(A19_093_2016_0930060_1059) EFFICIENCY HOTEL HOTEL (Q2066486): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Arezzo / rank | |||
Normal rank |
Revision as of 05:09, 17 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930060_1059) EFFICIENCY HOTEL HOTEL |
Project in Italy financed by DG Regio |
Statements
17,163.17 Euro
0 references
34,326.34 Euro
0 references
50.0 percent
0 references
29 July 2016
0 references
29 July 2018
0 references
29 July 2018
0 references
HOTEL RISTORANTE GIARDINO DI AMOROSI EVA E C. S.N.C.
0 references
IL PROGETTO SI SVILUPPA SU UN FABBRICATO AD USO RICETTIVO CON ATTIVITA DI ALBERGO FIN DALLA SUA COSTRUZIONE NEGLI ANNI ?70 DEL SECOLO SCORSO. DALLA SUA COSTRUZIONE AD OGGI NESSUN INTERVENTO VOLTO A MIGLIORARE LE PRESTAZIONI ENERGETICHE DELL'EDIFICIO E STATO EFFETTUATO, PERTANTO SI E RESO NECESSARIO ADEGUARE LA STRUTTURA A STANDARD PIU MODERNI DI EFFICIENZA. L'INTERVENTO PER IL QUALE SI FA DOMANDA DI AIUTO SU QUESTO BANDO RIGUARDA 3 AZIONI DISTINTE: TETTO: IL MANTO DI COPERTURA E DEL TIPO TRAVETTI IN CA AD INTERASSE 90 CM, CON TABELLA DA 6 CM MARSIGLIESI IN COTTO. LE STRUTTURE PORTANTI SONO IN MISTO PIETRAME PER PRIMO PIANO, BOZZE DI TUTO PER IL PIANO SECONDO E LATERIZIO FORATO PER IL PIANO TERZO. VERRA EFFETTUATO UN INTERVENTO VOLTO ALLA COIBENTAZIONE DEL MANTO DI COPERTURA PER IL TETTO NON E STATO POSSIBILE AVERE UN PREVENTIVO PER L'INTERVENTO, NON SARA QUINDI RICHIESTO ALCUN CONTRIBUTO PER QUESTA AZIONE. INFISSI: GLI INFISSI AD OGGI SONO IN METALLO ALLUMINIO CON VETRO CAMERA, VERRANN (Italian)
0 references
THE PROJECT IS DEVELOPING ON A HOSPITALITY BUILDING WITH A HOTEL ACTIVITY SINCE IT WAS BUILT IN THE YEARS? 70 OF THE LAST CENTURY. SINCE ITS CONSTRUCTION TO DATE, NO ACTION HAS BEEN TAKEN TO IMPROVE THE ENERGY PERFORMANCE OF THE BUILDING AND THE STATE, SO IT HAS BECOME NECESSARY TO ADAPT THE STRUCTURE TO MORE MODERN EFFICIENCY STANDARDS. THE AID APPLICATION FOR THIS CALL FOR TENDERS CONCERNS 3 SEPARATE ACTIONS: ROOF: THE COVERING COVER AND THE TYPE OF COVER IN CA 90 CM WITH A DISTANCE BETWEEN 6 CM AND THE BAKED COVER. THE LOAD-BEARING STRUCTURES ARE IN THE FIRST FLOOR MIXED ROCK, WITH A COPY FOR THE SECOND AND A PHORATE PLANE FOR THE THIRD PLAN. AS THE ROOF COVERING THE ROOF COVERING THE ROOF AND THE STATE COULD NOT HAVE A PREVENTIVE MEASURE FOR THE OPERATION, THERE WILL BE NO INPUT FOR THIS ACTION. FRAMES: THE FIXTURES TO DATE ARE MADE OF ALUMINIUM METAL WITH GLASS OF THE CHAMBER, VERRANN (English)
0 references
Identifiers
D58I16002320009
0 references