Creation of a trunk route around jez. Sczuze, in addition to active tourism in the city and municipality of Golczewo (Q137995): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 791,808.8 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 190,034.112 Euro / rank | |||||||||||||||
Property / budget: 190,034.112 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 190,034.112 Euro / qualifier | |||||||||||||||
|
Revision as of 00:22, 23 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of a trunk route around jez. Sczuze, in addition to active tourism in the city and municipality of Golczewo |
Project in Poland financed by DG Regio |
Statements
269,029.87 zloty
0 references
65.26 percent
0 references
11 May 2017
0 references
28 July 2017
0 references
GMINA GOLCZEWO
0 references
Przedmiotowy projekt wpisuje się swoim charakterem w literę b) katalogu. Realizacja projektu dotyczy zagospodarowania terenu na wodach Jeziora Szczucze w Golczewie dla celów rekreacyjno– turystycznych. Inwestycje składające się na całokształt projektu zlokalizowane są w trzech miejscach. W ramach projektu planuje się (działki znajdują się w obrębie nr 5): 1.Na działce 383/6 – wyposażenie lokalizacji w obiekty małej architektury, w postaci: słupków do cumowania kajaków, ławo-stołu i śmietnika. Planuje się także postawienie tablicy informacyjno-promocyjnej, dowiezienie ziemi, niwelację terenu oraz zasianie trawy na przedmiotowej działce. 2.Na działce 383/1– wyposażenie lokalizacji w obiekty małej architektury, w postaci: słupków do cumowania kajaków, 3 ławo-stołów, 4 śmietników, tablicy informacyjno-promocyjnej, dowiezienie ziemi, niwelację terenu, zasianie trawy, a także utworzenia miejsca na ognisko. 3.Na działkach 383/4 oraz 304 - rozebranie dwóch istniejących pomostów i montażu dwóch nowych pomostów na jeziorze Szczucze w Golczewie. Planuje się budowę: •pomostu rekreacyjno - cumowniczego, pływającego w systemie modułowym wraz z wyposażeniem dodatkowym, •pomostu do cumowania sprzętu pływającego, w systemie modułowym wraz z wyposażeniem dodatkowym; Dodatkowo na działce 304 planuje się: -Dowiezienie ziemi (czarnoziemu), niwelację terenu oraz zasianie trawy, -Renowację fontanny, -Postawienie 4 śmietników, -Postawienie 4 ławo-stołów, -Wykonanie miejsca na ognisko, -Postawienie 2 lamp LED-owych, -Montaż słupków do gry w siatkówkę wraz z montażem siatki, -Postawienie dwóch tablic informacyjno-promocyjnych. Bezpośrednio po zakończeniu realizacji projektu możliwe będzie wykorzystanie pełnej funkcjonalności powstałej infrastruktury. Nie są wymagane dodatkowe działania celem jego pełnego wykorzystania. Wnioskodawca na zapewnione zasoby kadrowe, techniczne oraz wiedzę, które gwarantują uruchomienie infrastruktury po zakończeniu projektu. (Polish)
0 references
The project concerned is made up of its nature in letter (b) of the catalogue. The project concerns the management of a site in the waters of Lake Szcze in Golczew for leisure and leisure purposes. The investments made up of the total project are located in three locations. The project plans (parcels are located within No 5): 1.In parcel 383/6, location equipment for street furniture, in the form of: mooring, benches and crewing bars. The use of an information and promotional plaque is also planned, the ground will be brought to the ground, the land is close and the grass is sown on the parcel. 2.In parcel 383/1, location equipment for street furniture, in the form of: the moorings of the canoes, 3 benches, 4 cream, the information and promotional board, the removal of the ground, the abandonment of the grass and the creation of a place for the outbreak. 3.In parcels 383/4 and 304, the two existing bridges and the installation of two new bridges on the Szcze lake in Golzew. It is planned to build: • a leisure/mooring platform operating in a modular system with additional equipment,• a platform for the mooring of floating equipment, in a modular system, together with supplementary equipment; In addition, on plot 304 it is planned to: Bringing the ground (Montenegro) to the ground, levelling the land and feeding the grass, -Renovny fontanny, -Postavadan 4 cream, -awaken 4 benches -benches, -implementation of a place for the outbreak, -Postavat 2 LED-lights, -Installation of the volleyball pillars together with the grid installation, -Postawking two tables for information and promotion. Immediately after completion of the project, it will be possible to make use of the full functionality of the existing infrastructure. No additional action is required to make full use of it. The applicant for the human, technical and knowledge resources provided to ensure the deployment of the infrastructure at the end of the project. (English)
0 references
Identifiers
RPZP.04.09.00-32-0031/16
0 references