SCHOOL ON LINEE_665 (Q1869541): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Ancona / rank | |||
Normal rank |
Revision as of 22:32, 15 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | SCHOOL ON LINEE_665 |
Project in Italy financed by DG Regio |
Statements
18,500.0 Euro
0 references
18,500.0 Euro
0 references
100.0 percent
0 references
9 February 2016
0 references
26 September 2016
0 references
11 November 2016
0 references
FABRIANO "F. IMONDI ROMAGNOLI"
0 references
IL PROGETTO PREVEDE LA CONNESSIONE DI TRE EDIFICI SCOLASTICI CHE OSPITANO COMPLESSIVAMENTE DUE SCUOLE DELLINFANZIA DUE SCUOLE PRIMARIE UNA SCUOLA SECONDARIA DI I GRADO E GLI UFFICI DI PRESIDENZA E SEGRETERIA PLESSO GENTILE DA FABRIANO SCUOLA SECONDARIA GENTILE DA FABRIANO UFFICI DI SEGRETERIA E PRESIDENZA PLESSO ALLEGRETTO DI NUZIO SCUOLA DELLINFANZIA ANNA MALFAIERA E SCUOLA PRIMARIA ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI SCUOLA DELLINFANZIA PLE MILIANI E SCUOLA PRIMARIA CARLO COLLODI (Italian)
0 references
THE PROJECT WILL CONNECT THREE SCHOOL BUILDINGS TOGETHER WITH TWO PRIMARY SCHOOLS DELLINFANZIA, TWO PRIMARY SCHOOLS, A SECONDARY SCHOOL OF THE GRADE, THE BUREAUX AND THE SECRETARIAT, WHICH WILL BE ATTACHED TO IT BY FABRIANO SECONDARY SCHOOL FROM FABRIANO SECONDARY SCHOOL, ATTACHED TO THE NUZIO SCHOOLS DELLINFANZIA ANNA MALFAIERA AND THE PRIMARY SCHOOL ATTACHED TO A NUMBER OF SCHOOLS OF DELLINFAIZIA SCHOOL IN THE MILIANI, AND THE PRIMARY SCHOOL CARLO COLLODI (English)
0 references
Identifiers
J96J15000660007
0 references