Thermo-modernisation of public utilities in the municipality of Dębe Wielkie (Q109034): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 3,707,915.51 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 889,899.7224 Euro / rank | |||||||||||||||
Property / budget: 889,899.7224 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 889,899.7224 Euro / qualifier | |||||||||||||||
|
Revision as of 19:09, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermo-modernisation of public utilities in the municipality of Dębe Wielkie |
Project in Poland financed by DG Regio |
Statements
2,922,206.16 zloty
0 references
80.0 percent
0 references
5 January 2015
0 references
30 September 2017
0 references
GMINA DĘBE WIELKIE
0 references
Projekt jest zlokalizowany w Gminie Dębe Wielkie, w powiecie mińskim, w województwie mazowieckim. Projekt zakłada wykonanie termomodernizacji ośmiu budynków użyteczności publicznej należących do Gminy Dębe Wielkie (tylko 5 kwalifikuje się do dofinansowania). Budynki te tworzą 5 kompleksów, w skład których wchodzą następujące obiekty w 4 miejscowościach Gminy: • budynek Gimnazjum z budynkiem Szkoły Podstawowej w miejscowości Dębe Wielkie, • budynek Szkoły Podstawowej oraz Domu Nauczyciela w Górkach, • budynek Szkoły Podstawowej oraz Domu Nauczyciela w Rudzie, • budynek Urzędu Gminy w miejscowości Dębe Wielkie, • budynek Szkoły Podstawowej w Cygance. Termomodernizacja domów nauczyciela nie jest objęta dofinansowaniem w ramach działania 4.2. RPO WM 2014-2020 z uwagi na mieszkalny charakter tych obiektów. Termomodernizacja Szkoły Podstawowej w Cygance nie jest objęta dofinansowaniem w ramach działania 4.2. RPO WM 2014-2020 z uwagi na brak spełnienia minimalnych wymagań redukcji zużycia energii w ramach prowadzonej termomodernizacji. W pozostałych obiektach w wyniku analizy wykonalności zidentyfikowano m.in. następujące możliwe do zastosowania rozwiązania inwestycyjne: • wymiana instalacji co (obejmująca m.in. montaż zaworów termostatycznych, wymianę części grzejników i montaż systemu zarządzania energią), • wymiana okien, • wymiana drzwi wejściowych, • ocieplenie ścian zewnętrznych, • ocieplenie stropów pod poddaszami i stropodachów, • modernizacja części źródeł ciepła (również z wykorzystaniem OZE. Projekt zakłada montaż kotła na biomasę, jako źródło ciepła dla szkoły w Rudzie. Kocioł ten zastąpi kocioł na węgiel). W wyniku realizacji ww. działań zostaną osiągnięte następujące kryteria: 1/ Stopień poprawy efektywności energetycznej: 34,36-69,08%, 2/ Podwyższenie standardu energetycznego budynku, wyrażone wskaźnikiem EPh + w: 103,4 kWh/(m2rok), 3/ Efektywność kosztowa zmniejszenia zużycia energii: 3,30 zł/ kWh/rok, 4/ Stopień redukcji CO2: 63, (Polish)
0 references
The project is located in the municipality of Dębe Wielkie, in the county of Minsk, in Mazowieckie Province. The project involves the thermal modernisation of eight public buildings belonging to the municipality of Dębe Wielkie (only 5 are eligible for funding). These buildings form 5 complexes, which include the following sites in the 4 municipalities of the municipality: • Building the overhead school building in Dębe Wielkie,• building of the Primary School and Upper Teachers’ House,• building of the Primary School and of the Upper House of Teachers in Ruda,• Building of the Municipal Office in Dębe Wielkie,• Building the Primary School in Cycles. The thermal renovation of the teacher’s homes is not covered by the grant under Action 4.2. ROP MP 2014-2020 in view of the residential nature of these plants. The thermal modernisation of the Primary School in Cyclance is not funded under Measure 4.2. ROP MP 2014-2020, in view of the failure to meet the minimum requirements for reducing energy consumption in the framework of energy renovation. In other sites, the feasibility study identified among others the following possible investment solutions: • the replacement of the installation (including the installation of thermostatic valves, replacement of parts of radiators and installation of the energy management system),• the replacement of windows,• the replacement of the input door, the insulation of the external walls, the insulation of the ceilings and the ceiling of the roof,• the modernisation of part of the heat generator (also using RES. The project involves the installation of a biomass boiler as a heat generator for the school in Ruda. This boiler will be replaced by a coal boiler). As a result of the implementation of the above actions, the following criteria will be met: 1/Stopień on improving energy efficiency: 34,36-69.08 %, 2/Podwyższenie of the energy standard of the building, expressed by the EPH + in: 103.4 kWh/(m2year), 3/Efektywność cost reduction cost: PLN 3,30/kWh/year, 4/Stopień CO2 reduction: 63 (English)
0 references
Identifiers
RPMA.04.02.00-14-5368/16
0 references