The bridge ev.163-024, for the Vyshmaford (Q74893): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 1,497,951.0356 euro)
(‎Changed an Item: Fixing rounding issue)
Property / EU contribution
 
1,497,951.04 Euro
Amount1,497,951.04 Euro
UnitEuro
Property / EU contribution: 1,497,951.04 Euro / rank
 
Preferred rank
Property / EU contribution: 1,497,951.04 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / EU contribution: 1,497,951.04 Euro / qualifier
 
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:15, 22 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The bridge ev.163-024, for the Vyshmaford
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    37,448,775.89 Czech koruna
    0 references
    1,497,951.04 Euro
    10 January 2020
    0 references
    44,057,383.41 Czech koruna
    0 references
    1,762,295.3364 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    16 May 2017
    0 references
    20 November 2017
    0 references
    31 December 2017
    0 references
    Správa a údržba silnic Jihočeského kraje
    0 references

    49°0'25.6"N, 14°29'18.2"E
    0 references
    37010
    0 references
    Obsahem projektu je z technického hlediska rekonstrukce mostu, kdy dojde k demolici stávajícího mostu, výstavbě nového ve stávající poloze, úpravě komunikace v předpolích mostu a úpravě koryta a břehů potoka v okolí mostu. Celková úprava komunikace je navržena v délce cca 189 m. (Czech)
    0 references
    The content of the project is from the technical point of view of the reconstruction of the bridge, when the existing bridge is being demolished, the construction of the new position in the current location, the modification of the communication in the prefixes of the bridge and the modification of the channel and the banks of the harness around the bridge. The overall layout of the communication is about 189 m. (English)
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001996
    0 references