Dry Boous in the cadastral district. Kojčice (Q58038): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 268,942.9872 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 268,942.9872 Euro / rank | |||||||||||||||
Property / EU contribution: 268,942.9872 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 268,942.9872 Euro / qualifier | |||||||||||||||
|
Revision as of 20:30, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Dry Boous in the cadastral district. Kojčice |
Project in Czech Republic financed by DG Regio |
Statements
6,723,574.68 Czech koruna
0 references
7,910,087.87 Czech koruna
0 references
85.0 percent
0 references
23 February 2017
0 references
26 July 2018
0 references
31 August 2018
0 references
Obec Kojčice
0 references
39409
0 references
Výstavba suché nádrže Boučí v obci Kojčice, okres Pelhřimov, k ochraně zástavby severní části obce před povodňovými průtoky vyvolanými soustředěnými odtokem povrchových vod z povodí nad obcí. Nádrž bude sloužit k transformaci povodňových průtoků Q100 3,9 m3/s na 0,32 m3/s, které budou svedeny zatravněným průlehem do strže a odtud dále do říčky Hejlovky u Prokopova mlýna. (Czech)
0 references
The construction of a dry reservoir of Bouz in Kojčice district, Pelhřimov district, to protect the northern part of the municipality from flooding caused by the concentrated flow of surface water from the river basin over the municipality. The tank will be used to transform the flood flows of Q100 3.9 m³/s to 0.32 m³/s, which will be connected with the grassy passage into a steep slope and from there to the Hejlovka River in Prokopova mill. (English)
0 references
Identifiers
CZ.05.1.24/0.0/0.0/16_034/0002238
0 references