ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1” (Q2052472): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Province of Sassari / rank
 
Normal rank

Revision as of 18:59, 14 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1”
Project in Italy financed by DG Regio

    Statements

    0 references
    1,694,355.0 Euro
    0 references
    3,388,710.0 Euro
    0 references
    50.0 percent
    0 references
    1 March 2014
    0 references
    17 November 2020
    0 references
    ENTE DI GOVERNO DELL'AMBITO DELLA SARDEGNA
    0 references
    0 references
    0 references

    40°43'23.74"N, 8°33'39.64"E
    0 references
    ESECUZIONE DI TUTTI I LAVORI E FORNITURE NECESSARIE PER L¿INTERVENTO DI "PROGRAMMAZIONE DELIBERA CIPE N° 27/2015 - EFFICIENTAMENTO DELLE RETI DI DISTRIBUZIONE IDRICA E RIFACIMENTO ALLACCI NELLA ZONA OPERATIVA 6.1 - COMUNE DI SASSARI". LE OPERE SOMMARIAMENTE POSSONO RIASSUMERSI IN: - ESECUZIONE DELLO SCAVO, POSA IN OPERA DI TUBAZIONE IN G.S. DIAMETRO 300 MM. PER ML. 1.562,51 CON COLLEGAMENTO ALLE CONDOTTE ESISTENTI CON FORNITURA E POSA IN OPERA DI APPARECCHIATURE IDRAULICHE; O REALIZZAZIONE DEL RISANAMENTO DELLA CONDOTTA IN ACCIAIO ALL¿INTERNO DELL¿ATTRAVERSAMENTO FERROVIARIO DI VIA VITTORIO BELLINI CON METODO NON DISTRUTTIVO C.I.P.P. O ESECUZIONE DI ALLACCI ALLE UTENZE IN N° 309; O ESECUZIONE DI DEMOLIZIONE E RIPRISTINO DI PAVIMENTAZIONI STRADALI; O REALIZZAZIONE DELLA GEOREFERENZIAZIONE DELLE OPERE; O LA FORMA E LE DIMENSIONI DELLE OPERE RISULTANO DAL SUCCITATO PROGETTO APPROVATO (Italian)
    0 references
    COMPLETION OF ALL THE WORKS AND SUPPLIES NEEDED FOR THE “PROGRAMMING OF CIPE DECISION NO 27/2015 — THE EFFICIENCY OF THE WATER DISTRIBUTION NETWORKS AND THE RENOVATION OF THE SHOPS IN THE 6.1 OPERATIONAL ZONE — MUNICIPALITY OF SASSARI”. THE FOLLOWING CAN BE SUMMARISED AS FOLLOWS: — EXECUTION OF THE EXCAVATION, PLACING OF PIPES IN G.S. DIAMETER 300 MM. PER ML. 1.562,51 LINKING THE EXISTING PIPELINES TO SUPPLY AND INSTALLATION OF HYDRAULIC EQUIPMENT; OR UNDERTAKING THE REORGANISATION OF THE STEEL LINE DIVISION OF THE PASSAGEWAY BETWEEN VITTORIO BELLINI WITH THE NON-DESTRUCTIVE METHOD OR THE EXECUTION OF ENCLOSURES TO USERS IN N° 309; OR CARRYING OUT DEMOLITION AND REHABILITATION OF ROAD PAVEMENTS; OR THE LOCATION OF GEOREFERENCING THE WORKS; OR THE SHAPE AND SIZE OF THE WORKS RESULT FROM THE APPROVED DESIGN REFERRED TO ABOVE. (English)
    0 references

    Identifiers