RIVER ENERGY S.R.L. (Q2038087): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE ACTION, IN SUMMARISED FORM, COUNTS IN THE INSTALLATION OF A LEVEL METER ON THE CHANNEL, IN COMMUNICATION WITH THE POWER STATION, ENABLING THE OPERATOR TO KNOW THE LEVEL OF THE CHANNEL IN REAL TIME. IN REAL TIME, THEREFORE, THE OPERATOR MAY DECIDE, IN THE EVENT THAT THE EXTENT OF THE COURSE OF WATER IS EXCESSIVE, TO CLOSE (OR ADJUST) ACCESS TO THE CHANNEL IN ORDER TO AVOID THE SWINGING-UP OF THE CANAL, TO OPEN (OR TO SETTLE) THE GATE ONTO THE...)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 19:09, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
RIVER ENERGY S.R.L.
Project in Italy financed by DG Regio

    Statements

    0 references
    9,915.0 Euro
    0 references
    19,830.0 Euro
    0 references
    50.0 percent
    0 references
    12 July 2016
    0 references
    29 August 2018
    0 references
    15 January 2017
    0 references
    RIVER ENERGY S.R.L.
    0 references
    0 references
    0 references

    44°4'11.57"N, 7°52'16.64"E
    0 references
    L'INTERVENTO, SINTETICAMENTE, CONTA NELL'INSTALLAZIONE DI UN MISURATORE DI LIVELLO SUL CANALE, IN COMUNICAZIONE CON LA CENTRALE, TALE DA PERMETTERE ALL'OPERATORE DI SAPERE IN TEMPO REALE IL LIVELLO DEL CANALE. IN TEMPO REALE, QUINDI, L'OPERATORE PUO' DECIDERE, QUALORA LA PORTATA DEL CORSO D'ACQUA FOSSE ECCESSIVA, DI CHIUDERE (O REGOLARE) L'ACCESSO AL CANALE PER EVITARE L' INGHIAIAMENTO DEL CANALE, APRIRE (O REGOLARE) LA PARATOIA SULLA DESABBIATRICE, PRESERVANDO DALL'INGHIAIAMENTO IL CANALE, LA VASCA DI CARICO E LA SUCCESSIVA TURBINA. SI RIMANDA ALLA RELAZIONE ALLEGATA PER I DETTAGLI (Italian)
    0 references
    THE ACTION, IN SUMMARISED FORM, COUNTS IN THE INSTALLATION OF A LEVEL METER ON THE CHANNEL, IN COMMUNICATION WITH THE POWER STATION, ENABLING THE OPERATOR TO KNOW THE LEVEL OF THE CHANNEL IN REAL TIME. IN REAL TIME, THEREFORE, THE OPERATOR MAY DECIDE, IN THE EVENT THAT THE EXTENT OF THE COURSE OF WATER IS EXCESSIVE, TO CLOSE (OR ADJUST) ACCESS TO THE CHANNEL IN ORDER TO AVOID THE SWINGING-UP OF THE CANAL, TO OPEN (OR TO SETTLE) THE GATE ONTO THE DESABBIOATRICE, WHILE PRESERVING THE CHANNEL, THE LOAD TANK AND THE NEXT TURBINE. REFER TO ATTACHED REPORT FOR DETAILS (English)
    0 references

    Identifiers

    G21F18000100007
    0 references