(10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE (Q2056970): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 22:58, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000050) ENERGY EFFICIENCY IN THE ENERGY EFFICIENCY OF THE SARROCCHI INSTITUTE
Project in Italy financed by DG Regio

    Statements

    0 references
    468,784.15 Euro
    0 references
    1,186,795.31 Euro
    0 references
    39.5 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    AMMINISTRAZIONE PROVINCIALE DI SIENA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO PREVEDE INTERVENTI DI MIGLIORAMENTO IN PARTICOLARE:INTERVENTON.1:SOSTITUZIONE DI SERRAMENTI E INFISSI DEL LOTTO 1.L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELLE FINESTRE A UW=1,5W/M2K E DELLE PORTEFINESTRE A UW =1,615W/M2K.LE LAVORAZIONI SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO PREVISTO NELL?INTERVENTO N.1, SMONTAGGIO INFISSI, RIMONTAGGIO NUOVI INFISSIINTERVENTO N.2: ISOLAMENTO TERMICO SOLAIO DI COPERTURA DEL LOTTO 1. L?OBBIETTIVO ? DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,188 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.06 W/M2K. IL PROGETTO PREVEDE LA POSA DI 18 CM DI LANA DI ROCCIA AD ALTA DENSIT? E SUCCESSIVA POSA DI GUAINA IMPERMEABILIZZANTE. VISTA L?ESTENSIONE DELLE COPERTURE,LE STESSE SI POSSONO SUDDIVIDERE IN 6 ZONE IN BASE ALL?ALTEZZA E SUPERFICIE.LE ZONE DEFINIRANNO LE FASI TEMPORALI DELL?INTERVENTO CHE SI POSSONO COS? SINTETIZZARE: MONTAGGIO PONTEGGIO, DEMOLIZIONE VECCHIA GUAI (Italian)
    0 references
    DOES THE PROJECT ENVISAGE IMPROVEMENT MEASURES IN PARTICULAR: INTERVENTON.1: WINDOW FRAMES AND WINDOW FRAMES OF 1.L? OBJECTIVE? TO REDUCE LOSSES BY BRINGING THE TRANSMITTANCE OF WINDOWS INTO UW = 1,5W/M2K AND WINDOWS AT UW = 1,615W/M2K.WERE FURTHER COS? TO SUMMARISE: INSTALLATION OF SCAFFOLDING, WHICH MUST BE ENCLOSED? MEASURE NO 1, DISMANTLING OF FIXTURES AND FITTINGS, REASSEMBLING NEW FIXTURES AND FITTINGS, AND 2: STANDARD HEAT INSULATION OF THE COVER OF LOT 1. OBJECTIVE? REDUCE LOSSES BY BRINGING THE TRANSMITTANCE AT 0,188 W/M2K, AND THE SUMMER THERMAL LOSSES BY BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.06 W/M2K. DOES THE PROJECT INVOLVE 18 CM OF SHAPIT WOOL? AND SUBSEQUENT RELEASE OF A WATERPROOF CASING. IN VIEW OF THE EXTENSION OF THE COVER, CAN THEY BE DIVIDED INTO 6 ZONES ACCORDING TO THE HEIGHT AND SUPERIFIEI ZONES WILL DEFINE THE TIME STAGES OF THE OPERATION, WHICH CAN BE COS? TO SUMMARISE: SCAFFOLDING, DEMOLITION AND DEMOLITION (English)
    0 references

    Identifiers