Improving the energy efficiency of PHU IR-MAR s.c (Q132206): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2538032 / rank
 
Normal rank

Revision as of 23:01, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of PHU IR-MAR s.c
Project in Poland financed by DG Regio

    Statements

    0 references
    532,957.11 zloty
    0 references
    127,909.7064 Euro
    13 January 2020
    0 references
    771,220.28 zloty
    0 references
    185,092.8672 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 June 2018
    0 references
    31 March 2020
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO USŁUGOWE IR-MAR S.C
    0 references
    0 references

    54°4'56.6"N, 21°21'54.7"E
    0 references
    Głównym celem projektu pt. „Poprawa efektywności energetycznej przedsiębiorstwa PHU IR-MAR s.c" jest osiągnięcie jak najlepszych parametrów środowiskowych. Polska jako kraj członkowski UE jest zobligowana do dążenia osiągnięcia jak najlepszych parametrów środowiskowych (zmniejszenia emisji gazów cieplarnianych, pyłów zawieszonych, ograniczenia zużycia surowców naturalnych). Dlatego istotną rzeczą jest już dziś podjęcie działań zapobiegawczych. W projekcie uwzględniono następujący zakres prac modernizacyjnych: • modernizacja instalacji CO wraz z wymianą źródła ciepła • modernizacja instalacji CWU, • modernizacja instalacji oświetlenia, • modernizacja systemu wentylacji • wymiana pieca konwekcyjno-parowego • modernizacja instalacji elektroenergetycznej (montaż paneli fotowoltaicznych o mocy 27,06 kW). Projekt wpisuje się w założenia określonej w SzOOP RPO WiM dla 4. Osi Priorytetowej: - Wskaźnik wykorzystania energii odnawialnej – 95,92 %, - Zwiększona efektywność energetyczna – 60,09%, - Redukcja CO2 – 91,48%, - Uniknięta emisja zanieczyszczeń CO2 – 21,103 Mg/rok. Tym samym projekt kreuje listę wskaźniki rezultatu bezpośredniego, którą prezentuje SzOOP, do której możemy zaliczyć: - produkcję energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 29,602 MWhe/rok, - produkcję energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 39,98 MWht/rok, - ilość zaoszczędzonej energii elektrycznej – 9,57 MWh/rok, - ilość zaoszczędzonej energii cieplnej – 47,87 GJ/rok. Dzięki wdrożeniu nowej technologii zmniejszeniu ulegnie energia końcowa z 344,17 GJ/rok do poziomu 137,37 GJ/rok. Koszty utrzymania obiektu w stanie istniejącym wynoszą 35 342,29 zł, po modernizacji będą wynosić 2 703,85zł. (Polish)
    0 references
    The main objective of the project: “Improvement of the energy efficiency of PHU IR-MAR s.c” is to achieve the best environmental parameters. Poland, as a Member State of the EU, is required to pursue the best possible environmental parameters (reductions in greenhouse gases, suspended particulates, restrictions on the use of raw materials). It is therefore important to take preventive action today. The project takes into account the following scope of modernisation works: • modernisation of the CO installation with the replacement of the heat source• modernisation of the installation of CWU,• modernisation of the lighting installation,• modernisation of the ventilation system• replacement of the “kodwo-steam furnace”• modernisation of the power plant (installation of solar panels with a power of 27.06 kW). The project is in line with the assumption set out in the ROP WiM for the 4th ROP. Priority axis: — Renewable energy utilisation rate 95.92 %, — energy efficiency — 60.09 % reduction — 91.48 % CO2Reduction, CO2-emissions avoided — 21,103 Mg/year. As a result, the project creates a list of direct result indicators, presented by the SzOOP, to which we can include: — electricity production from newly built RES installations — 29,602 MWhe/year, — heat generation from newly built RES installations — 39,98 MWHT/year, — amount of saved electricity — 9.57 MWh/year — amount of saved heat energy — 47,87 GJ/year. With the implementation of the new technology, the final energy will be reduced from 344,17 GJ/year to 137,37 GJ/year. The costs of maintaining the site in the current state amount to PLN 35 342,29, which will be PLN 2 703,85 after modernisation. (English)
    0 references

    Identifiers

    RPWM.04.02.00-28-0065/18
    0 references