ENERGY ADJUSTMENT BONAZZA SPA (Q2074079): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 01:20, 9 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
ENERGY ADJUSTMENT BONAZZA SPA
Project in Italy financed by DG Regio

    Statements

    0 references
    50,000.0 Euro
    0 references
    100,000.0 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    7 August 2018
    0 references
    16 July 2018
    0 references
    BONAZZA SPA
    0 references
    0 references
    0 references

    45°26'13.88"N, 12°20'4.52"E
    0 references
    L'ANALISI DEI DATI RACCOLTI NEL CORSO DELL'AUDIT ENERGETICO HA PERMESSO DI METTER IN EVIDENZA UNA SITUAZION ABBASTANZA CRITICA RELATIVA ALLA CENTRALE DI PRODUZIONE DEL FREDDO, TAGLIA CIRCA 1700 KW. SONO STATE RACCOLTE DELLE EVIDENZE E SIMULATI DEGLI SCENARI. DAGLI STESSI EMERGE CHE LA RISTRUTTURAZIONE ANCHE SE PARZIALE PER CONTENERE I COSTI COMPORTEREBBE GRANDI BENEFICI ENERGETICI NONCHE' A GARANZIA DELLA CONTINUITA' DI SERVIZIO CAUSA LA VETUSTA' DEL SISTEMA ESISTENTE. LA SOLUZIONE INDIVIDUATA CONSTA NEL SOSTITUIRE COMPRESSORI DI TIPO ALTERNATIVO ON-OFF CON COMPRESSORI MODULANTI A VITE. L'ABBANDONO DI VECCHI BANCHI DI COMPRESSORI PERMETTE ANCHE DI ABBANDONARE SCAMBIATORI AGGIUNTIVI MOTIVO DI INEFFICIENZA.ALTRO INTERVENTO SIGNIFICATIVO RIGUARDA L'INSERIMENTO DI UNA NUOVA CENTRALE PER LA PRODUZIONE DI VAPORE SOPRATTUTTO PER LE TAGLIE DI POTENZA IN GIOCO PARI A 2300 KW. (Italian)
    0 references
    THE ANALYSIS OF THE DATA COLLECTED IN THE COURSE OF THE ENERGY AUDIT REVEALED A SUFFICIENTLY CRITICAL SITUATION WITH REGARD TO THE POWER PLANT IN THE COLD STORE, WHICH WAS APPROXIMATELY 1 700 KW. EVIDENCE HAS BEEN COLLECTED AND SIMULATED OF THE SCENARIOS. IT IS APPARENT FROM THEM THAT THE RESTRUCTURING, EVEN IF ONLY PARTIALLY IN ORDER TO CONTAIN THE COSTS, WOULD LEAD TO MAJOR ENERGY BENEFITS WHICH DO NOT GUARANTEE CONTINUITY OF SERVICE AS A RESULT OF THE AGE OF THE EXISTING SYSTEM. THE SOLUTION FOUND CONSISTS OF REPLACING ON-OFF RECIPROCATING COMPRESSORS WITH SCREW MODULATING COMPRESSORS. THE ABANDONMENT OF OLD COMPRESSOR COUNTERS ALSO MAKES IT POSSIBLE TO ABANDON ADDITIONAL PARTS OF INEFFICIENZA.ALTRO DUE TO THE INCLUSION OF A NEW POWER PLANT IN THE CASE OF STEAM PRODUCTION, IN PARTICULAR IN THE CASE OF 2 300 KW ACTIVE POWER SIZES. (English)
    0 references

    Identifiers

    B72E17002780007
    0 references