NAPLES PORT — ROAD AND RAIL CONNECTIONS WITHIN THE PORT (Q2017483): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 15:30, 8 June 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | NAPLES PORT — ROAD AND RAIL CONNECTIONS WITHIN THE PORT |
Project in Italy financed by DG Regio |
Statements
19,875,000.0 Euro
0 references
26,500,000.0 Euro
0 references
75.0 percent
0 references
19 July 2019
0 references
31 December 2021
0 references
ADSP DEL MAR TIRRENO CENTRALE
0 references
E' PREVISTO IL RIASSETTO DELLA VIABILITà PORTUALE. IN DETTAGLIO, IL COLLEGAMENTO STRADALE TRA LA DARSENA DI LEVANTE, IL SETTORE PORTUALE DI PONENTE E L'AUTOSTRADA Ê COSTITUITO DA UNO SVINCOLO A ROTATORIA (A RASO) DA REALIZZARSI IN CORRISPONDENZA DELL'ATTUALE VARCO BAUSAN, A CUI SI COLLEGHERà UN VIADOTTO DI RACCORDO CON L'ESISTENTE VIABILITà . L'INTERVENTO SI CONCRETIZZA IN UN RIASSETTO DI STRADE GIà ESISTENTI, AL FINE DI AUMENTARE LA SICUREZZA E RIDURRE CONTEMPORANEAMENTE L'INQUINAMENTO. E' INOLTRE PREVISTO NELL'AMBITO DEL QUADRO ECONOMICO DEL PROGETTO IL RIASSETTO DELLA RETE FERROVIARIA. (Italian)
0 references
PROVISION IS MADE FOR THE RESTRUCTURING OF THE VIABILIT-PORT. IN DETAIL, THE ROAD LINK BETWEEN THE LEVANT DARSENA, THE PONENTE PORT AREA AND THE ÃO MOTORWAY CONSISTING OF A ROUNDABOUT RELEASE TO BE CARRIED OUT IN LINE WITH THE CURRENT BAUSAN GATE, TO WHICH THE EXISTING BAUSAN INTERFACE WITH THE EXISTING VIABILITS. THE INTERVENTION TAKES THE FORM OF A REHABILITATION OF EXISTING ROADS IN ORDER TO INCREASE SAFETY AND REDUCE POLLUTION AT THE SAME TIME. IT IS ALSO FORESEEN WITHIN THE ECONOMIC FRAMEWORK OF THE PROJECT THE REHABILITATION OF THE RAIL NETWORK. (English)
0 references
Identifiers
I64B12000140006
0 references