Upgrading transmission infrastructure in Opole — continuation — Phases II and III (Q84836): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2514178 / rank
 
Normal rank

Revision as of 19:08, 9 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Upgrading transmission infrastructure in Opole — continuation — Phases II and III
Project in Poland financed by DG Regio

    Statements

    0 references
    5,534,920.0 zloty
    0 references
    1,328,380.8 Euro
    13 January 2020
    0 references
    17,086,269.0 zloty
    0 references
    4,100,704.56 Euro
    13 January 2020
    0 references
    40.0 percent
    0 references
    19 July 2018
    0 references
    31 December 2022
    0 references
    ENERGETYKA CIEPLNA OPOLSZCZYZNY SPÓŁKA AKCYJNA
    0 references
    0 references
    0 references
    Projekt realizowany jest w systemie ciepłowniczym Opola. Projekt realizuje się z uwagi na wyznaczone cele w PGN miasta Opola w zakresie poprawy jakości powietrza poprzez zmniejszenie zużycia energii pierwotnej, zmniejszenie emisji CO2 oraz zmniejszenie emisji pyłu do atmosfery. Projekt składa się z 10 zadań, które będą realizowane w województwie opolskim, w gminie/mieście Opole, w rejonie ulic: Oleskiej, Katowickiej, Krakowskiej, Żwirki i Wigury, Waryńskiego, Kopernika, Podgórnej, Kamiennej, Okulickiego, Sosnkowskiego i Koraszewskiego.Projekt zakłada modernizację infrastruktury ciepłowniczej i będzie obejmował przebudowę sieci cieplnych, budowę przyłączy cieplnych o łącznej długości 2,63 km oraz budowę 18 nowoczesnych węzłów indywidualnych skutkującą likwidacją 6 węzłów grupowych. Projekt obejmuje dwa typy zadań. Pierwszy z nich zakłada przebudowę odcinków kanałowej sieci cieplnej wysokoparametrowej na sieć w technologii materiałów preizolowanych w rejonie ulic: Oleskiej, Katowickiej, Okulickiego i Sosnkowskiego w Opolu. Istniejące odcinki sieci kanałowej są w złym stanie technicznym, posiadają wżery, kanały są rozszczelnione, a izolacja termiczna i stalowe elementy konstrukcyjne zdegradowane. Stan ten powoduje awarie i niezbędna jest w związku z tym przebudowa ww. odcinków sieci. Drugi typ zadań związany jest z likwidacją węzłów grupowych i ze zmianą sposobu dotychczasowego zasilania w ciepło budynków w rejonie ulic w rejonie ulic: Żwirki i Wigury, Waryńskiego, Kopernika, Podgórnej, Kamiennej i Koraszewskiego w Opolu. W tym celu planuje się zastąpienie niskotemperaturowych, czteroprzewodowych sieci cieplnych rozdzielczych, wybudowanych w technologii kanałowej - doprowadzających ciepło do budynków za pośrednictwem węzła grupowego - sieciami i przyłączami wysokich parametrów, wybudowanych z materiałów preizolowanych - dostarczających ciepło za pośrednictwem nowych indywidualnych węzłów wymiennikowych, wyposażonych w układy automatyki i sterowania... (Polish)
    0 references
    The project is carried out in the Opole district heating system.The project is carried out in view of the objectives set in the PGN of the city of Opole in terms of improving air quality by reducing primary energy consumption, reducing CO2 emissions and reducing dust emissions to the atmosphere.The project consists of 10 tasks to be carried out in Opolskie Province, in the municipality/city of Opole, in the street:Oleska, Katowicka, Krakowska, Kraków, Żwiki and Wigury, Waryńskiego, Kopernik, Podgórze, Kamienski, Okuliki, Sosnkowski and Koraszewkigoa.The project involves modernisation of the district heating infrastructure and will involve the reconstruction of heat networks, construction of thermal connections for a total length of 2.63 km and the construction of 18 modern individual nodes resulting in the removal of 6 block hubs.The project comprises two types of tasks.The first consists of the conversion of sections of the high-parametric heat network into a network of pre-insulated materials in the street area:Oleska, Katowicka, Okuliatski and Sosnowiec in Opole.The existing ducts of the duct network are in poor technical condition, have a gel, the ducts are honoured and the thermal insulation and the steel components of the degraded construction are degraded.This state of affairs is resulting in accidents and it is therefore necessary to rebuild the aforementioned sections of the network.The second type of tasks relates to the abolition of group nodes and the change in the way in which the buildings are fully heated in the street area in the street area:Żwirki and Wigury, Waryński, Kopernik, Podobnik, Kamienna and Korazewski in Opole.For this purpose, it is planned to replace low-temperature, four line distribution networks, built with the channel technology, bringing the heat to the buildings via the group junction — networks and high parameters connections built from pre-insulated materials — supplying the heat by means of new individual interchangeable hubs equipped with automation and control systems... (English)
    0 references

    Identifiers

    POIS.01.05.00-00-0026/18
    0 references