RES installations in private buildings for the residents of the municipality of Wojława (Q104771): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Wojsławice / rank
 
Normal rank

Revision as of 12:32, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RES installations in private buildings for the residents of the municipality of Wojława
Project in Poland financed by DG Regio

    Statements

    0 references
    1,669,277.39 zloty
    0 references
    400,626.57359999995 Euro
    13 January 2020
    0 references
    2,180,248.22 zloty
    0 references
    523,259.5728 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 April 2016
    0 references
    30 September 2019
    0 references
    GMINA WOJSŁAWICE
    0 references
    Projekt dotyczy zakupu i montażu 143 zestawów instalacji solarnej w indywidualnych budynkach mieszkalnych, 10 pomp ciepła do podgrzania cwu w mieszkalnych budynkach indywidualnych oraz 6 kotłów na biomasę i 3 gruntowych pomp ciepła do przygotowania ciepłej wody użytkowej i na potrzeby centralnego ogrzewania. Inwestycja będzie realizowana na podstawie projektów wzorcowych. Na potrzeby inwestycji przygotowano projekty na następujące instalacje: 1. Dla gospodarstw domowych do 4 osób: instalacja kolektorów słonecznych składająca się z 2 absorberów słonecznych,-113 kpl. 2. Dla gospodarstw domowych od 5 do 6 osób: instalacja kolektorów słonecznych składająca się z 3 absorberów słonecznych, -26 kpl. 3. Dla gospodarstw domowych powyżej 7 osób: instalacja kolektorów słonecznych składająca się z 4 absorberów słonecznych - 4kpl. dodatkowo każdy zestwa będzie wyposażony w zasobnik ciepłej wody użytkowej, rurociągi glikolowe, moduły pompowe z automatyką i grupa bezpieczeństwa. 4. Dla gospodarstw domowych do 6 osób: instalację monoblokowej pompy ciepła powietrze-woda na potrzeby ciepłej wody użytkowej-10kpl. 5. Instalację kotłów o mocy do 25 kW wykorzystujące jako paliwo biomasę w postaci pelletu drzewnego oraz drzewa-6kpl. 6. Instalację gruntowych pomp ciepła-3 kpl. Celem głównym przedsięwzięcia jest skuteczniejsze i bardziej wszechstronne wykorzystanie OZE w bilansie energetycznym Gminy dla potrzeb ochrony środowiska naturalnego, poprawy jakości życia oraz tworzenia sprzyjających warunków dla rozwoju potencjału gospodarczego, sektora turystyki i rekreacji oraz promowania rozwoju sektora usługowego okołoturystycznego. Rezultaty: moc urządzeń z OZE-0,67MW, uzysk OZE-390,23MWh, redukcja CO2-256,59t/rok. Gmina nie posiada programu ochrony powietrza i nie ma konieczności opracowania takiego programu (brak przekroczeń poziomów dopuszczalnych). (Polish)
    0 references
    The project concerns the purchase and fitting of 143 kits of solar installation in individual residential buildings, 10 heat pumps to heat the CWU in individual residential buildings and 6 biomass and 3 boiler heat pumps for the preparation of hot water and for central heating. The investment will be carried out on the basis of standard projects. For the purpose of the investment, projects were prepared for the following installations: 1. For households up to 4: installation of solar collectors consisting of 2 solar absorbers, -113 kpl. 2. For households between 5 and 6: installation of solar collectors consisting of 3 solar absorbers, -26 kpl. 3. For households above 7: the installation of solar collectors consisting of 4 solar absorbers, 4 kg. in addition, each of the countries will be equipped with a hot water storage tank, clay pipelines, pump building modules and a security group. 4. For households up to 6: installation of an air-water monobloc pump for domestic hot water use -10kpl. 5. The installation of boilers of up to 25 kW with biomass fuel in the form of wood repellents and 6kpl. 6. The installation of underground pumping stations -3 kpl. The main objective of the project is to make more efficient and comprehensive use of RES in the Municipality’s balance sheet for environmental protection, to improve the quality of life and to create favourable conditions for the development of economic, tourism and leisure activities and to promote the development of a myristic services sector. Results: installation capacity of OE-0.67 MW, O390.23 MWh, CO2-256.59 t/year reduction. The municipality does not have an air quality programme and there is no need to draw up such a programme (no exceedances of limit levels). (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0194/16
    0 references