(10360.14072017.115000044) TORRITA NURSERY SCHOOL (Q2056964): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Province of Florence / rank
 
Normal rank

Revision as of 03:23, 17 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000044) TORRITA NURSERY SCHOOL
Project in Italy financed by DG Regio

    Statements

    0 references
    83,149.14 Euro
    0 references
    279,464.67 Euro
    0 references
    29.75 percent
    0 references
    11 October 2017
    0 references
    29 March 2020
    0 references
    29 March 2020
    0 references
    COMUNE DI TORRITA DI SIENA
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO RIGUARDA UN UNICO EDIFICIO E PREVEDE LA REALIZZAZIONE DI N?3 LOTTI FUNZIONALI. IL 1? LOTTO RIGUARDA LA RISTRUTTURAZIONE DELLA CENTRALE TERMICA. GLI INTERVENTI SONO CONCENTRATI ALL?INTERNO DEL LOCALE ESISTENTE, IN CUI DOVRANNO ESSERE SVOLTE OPERAZIONI PRELIMINARI DI LAVAGGIO E DISINCROSTAZIONE RETE DI DISTRIBUZIONE, RIMOZIONE DELLA CALDAIA, DELLE POMPE DI CIRCOLAZIONE E DELLE TUBAZIONI INTERNE ALLA CENTRALE TERMICA. IL NUOVO GENERATORE DI CALORE ? COMPLETO DI PROPRIA CENTRALINA DI REGOLAZIONE, SONDA DI MANDATA, SONDA ESTERNA E NEUTRALIZZATORE DI CONDENSE, LA POMPA DI CIRCOLAZIONE PRIMARIO, LO SCAMBIATORE DI CALORE SALDO BRASATO E I COMPONENTI DI SICUREZZA INAIL. VIENE REALIZZATA ANCHE UNA NUOVA SCHERMATURA DI COLLEGAMENTO FRA GENERATORE ED IMPIANTO ESISTENTE, FRA QUESTI ULTIMI ? INTERPOSTO UNO SCAMBIATORE DI CALORE DEL TIPO SALDOBRASATO. LE TUBAZIONI INSTALLATE E QUELLE ESISTENTI VISIBILI SARANNO ADEGUATAMENTE COIBENTATE E PROTETTE CON RIVESTIMENTO IN PVC. E? PREVISTO UN NUO (Italian)
    0 references
    THE PROJECT COVERS A SINGLE BUILDING AND PROVIDES FOR THE IMPLEMENTATION OF N? 3 FUNCTIONAL BATCHES. 1? LOT CONCERNS THE RENOVATION OF THE THERMAL POWER PLANT. THE INTERVENTIONS ARE CONCENTRATED WITHIN THE EXISTING ROOM, WHERE PRELIMINARY WASHING AND SCOURING OPERATIONS MUST BE CARRIED OUT, REMOVAL OF THE BOILER, CIRCULATION PUMPS AND PIPES WITHIN THE THERMAL POWER STATION. THE NEW HEAT GENERATOR? COMPLETE OF ITS CONTROL UNIT FOR ADJUSTMENT CONTROL UNIT, DELIVERY PROBE, EXTERNAL PROBE AND CONTHICK NEUTRALISER, THE PRIMARY CIRCULATION PUMP, THE ELECTRIC BALANCE HEAT EXCHANGER, AS WELL AS THE INAIL SAFETY COMPONENTS. IS THERE ALSO A NEW BRIDGING SHIELD BETWEEN THE GENERATOR AND THE EXISTING PLANT, AMONG THEM? A HEAT EXCHANGER OF THE SALDOBRAATO TYPE. THE INSTALLED PIPES AND THE EXISTING PIPES VISIBLE WILL BE PROPERLY INSULATED AND PROTECTED WITH PVC COATING. AND? INTENDED FOR A NUO (English)
    0 references

    Identifiers