141_XII_411_INTERVENTION OF ENERGY EFFICIENCY IN THE CITY OF ROME AND IN THE MIDDLE SCHOOL OF EUROPE (Q2051813): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 21:49, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | 141_XII_411_INTERVENTION OF ENERGY EFFICIENCY IN THE CITY OF ROME AND IN THE MIDDLE SCHOOL OF EUROPE |
Project in Italy financed by DG Regio |
Statements
336,550.41 Euro
0 references
673,100.83 Euro
0 references
50.0 percent
0 references
12 October 2017
0 references
31 March 2020
0 references
COMUNE DI OSSI
0 references
L¿ INTERVENTO NELLA CASA COMUNALE E NELLA SCUOLA MEDIA DI VIA EUROPA RIGUARDA IL MIGLIORAMENTO DELLE PRESTAZIONI ENERGETICHE DELL¿IMPIANTO DI CLIMATIZZAZIONE. L¿INTERVENTO CONSISTE NELLA RIMOZIONE DELL¿ATTUALE IMPIANTO DI RISCALDAMENTO DOTATO SISTEMA DI PRODUZIONE DEL CALORE ATTRAVERSO CALDAIA A GASOLIO CON GENERATORE OBSOLETO E L¿INSERIMENTO DI UNA CALDAIA A CONDENSAZIONE CALCOLATA PER LA POTENZA NECESSARIA ALLE DISPERSIONI TERMICHE DELL¿EDIFICIO. SI PREVEDE INOLTRE L¿INSTALLAZIONE DI UN IMPIANTO FOTOVOLTAICO DA 20 KWP AD INTEGRAZIONE ARCHITETTONICA CON SISTEMA DI ACCUMULO A BATTERIE AGLI IONI DI LITIO INSERITI IN SISTEMA DI FILIERA CERTIFICATA PER LO SMALTIMENTO E RECUPERO DEGLI STESSI A FINE VITA UTILE (Italian)
0 references
THIS INTERVENTION IN THE MUNICIPALITY’S HOUSE AND IN THE MIDDLE SCHOOL OF EUROPE RELATES TO THE IMPROVEMENT OF THE ENERGY PERFORMANCE OF THE AIR CONDITIONING SYSTEM. THIS INTERVENTION CONSISTS OF THE REMOVAL OF THE CURRENT HEATING SYSTEM WITH A HEAT PRODUCTION SYSTEM THROUGH A GAS OIL BOILER WITH AN OBSOLETE GENERATOR, AND INSERTED IN THE INSERTION OF A CONDENSING BOILER CALCULATED FOR THE POWER REQUIRED FOR THERMAL STANDING POSITIONS THAN THE BUILDING. IT IS ALSO EXPECTED THAT THE INSTALLATION OF A PHOTOVOLTAIC POWER PLANT OF 20 KWP IS EXPECTED TO BE ARCHITECTURAL INTEGRATION WITH A STORAGE SYSTEM FOR LITHIUM ION BATTERIES INCLUDED IN A CERTIFIED SYSTEM FOR THE DISPOSAL AND RECOVERY OF THE SAME PRODUCTS AT THE END OF LIFE. (English)
0 references
Identifiers
B46C18000070002
0 references