CONSTRUCTION OF UL. NOWEAR FOR OC. UL. TOP TO UL. KOPCIŃSKI, WITH AN EXTENSION TO THE INTERSECTION WITH UL. KOPCIŃSKIEGO (Q101716): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item) |
||||||||||||||
Property / budget | |||||||||||||||
14,569,252.04 zloty
| |||||||||||||||
Property / budget: 14,569,252.04 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
3,496,620.49 Euro
| |||||||||||||||
Property / budget: 3,496,620.49 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 3,496,620.49 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 3,496,620.49 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 17:18, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION OF UL. NOWEAR FOR OC. UL. TOP TO UL. KOPCIŃSKI, WITH AN EXTENSION TO THE INTERSECTION WITH UL. KOPCIŃSKIEGO |
Project in Poland financed by DG Regio |
Statements
12,383,864.23 zloty
0 references
14,569,252.04 zloty
0 references
85.0 percent
0 references
26 November 2014
0 references
30 June 2019
0 references
MIASTO ŁÓDŹ
0 references
INWESTYCJA OBEJMUJE M.IN.: BUDOWA NAWIERZCHNI UL. NOWOWĘGLOWEJ NA ODC. OD UL.WIERZBOWEJ DO UL.KOPCIŃSKIEGO, ROZBUDOWA SKRZYŻOWANIA UL. NOWOWĘGLOWEJ Z UL.KOPCIŃSKIEGO (SKRZYŻOWANIE 2 POZIOMOWE), OBEJMUJĄCA:BUDOWĘ ŁĄCZNICY PÓŁNOCNEJ,BUDOWĘ ŁĄCZNIKA,PRZEBUDOWĘ UL. WYDAWNICZEJ, STANOWIĄCEJ ŁĄCZNICE POŁUDNIOWĄ SKRZYŻOWANIA,PRZEBUDOWĘ UL.TUWIMA, W TYM ZMIANĘ JEJ PRZEBIEGU W SĄSIEDZTWIE PĘTLI AUTOBUSOWEJ, PRZEBUDOWĘ PĘTLI AUTOBUSOWEJ. W RAMACH WW ODCINKÓW ZREALIZOWANE ZOSTANĄ M.IN. NASTĘPUJĄCE RODZAJE ROBÓT: WYKONANIE NOWYCH NAWIERZCHNI JEZDNI Z MIESZANEK MINERALNO-ASFALTOWYCH WYKONANIE PRZEBUDOWY ISTNIEJĄCYCH NAWIERZCHNI MONTAŻ OBRAMOWAŃ JEZDNI, CHODNIKÓW, ŚCIEŻEK ROWEROWYCH, OPASEK, ZJAZDÓW, ZATOK WYKONANIE NAWIERZCHNI ZJAZDÓW INDYWIDUALNYCH WYKONANIE NAWIERZCHNI ZJAZDÓW PUBLICZNYCH WYKONANIE NAWIERZCHNI CHODNIKÓW Z PŁYTEK BETONOWYCH I KOSTKI KAMIENNEJ WYKONANIE NAWIERZCHNI ŚCIEŻEK ROWEROWYCH I CIĄGÓW PIESZO-ROWEROWYCH WYKONANIE OPASEK JEZDNI WYKONANIE ZATOK / STANOWISK AUTOBUSOWYCH WYKONANIE NAWIERZCHNI PARKINGU Z KOSTKI BETONOWEJ / MIESZANKI MINERALNO-ASFALTOWEJ MONTAŻ NAWIERZCHNI SYGNALIZACYJNYCH DLA OSÓB NIEDOWIDZĄCYCH MONTAŻ BARIER, WYGRODZEŃ I OGRODZEŃ BUDOWA SIECI KANALIZACJI DESZCZOWEJ PRZEBUDOWA SIECI WODOCIĄGOWEJ I GAZOWEJ BUDOWA OŚWIETLENIA ULICZNEGO BUDOWA SYGNALIZACJI ŚWIETLNEJ WRAZ Z ZASILANIEM NASADZENIA ZIELENI WZDŁUŻ PASA DROGOWEGO NOWO PROJEKTOWANEJ UL. NOWOWEGLOWEJ ORAZ PRZEBUDOWYWANYCH ULIC TUWIMA, WYDAWNICZEJ ORAZ ŁĄCZNIKA KOPCIŃSKIEGO – WYDAWNICZA. GRUPY DOCELOWE: UŻYTKOWNICY INFRASTRUKTURY DROGOWEJ ZADANIA: 1) PROJEKT 2) ROBOTY BUDOWLANE 3) INŻYNIER KONTRAKTU 4) INFORMACJA I PROMOCJA 5) WYKUP GRUNTÓW CEL PODSTAWOWY:LEPSZA DOSTĘPNOŚĆ TRANSPORTOWA WOJEWÓDZTWA W RUCHU DROGOWYM, ZAPEWNIENIE BEZPOŚREDNIEGO POŁĄCZENIA DROGOWEGO DO DWORCA ŁÓDŹ FABRYCZNA BĘDĄCEGO ELEMENTEM PUNKTOWYM SIECI TEN-T, POPRAWA BEZPIECZEŃSTWA, JAKOŚCI SIECI DROGOWEJ I JEJ PRZEPUSTOWOŚCI. (Polish)
0 references
THE INVESTMENT SHALL INCLUDE THE FOLLOWING: PAVEMENT CONSTRUCTION UL. TO THE NOWEAR. FROM UL.ANIMAL TO UL.KOPCIŃSKI, EXTENSION OF UL. UL. A NOWEAR, WITH UL.KOPCIŃSKI (2 LEVEL INTERSECTION), INCLUDING THE CONSTRUCTION OF A NORTH LINK, THE CONSTRUCTION OF A LINK, THE RECONSTRUCTION OF UL. PUBLISHING, CONSISTING OF SOUTH PAIR CROSSINGS, RECONSTRUCTION OF THE UL.TUWIMA, INCLUDING A CHANGE IN ITS EVOLUTION IN THE VICINITY OF THE BUS NETWORK, UPGRADING THE BUS LOOP. IN THE FRAMEWORK OF THESE SECTIONS, M.INIS WILL BE IMPLEMENTED. THE FOLLOWING TYPES OF WORKS: CONSTRUCTION OF THE NEW PAVEMENT OF A MINERAL/BITUMEN MIXTURE TO REBUILD THE EXISTING PAVEMENT, PAVING FRAMES, PATHS, CYCLE PATHS, WALKING STICKS, EXITS, THE SINUSES OF THE PAVEMENT OF THE PAVEMENT OF CONCRETE PAVEMENT PATHS FROM CONCRETE PLATE PATHS AND STONE PATHS FOR THE ROAD PAVEMENT OF BICYCLE PATHS AND A SLOPE OF A ROAD PARKING AREA, CONSTRUCTION OF A ROAD AREA WITH A STONE/MINERAL/BITUMEN AREA FOR THE VISUALLY IMPAIRED INSTALLATION OF BARRIERS, FENCING AND FENCING THE CONSTRUCTION OF A SEWAGE SYSTEM FOR THE CONSTRUCTION OF A MAINS AND GAS DRAINAGE SYSTEM FOR THE CONSTRUCTION OF A ROAD LIGHTING NETWORK ALONG A ROAD LANE WITH A NEWLY PROPOSED UL. TO THE NEW STREET AND THE STREETS OF TUWIMA, THE PUBLISHING HOUSE AND THE JUNCTION OF COPCIŃSKI, PUBLISHING. THE TARGET GROUPS: ROAD USERS OF THE ROAD INFRASTRUCTURE: (1) PROJECT 2) CONSTRUCTION WORK 3) CONTRACT ENGINEER 4) INFORMATION AND PROMOTION 5) LAND PURCHASE PRIMARY OBJECTIVE: BETTER TRANSPORT ACCESSIBILITY OF THE VOIVODESHIP IN ROAD TRAFFIC, PROVISION OF A DIRECT ROAD LINK TO THE FABRYCZNA BOAT COMPONENT OF THE TEN-T NETWORK, IMPROVING SAFETY, THE QUALITY OF THE ROAD NETWORK AND ITS CAPACITY. (English)
0 references
Identifiers
RPLD.03.02.02-10-0018/15
0 references