Improvement of the energy performance of the buildings of the Frýdlant engineering plant — Rsl and son of a.s. (Q16452): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: EU contribution (P835): 320,645.856 euro)
Property / EU contribution
320,645.856 Euro
Amount320,645.856 Euro
UnitEuro
 
Property / EU contribution: 320,645.856 Euro / rank
Preferred rank
 
Property / EU contribution: 320,645.856 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / EU contribution: 320,645.856 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 18:57, 22 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy performance of the buildings of the Frýdlant engineering plant — Rsl and son of a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,016,146.4 Czech koruna
    0 references
    20,040,366.04 Czech koruna
    0 references
    801,614.6416 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    31 March 2021
    0 references
    Frýdlantské strojírny - Rasl a syn a.s.
    0 references
    0 references

    50°55'29.35"N, 15°5'36.96"E
    0 references
    46401
    0 references
    Předmětem projektu je provedení stavební úpravy obvodového pláště a energeticky úsporných opatření na obálce budovy, novou osvětlovací soustavu v hale bývalé kotelny a budovy údržby, novou teplovodní otopnou soustavu a instalaci fotovoltaické elektrárny na sedlové střechy. Investicí do snížení energetické náročnosti průmyslového objektu dojde ke snížení roční spotřeby energie o 2 871,72 GJ a emisí CO2 o 318,245 t/rok. a. (Czech)
    0 references
    The project concerns the construction of a building envelope and energy-saving measures on the envelope of the building, a new lighting system in the house of the former boiler room and the building maintenance building, a new water-based heating system and the installation of a photovoltaic power plant on the seat roof. Investments in reducing the energy intensity of an industrial site will reduce annual energy consumption by 2 871,72 GJ and CO2 emissions by 318.245 t/rok. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013815
    0 references