1.para.3.2, 4.3, 4.4 2.4.3 AND 4.4 3.4.3., 4.4 4th schedule 5.3.4, 4.1th budget 6.4.3, 4.4, budget 7. budget 8. budget 9.3.2, 4.1, budget 10.3.4, 4.1 11.3.2 12.3.4, 4.1 13. not related to (English)
    0 references

    Identifiers

    POWR.03.01.00-00-S067/15
    0 references