Thermal renovation of the Mokoody Hall building (Q109001): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Siedlecki / rank
 
Normal rank

Revision as of 16:57, 16 July 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal renovation of the Mokoody Hall building
Project in Poland financed by DG Regio

    Statements

    0 references
    288,349.94 zloty
    0 references
    69,203.9856 Euro
    13 January 2020
    0 references
    360,437.43 zloty
    0 references
    86,504.98 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    21 September 2015
    0 references
    30 October 2017
    0 references
    GMINA MOKOBODY
    0 references

    52°15'55.8"N, 22°6'44.6"E
    0 references
    Przedsięwzięcie polega na głębokiej termomodernizacji budynku użyteczności publicznej Urzędu Gminy Mokobody. W jego zakres wchodzi kompleksowe zastosowanie działań : - wymiana źródła ciepła na paliwo gazowe wraz z instalacją c.o., - montaż instalacji fotowoltaicznej, - docieplenie ścian zewnętrznych, - docieplenie stropodachu, - wymiana stolarki okiennej i drzwiowej, - wymiana oświetlenia na energooszczędne LED, W ramach projektu została opracowana dokumentacja projektowa wraz z audytem energetycznym. Po zakończeniu projektu zostanie przeprowadzony audyt energetyczny ex-post, który zweryfikuje osiągnięte wskaźniki. W ramach projektu zostanie wyłoniony inspektor nadzoru, oraz przeprowadzone działania promocyjne projektu. Inwestycja ma na celu poprawę efektywności energetycznej budynku o 83,01 %, będzie to miało bezpośredni, pozytywny wpływ na poprawę jakości powietrza i zmniejszenie emisji CO2 wytwarzanego przez budynek o 99,96 %. W projekcie zostanie zastosowane rozwiązanie techniczne w postaci zamontowanych ogniw fotowoltaicznych, pozwalających na wytworzenie energii elektrycznej z wykorzystaniem odnawialnej energii słonecznej. Moc urządzenia to 10 kW. W ramach zadania zostanie wymieniony kocioł węglowy na gazowy, na terenie Gminy nie istnieje sieć ciepłownicza więc takie rozwiązanie techniczne jest najbardziej korzystne dla projektu. W znacznym stopniu zostanie ograniczone wprowadzanie zanieczyszczeń do atmosfery. Efektywność kosztowa zmniejszenia zużycia energii w zrealizowanym projekcie została obliczona na poziom 3,97 zł/kWh/rok. Projekt jest zgodny z założeniami inwestycyjnymi uwzględnionymi w Planie Gospodarki Niskoemisyjnej dla Gminy Mokobody, który został pozytywnie zweryfikowany przez NFOŚiGW w Warszawie. Termomodernizowany budynek znajduje się na terenie gminy wiejskiej. (Polish)
    0 references
    The project involves deep thermal renovation of the public building office of the municipality of Mookobody. Its scope includes a comprehensive application of actions: — the replacement of the heat for gaseous fuel with the installation of a c.o. installation — installation of a photovoltaic installation — insulation of external walls, — insulation of the roof, — replacement of window and door frames, — replacement of lighting on energy-efficient LED, design documentation was prepared for design with energy audit. Once the project is completed, an ex-post energy audit will be carried out to verify the performance of the indicators. Within the framework of the project, the selected surveillance inspector will be selected and the promotional activities carried out. The investment aims at improving the energy efficiency of the building by 83.01 %, this will have a direct positive impact on improving air quality and reducing the CO2 emissions generated by the building by 99.96 %. The project will put in place a technical solution in the form of installed photovoltaic cells to generate electricity using renewable solar energy. The power of the device is 10 kW. As part of the task, a coal boiler will be replaced by a gas-fired boiler in the municipality which does not exist in the district heating network so that this technical solution is the most advantageous for the project. To a large extent, the introduction of pollution into the atmosphere will be reduced. The cost efficiency of reducing energy consumption in the completed project was calculated at PLN 3,97/kWh/year. The project is in line with the investment assumptions taken into account in the Low Carbon Economy Plan for the Municipality of Mokobody, which was positively assessed by the National Fund for Environmental Protection and Water Management (NFOŚiGW) in Warsaw. The renovated building is located in the village of the rural municipality. (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-5322/16
    0 references