Risk analysis of the impact of the former pump station and of the PHM on the drinking water source for the Pičín local primary and parent school and impact on the water manager of the planer (Q62275): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 16:30, 7 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Risk analysis of the impact of the former pump station and of the PHM on the drinking water source for the Pičín local primary and parent school and impact on the water manager of the planer |
Project in Czech Republic financed by DG Regio |
Statements
1,430,898.5 Czech koruna
0 references
1,683,410.0 Czech koruna
0 references
85 percent
0 references
17 October 2016
0 references
13 September 2017
0 references
30 September 2017
0 references
Kolařík Hluboš, spol. s r.o.
0 references
26225
0 references
Předmětem projektu je získání dat a informací o míře a rozsahu kontaminace horninového prostředí, podzemních a povrchových vod v důsledku existence staré ekologické zátěže v místě bývalé čerpací stanice pohonných hmot v areálu společnosti Kolařík Hluboš v Pičíně. (Czech)
0 references
The purpose of the project is to obtain data and information on the extent and extent of contamination of the rock environment, groundwater and surface water as a result of the existence of an old environmental ballast in the site of the former fuel station at Kolřík Hluboš in Pisa. (English)
0 references
Identifiers
CZ.05.3.24/0.0/0.0/15_007/0000440
0 references