Dry Boous in the cadastral district. Kojčice (Q58038): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 268,942.9872 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
268,942.99 Euro
Amount268,942.99 Euro
UnitEuro
Property / EU contribution: 268,942.99 Euro / rank
 
Preferred rank
Property / EU contribution: 268,942.99 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / EU contribution: 268,942.99 Euro / qualifier
 
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:30, 22 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Dry Boous in the cadastral district. Kojčice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    6,723,574.68 Czech koruna
    0 references
    268,942.99 Euro
    10 January 2020
    0 references
    7,910,087.87 Czech koruna
    0 references
    316,403.5148 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    23 February 2017
    0 references
    26 July 2018
    0 references
    31 August 2018
    0 references
    Obec Kojčice
    0 references
    0 references
    0 references

    49°28'37.09"N, 15°15'20.77"E
    0 references
    39409
    0 references
    Výstavba suché nádrže Boučí v obci Kojčice, okres Pelhřimov, k ochraně zástavby severní části obce před povodňovými průtoky vyvolanými soustředěnými odtokem povrchových vod z povodí nad obcí. Nádrž bude sloužit k transformaci povodňových průtoků Q100 3,9 m3/s na 0,32 m3/s, které budou svedeny zatravněným průlehem do strže a odtud dále do říčky Hejlovky u Prokopova mlýna. (Czech)
    0 references
    The construction of a dry reservoir of Bouz in Kojčice district, Pelhřimov district, to protect the northern part of the municipality from flooding caused by the concentrated flow of surface water from the river basin over the municipality. The tank will be used to transform the flood flows of Q100 3.9 m³/s to 0.32 m³/s, which will be connected with the grassy passage into a steep slope and from there to the Hejlovka River in Prokopova mill. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_034/0002238
    0 references