ENERGY AUDIT FOR ELEMENTARY SCHOOL THAT IS ELEMENTARY SCHOOL (MUNICIPALITY OF FABRICA IN ROME) (Q2035212): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Viterbo / rank | |||
Normal rank |
Revision as of 11:22, 16 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY AUDIT FOR ELEMENTARY SCHOOL THAT IS ELEMENTARY SCHOOL (MUNICIPALITY OF FABRICA IN ROME) |
Project in Italy financed by DG Regio |
Statements
130,395.0 Euro
0 references
260,790.0 Euro
0 references
50.0 percent
0 references
21 November 2016
0 references
31 December 2019
0 references
REGIONE LAZIO
0 references
SOSTITUZIONE DELLA CALDAIA, INSTALLAZIONE DI TESTE TERMOSTATICHE, SOSTITUZIONE DEI CORPI ILLUMINANTI, REALIZZAZIONE ISOLAMENTO TERMICO, SOSTITUZIONE INFISSI, INSTALLAZIONE SISTEMA MISURAZIONE E VISUALIZZAZIONE DEI CONSUMI (Italian)
0 references
REPLACEMENT OF THE BOILER, INSTALLATION OF THERMOSTATICALLY CONTROLLED HEADS, REPLACEMENT OF LIGHTING, THERMAL INSULATION, WINDOW FRAMES, INSTALLATION SYSTEM MEASUREMENT AND DISPLAY (English)
0 references
Identifiers
F92B17000120006
0 references