RES investment in MEBELMAX (Q132101): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 262,396.0 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 62,975.04 Euro / rank | |||||||||||||||
Property / budget: 62,975.04 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 62,975.04 Euro / qualifier | |||||||||||||||
|
Revision as of 23:12, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES investment in MEBELMAX |
Project in Poland financed by DG Regio |
Statements
181,330.57 zloty
0 references
85.0 percent
0 references
26 September 2016
0 references
31 October 2018
0 references
MEBELMAX - MIECZYSŁAW JASIŃSKI
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w infrastrukturze zakładu produkcyjnego w miejscowości Barcikowo gmina Dobre Miasto. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp (składający się z 125 szt. modułów monokrystalicznych o mocy jednostkowej 320W), podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektr. niskiego napięcia. Całość instalacji będzie posadowiona na dachu budynku produkcyjnego i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Sposób wdrażania: -postępowanie konk. i podpisanie umowy -montaż instalacji -odbiór instalacji -rozliczenie - f-ra końcowa, prot. potw. wskaźniki Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energet. regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane ze zużyciem energii. (Polish)
0 references
The applicant plans to carry out an investment consisting of installing photovoltaic panels in the infrastructure of the production plant in Barcikowo of Dobre Miasto. A photovoltaic system with a nominal output of 40 kWp is foreseen (consisting of 125 unit units of mono-crystalline modules with a unit capacity of 320W), which is connected to the distribution network directly to the three-phase grid of low voltage electrical supply. The entire installation will be placed on the roof of the building building and will be an integral part of the facility, defined as an installation. The grid connection is based on the notification to the relevant network operator in this case of Energa Operator. According to the law, the connection of micro-PV installations to the network and including 40 kWp is an obligation of each operator and does not require a building permit. The phases of the implementation of the project:— to make a request for the signing of a contract for the award of a contract to be signed in accordance with the principle of competitiveness — selecting the contractor in accordance with the principle of competitiveness — concluding the contract with the contractor and starting work — carrying out the works in accordance with the planned timetable — Completion of the project and signature of the final protocol — final statement of the project for implementation: The purpose of the project is to follow the assumptions made in the SzOOP RPOWiM in pursuing the objective pursued:Increased RES share in the region’s overall energy balance.The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix.The region.This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of local renewable energy sources?The costs associated with energy consumption will be reduced as a result of the investment. (English)
0 references
Identifiers
RPWM.04.01.00-28-0563/16
0 references