Insulation of the College of Motiště Primary School (Q72274): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 34,943.536 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
34,943.54 Euro
| |||||||||||||||
Property / EU contribution: 34,943.54 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 34,943.54 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 34,943.54 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 07:17, 22 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation of the College of Motiště Primary School |
Project in Czech Republic financed by DG Regio |
Statements
873,588.4 Czech koruna
0 references
2,183,971.0 Czech koruna
0 references
40 percent
0 references
22 May 2017
0 references
4 September 2017
0 references
31 January 2019
0 references
Město Velké Meziříčí
0 references
59401
0 references
Předmětem projektu je realizace úspor energie v objektu mateřské školy v Mostišti - parc. č. 163, č.p. Mostiště 127, k.ú. Mostiště u Velkého Meziříčí (699853). Bude provedeno zateplení obvodových stěn, dále zateplení střešní konstrukce a v souladu s podmínkami OPŽP k realizaci systému nuceného větrání příslušných prostor uvedeného objektu a z konstrukčně stavebních důvodu též k výměně 2 stávajících oken. Komplexně bude dosaženo zlepšení tepelně-technických parametrů objektu. (Czech)
0 references
The subject of the project is the realisation of energy savings at the premises of the nursery school in the site — part No 163, No 127, in the cadastral district of the cadastral district of the cadastral district of the cadastral district. Mifti in Greater Meziříčí (699853). The insulation of the wall walls, the insulation of the roof structure and, in accordance with the conditions of the Environment Operational Programme, the operation of the system of forced ventilation of the relevant premises of that object and the construction of the system of forced ventilation are to be carried out, as well as the replacement of the 2 existing windows. The thermal input of the object will be improved in a comprehensive way. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001675
0 references