Making energy savings additional to the premises of the House of Social Services in Lithods (Q72279): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: Cohesion Fund / rank
 
Normal rank

Revision as of 17:18, 7 June 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Making energy savings additional to the premises of the House of Social Services in Lithods
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    967,897.2 Czech koruna
    0 references
    38,715.888 Euro
    10 January 2020
    0 references
    2,419,743.0 Czech koruna
    0 references
    96,789.72 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    9 August 2017
    0 references
    29 April 2019
    0 references
    30 June 2019
    0 references
    Město Žatec
    0 references
    0 references
    0 references

    50°19'26.26"N, 13°32'28.79"E
    0 references

    50°18'44.28"N, 13°31'58.12"E
    0 references

    50°16'53.29"N, 13°26'32.96"E
    0 references
    43801
    0 references
    Záměrem projektu je realizace úspor energie ve veřejné budově na adrese Libočany č.p. 28 (p.č.st. 148/1 v k.ú. Libočany), která spočívá v zateplení obvodových konstrukcí objektu, zateplení střechy a výměně výplní otvorů. Opatření budou realizována v souladu s PD, pol. rozpočtem a EP tak, aby byly dodrženy všechny parametry. Realizací všech opatření budou vylepšeny tepelně technické vlastnosti obvodových konstrukcí, minimalizovány tepelné ztráty objektu a sníženy provozní náklady. (Czech)
    0 references
    The project aims at realising energy savings in the public building at the address of Listrana No. p. 28 (ref. no. 148/1 in the cadastral district of the cadastral district. “Sweets”), which consists of the insulation of the peripheral structure of the building, the insulation of the roof and the replacement of the hole filling. The measures will be implemented in accordance with the PD, the budget and the EP in order to comply with all parameters. Implementation of all measures will improve the thermal technical properties of the perimeter structures, minimise heat loss to the object and reduce operational costs. (English)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001677
    0 references