Installation of a photovoltaic installation at Investmax Sp. z o.o. Sp.k. in Ljubljana, Podkarpackie Province (Q118555): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2527999 / rank | |||
Normal rank |
Revision as of 18:51, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a photovoltaic installation at Investmax Sp. z o.o. Sp.k. in Ljubljana, Podkarpackie Province |
Project in Poland financed by DG Regio |
Statements
448,698.0 zloty
0 references
649,292.4 zloty
0 references
85.0 percent
0 references
1 June 2020
0 references
31 December 2021
0 references
INVESTMAX SP. Z O.O. SP. K.
0 references
Projekt dotyczy podłączonej do sieci instalacji fotowolt. na dachach budynków firmy Investmax Sp. z o.o. Sp. k wraz z urządzeniami elektrycznymi zasilania nadmiarowego w miejscowości Lubenia w woj. Podkarpackim. Jedna mikroinst. będzie się składać z 140 modułów PV o łącznej mocy 39,2 kWp oraz 2 falowników. Łączna pow. modułów w mikroinst. wyniesie 233,8 m2. Energia wyprod. przez jedną mikroinst. wyniesie 36 019 kWh; Dzięki instalacji PV emisja CO2 do atmosfery, której uda się uniknąć to 29 715 kg/rok(jedna mikroinst.). Takich instalacji będzie 3. Łączne uniknięcie emisji CO2 z wszystkich 3 instalacji to 89,14 ton/rok. Łączna moc generatora wynosi 0,11 MWe. Wykorzyst. odn. źródeł energii wpłynie na racjonalizację zużycia energii, zwiększenie jej efektywności oraz polepszenie standardów świadczonych usług. W dalszej perspektywie czasowej inwestycja znacznie zmniejszy wyd. finansowe beneficjenta. Ponadto inwestycja wpłynie na poprawę środow. naturalnego w regionie, poprzez zmniejszenie emisji CO2 do atmosfery. Zasadniczym celem projektu jest: •obniżenie kosztów zakupu energii elektrycznej z sieci•zapewnienie bezpiecz. energetycznego dla firmy•redukcja zanieczyszczeń atmosfery w postaci ograniczenia emisji gazu CO2 w ilości proporcjonalnej do ilości energii elektrycznej uzyskanej z instalacji fotowolt.•promowanie energii pochodzącej z OZE•zwiększenie udziału energii odnawialnej w produkcji energii w ujęciu krajowym •poprawa bezpiecz. energe., co wpisuje się bezpośrednio w politykę energetyczną UE. Zakres elementów instalacji został uszczegółowiony w punkcie B.2 w zad. 2.Przyłącza do sieci nn znajdują się w lokalizacji budynków-zaciski prądowe na wyjściu przewodów od zabezpieczenia w kierunku instalacji – połączone z licznikami w budynkach (skrzynki w obrębie budynków). Do jednego z łączy zostanie poprowadzona linia kablowa-elektryczna, łącząca jedną z mikroinst. z łączem odległym na dz. 18/23.W przypadku mikroinst. koszt układu pom.-rozl. pokrywa operator energet. (Polish)
0 references
The project concerns an installation connected to the installation of a foolt installation on the roof of Investmax Sp. z o.o. buildings, together with the excess power supply equipment in Lübeck in the province of Lübeck. Podkarpackie. One microst will be composed of 140 PV modules with a combined output of 39,2 kWp and 2 inverters. The total number of modules in microprint will be 233.8 m². 36 019 kWh; Installations PV CO2 emissions to be avoided at 29 715 kg/year (one against.). Such installations will be 3. The total avoided CO2 emissions from all 3 installations are 89,14 tonnes/year. The total power of the generator is 0,11 MWe. Energy efficiency will improve energy efficiency, increase efficiency and improve service standards. In the longer term, the investment will significantly reduce the financial position of the beneficiary. In addition, the investment will improve the region’s environment by reducing CO2 emissions. The main aim of the project is to: • reduce the costs of purchasing electricity from the grid• Ensure an energy efficient for the firm• Ensure an energy efficient for the company• Reduction of atmospheric pollution in the form of a reduction in CO2 emissions in proportion to the amount of electricity generated by the fottolt installation.• Promotion of energy from RES• Increase the share of renewable energy in energy production on a national basis• improve safety. energy, which is directly linked to EU energy policy. The scope of the components of the installation has been specified in point B.2 in the zd. 2.Links to the network nn are located at the location of a current terminal at the outlet of the cable from the security to the installation — combined with the number of buildings in the building (inside the building boxes). One of the lines will be connected to an electric cable, combining one of the micro lines with a remote link to the dz. 18/23.W The case of microcother the cost of the pumping system shall be borne by the energy operator. (English)
0 references
Identifiers
RPPK.03.01.00-18-0398/17
0 references