Ensuring the stability of the slope of the RD point of Č.p. 280 of the Halenkovice. (Q58035): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 72,922.656 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
72,922.66 Euro
| |||||||||||||||
Property / EU contribution: 72,922.66 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 72,922.66 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 72,922.66 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 20:30, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Ensuring the stability of the slope of the RD point of Č.p. 280 of the Halenkovice. |
Project in Czech Republic financed by DG Regio |
Statements
1,823,066.4 Czech koruna
0 references
2,144,784.0 Czech koruna
0 references
85 percent
0 references
1 November 2017
0 references
2 April 2019
0 references
31 March 2019
0 references
Obec Halenkovice
0 references
76363
0 references
Nově budovaná opěrná stěna podporovaná pilotami bude zajišťovat vykloněný svah se stávající deovanou opěrnou stěnou.Celková délka stěny je 26 m.Úhlová zeď je vysoká 3,8 m,šířka je 2,15 m,dřík je široký O,4 m.Průměr pilot je 600 mm,délka pilot je 6,0 m apiloty budou vrtány v osové vzdálenosti cca 1,25 m.Celkový počet pilot je 28 ks. (Czech)
0 references
The newly built back wall supported by pilots will be provided with a swollen slope with an existing veritable fleece of 26 m. the wall length is 3.8 m. the peak length is 4 m. the width is 2.15 m, the shank is wide 6.0 m. the length of the pilot is 600 m. the length of the pilot is approximately 1.25 m per plot. the total number of pilots is 28 units. (English)
0 references
Identifiers
CZ.05.1.24/0.0/0.0/16_034/0002129
0 references